Seismic (SM) Flashcards

1
Q

What is the acceleration of a Safe Shutdown Earthquake?

A

0.20g or about 6.0 on the Richter Scale
“Maximum earthquake potential considering the regional and local geology and seismology that would produce maximum ground motion”.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What is the acceleration of a Operational Basis Earthquake?

A

0.10g
“The vibratory ground motion for which those features of the plant necessary for continued operation without undue risk to the health and safety of the public will remain functional”

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Which design earthquake (OBE or SSE) is the maximum potential for the area of Tonopah?

A

(SSE) Safe Shutdown Earthquake

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

How long after an OBE is exceeded does Civil have to perform a level 2 analysis?

A

7 days

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

What is the STA determining in the level 1 seismic analysis?

A

Did an event occur that exceeded an OBE?

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

What action is required if an OBE is exceeded?

A

Shutdown the plant (mode 3 to mode 5) and perform engineering analysis

How well did you know this?
1
Not at all
2
3
4
5
Perfectly