TB 126 - Metro Gold Line Eastside Extension Const. Phase Flashcards
The Metro Gold Line Eastside Extension (MGLEE) is an MTA tunneling project that will extend the existing Gold Line an additional __ miles from Union Station to Atlantic Boulevard
6
MGLEE features include:
• __ miles of Light Rail Service
6
MGLEE features include:
• __ stations (two underground)
8
MGLEE features include:
• _____ tunnels (1.8 miles long) Boyle Avenue to Lorena St.
Twin
MGLEE features include:
• Ride time from Union Station to Atlantic Station - ___ minutes
17
MGLEE features include:
• Operating hours from _____a.m. to ____ a.m.
4: 30
12: 30
The tunnel depth will be ___ feet below grade and it is anticipated that during the tunneling operation pockets of methane gas will be encountered
40
A __” water supply system provides cooling for the TBM and water for firefighting operations
4
This system is equipped with 2-1/2” NST outlets every ____ feet within the tunnel
200
Compromised atmospheres are the greatest risk in tunnel construction; intrinsically safe fans (__________CFM) provide ventilation and evacuate air from the tunnel through a 72- inch vent pipe
100,000
Excavation of earth is accomplished with a Tunnel Boring Machine (TBM), which is approximately ____ feet long and can tunnel up to ____ feet a day
300
100
A shield protects a ___’ area around the front of the TBM as it bores and when enough area has been excavated, hydraulic rams are retracted and a segmented concrete liner is installed. Once installed
20
__ 8-passenger diesel locomotives move the muck cars
2
Each locomotive is ___ feet long, five feet wide, weighs approximately 35 tons and is equipped with an on-board extinguishing system that the operator can activate from three different locations
21
Diesel fuel capacity is ___ gallons and fueling is done on-site.
75