Pressurizer Pressure Control Flashcards
What is the power supply for the Pressurizer Pressure control Master Controller (RCN-PIC-100)?
NNN-D12
What is the low level cut-out bistable setpoint?
25% level in the pressurizer in either (when selected to both) level transmitter
(reset at 27%)
What are the power supplies for the Class Backup heaters?
PGA/PGB
What are the power supplies for pressure transmitters PT-100X and PT-100Y?
PT-100X = NNN-D12
PT-100Y = NNN-D11
At what pressure will the Hi Pressurizer pressure alarm disable all heaters?
2285 psia
(reset at 2275 psia)
Describe the actions as output of the Pressurizer Pressure Master controller goes up.
Which Pressurizer heater trip on a SIAS?
1) Proportional
2) Class Back-up
3) Non-class Back-up
A) 1 and 3
B) 2 and 3
C) 1 ONLY
D) 2 ONLY
D) 2 ONLY
How long does the operator have to wait before re-initiating Setpoint Override?
- Take HS to OFF then to ON.
o White OVERRIDE light illuminates.
o After a 10 second time delay, the override can be canceled by taking the HS to OFF.
o 10 seconds must then elapse before the override can be re-initiated.