Three Whole Prep Flashcards
Criteria For Emergency Repair:
A
O
L
Repairs That If not Repaired Could:
V
O
I
P
°(A)ccident repair needing immediate attent.
°vehicle is place (O)ut of serv. because repair
°repairs needed @ (L)arge scale inc/emerg.
°cause vehicle to (V)iolate the law
°reduce (O)perating efficiently
°cause (I)njury or damage to equip.
°(P)revents response
Roof Division:
Incorporating
L
L
C
C
E
S
S
Lookouts
Location
Communication
Condition
Escape routes
Safety zone
Safety equipment
TIRE CHANGE:
Tire Tread Depth Is At Or Less Than ____”
4/32”
Shops Business Hours?
0600-1530
Business Hours:
Field Repair Supervisor #?
(213) 485-6118
Tire Change:
Document F-__ & F-__
F-2
F-710
Aerial Lube & Cleaning:
Grease for aerial & Chassis is _________
Lube for sliding surfaces of aerial is ___________ ALF & __________ for Pierce
Black Pearl
AMSOIL
SYNCO SUPER LUBE
Aerial Lube & Cleaning:
When complete hoist ladder to ___° then retract to prevent newly applied grease from being scraped off.
60
Aerial Lube & Cleaning: ALF
5th wheel inject grease in line & ___ ° to left & ___° to the right
60° 60°
Aerial Lube & Cleaning PIERCE:
•Position the tractor / trailer in a jackknife condition, ___° degrees to one side
•Reposition the unit approximately 20 degrees from the jackknife position (70 degrees from straight ahead)
•Repeat this procedure every 20 degrees (a total of ___ grease positions) until the unit is in the opposite jackknife
position
90°
10
Aerial Lube & Cleaning Documentation:
F-___
F-___
Inform Reliefs
F-2
F-704
TOW PROCEDURES:
Shall be towed in the following circumstances;
• app. cannot operate ________
• app. cannot operate ________
• repair has been ________ or mobile is _______ to repair
•SAFELY
•LEGALLY
•DENIED
•UNABLE
UNDERCARRIAGE DOCUMENTATION:
F-___
F-___
F-___
F-___
F-2
F-704
F-978A Checklist
F-978B Report
CHANGE OVER:
Apparatus Tracking System - E_________ R________ S_______ formerly known as Critical Incident Application (CIA)
Enterprise Record System
LOBBY OPERATIONS:
4 Fire Protection Features & Activations
1. ___________
2. ___________
3. ___________
4. ___________
- Smoke Detectors
- Heat Detectors
- Manual Pull Stations
- Water Flow
EARTHQUAKE ORDINANCE:
Post 1933 _______________ earthquake
Long Beach
EARTHQUAKE ORDINANCE:
Post 1959 ________________ earthquake
Tehachapi
EARTHQUAKE ORDINANCE:
Post 1971 ________________ earthquake
Sylmar
EPU SPECS:
____ V
____ GPM
____ PSI
12 V
1.5 GPM
2000 PSI
EPU DUTY CYCLE: 00-03
___ % duty cycle
___ seconds every ___ min
Or ___ min continuous operation
7 %
21 seconds every 5 min
3
EPU DUTY CYCLE: 06-09
___ % duty cycle
___ min in every ___ min (___ min on ___ min off)
Or ___ min continuous operation
23 %
2.3 min in every 10 min (2.3 on 7.7 off)
7 min
EPU LIMITS: PIERCE
___ minutes without allowing at least ___ minutes for cooling down.
30
30
EMERGENCY REPAIR BUSINESS HOURS
1) Notify Metro & Battalion
2) Contact Field Repair Sup. [6118]
- if unable to reach provide metro with __________________________
Type
Assignment
Location of App
Nature of repair requested
Metro will contact field repair
EMERGENCY REPAIR AFTER HOUR
1) Notify metro and battalion
2) Batt. will direct change over or staff reserve notify Div (bureau)
3) Div. (Bureau) directs change over or staff res. && directs metro to contact field repair sup.
4) Metro contacts field repair sup.
5) Field repair contacts on call
.