Boric Acid Concentrator (BAC) Flashcards

1
Q

The BAC CONC TRBL alarms in the control room…

A

…with no time delay.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

The BAC HUT alarm set points are…

A

hi-hi level alarm at 42’
high level alarm at 17’
low level alarm at 4’
low-low level alarm at 28” (HUT pump trip)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

When in the normal position, which signals will stop the holdup pump:

A
  • Lo-lo holdup tank level (28”)
  • Hi-Hi boric acid concentrator flash tank level.
  • Other holdup tank pump starts.
  • Diversion of letdown flow CH-500 to the pre-holdup ion exchanger when the holdup tank contents are being re-purified (CH-V686 open).
  • Electrical protection or loss of control power.
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

A BAC steam vapor release to __(1)__ and requires a __(2)__ due to __(3)__

A

(1) the plant vent
(2) a Radioactive Effluents Discharge Permit
(3) Steam vapor contains tritium as part of the water molecule

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

What cools the BAC concentrates?

A

NC - Nuclear Cooling Water

How well did you know this?
1
Not at all
2
3
4
5
Perfectly