Radiation Monitoring (SQ) Flashcards

1
Q

What is the power supply for the safety related Radiation Monitoring System?

A
  • Safety related RMS:
    o Class 120Vac (PN) for RM and 480V (PH) for sample pumps
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What powers the Radiation Monitoring System (RMS) Server and Control Room workstation?

A
  • RMS server and components
    o SW-1 in Normal (PHA-M33)
    o SW-1 in Alternate (NHN-M26)
  • MCR workstations
    o Normal PHA-M33
    o Loss of power – unplug and use non-class power outlet
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

What is the basis for the Effluent Monitor set-points?

A
  • Set-points prevent exceeding 10CFR100 limits.
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

What kind of radiation do Area Monitors detect?

A

Area Monitors
* Measure gamma radiation

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

What Radiation Monitors have Tech Spec implications?

A

Ru-1 - 3.4.16 RCS Leak Detection
Ru-29/30 - 3.3.9 CREFAS
Ru-37/38 - 3.3.8 CPIAS
Ru-148/149 - 3.3.10
Ru-150/151 - 3.3.10 PAM

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

What Radiation Monitors cause an auto-actuation?

A

Ru-7 ASCRT Re-aligns AS Condensate Return to LRS (isolates path to main condenser)
Ru-12 WGDT Discharge - Isolates WGDT path (closes UV-34A/34B).
Ru-29/30 - Actuates CREFAS.
Ru-31/145 - Actuates FBEVAS (cross trip CREFAS)
Ru-37/38 - Actuates CPIAS (cross trip CREFAS)

Ru-141 Ch 1 - Ch. 1: Diverts CAR exhaust flow through the post filter blower unit. (Thru Filter) alarms at 1 gpm leak with 1% failed fuel (1440 gpd)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

What monitors are required per the Offsite Dose Calculation Manual?

A
  • Requires the RUs and the flow rate monitors.
    o If flow monitor non-functional, estimate flow rate every 4 hours.
  • RU-12 WGDT release
    o If non-functional, tank can be released if two independent: sample analysis, release rate calcs, and valve line-up
  • RU-143 / 144 Plant Vent Low Range & Mid and High Range Gas
    o Required at ALL times
  • RU-145 / 146 FB Vent Low Range & Mid and High Range Gas
    o Required in Modes 1-4
    o Required if irradiated fuel is in Fuel Building (basically at all times)
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

How would an RCS leak into Nuclear Cooling water be detected? What if EW has been cross connected?

A

Ru-6 alarm for NC
Ru-2/3 if cross-connected to EW

How well did you know this?
1
Not at all
2
3
4
5
Perfectly