1
Q

What is the power supply for the Pressurizer Pressure control Master Controller (RCN-PIC-100)?

A

NNN-D12

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What is the low level cut-out bistable setpoint?

A

25% level in the pressurizer in either (when selected to both) level transmitter
(reset at 27%)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

What are the power supplies for the Class Backup heaters?

A

PGA/PGB

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

What are the power supplies for pressure transmitters PT-100X and PT-100Y?

A

PT-100X = NNN-D12

PT-100Y = NNN-D11

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

At what pressure will the Hi Pressurizer pressure alarm disable all heaters?

A

2285 psia
(reset at 2275 psia)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Describe the actions as output of the Pressurizer Pressure Master controller goes up.

A
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Which Pressurizer heater trip on a SIAS?

1) Proportional
2) Class Back-up
3) Non-class Back-up

A) 1 and 3
B) 2 and 3
C) 1 ONLY
D) 2 ONLY

A

D) 2 ONLY

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

How long does the operator have to wait before re-initiating Setpoint Override?

A
  • Take HS to OFF then to ON.
    o White OVERRIDE light illuminates.
    o After a 10 second time delay, the override can be canceled by taking the HS to OFF.