SIMEX 772 Flashcards
RCAM 6
XWC
TAKEOFF
35
LANDING
40
RCAM 5
XWC
TAKEOFF
35
LANDING
40
RCAM 4
XWC
TAKEOFF
27
LANDING
27
RCAM 3/2/1
XWC
RCAM 3
20/20
RCAM 2
20/20
RCAM 1
15/15
ANY LEARNINGS FROM SIMEX 771?
MEL APPLICATION
DOORS CLOSED AND PRIOR TAKEOFF
CREW COMPLETES ECAM THEN REFERS FCOM AND MEL TO DETERMINE IF DISPATCH RELIEF IS AVAIL
IF NOT LISTED TAKEOFF PROHIBITED
MEL CAN ONLY BE APPLIED WHERE NO MAINT M OR MP REQD
MEL CAN ONLY BE APPLIED BEFORE TAKEOFF
MUST COMPLETE PLACARD REQMTS AND ANY O PROC OR M OR O PROC PRIOR TO TAKEOFF
AT MAINT BASE LAME NEEDS TO CHECK PROC FOLLOWED
FLT YSSY YMML
START PT
YSSY INT GATE 10
TECH LOG REVIEWED NO HOLD OR MEL ITEMS
ENTERING FLT DECK
PROC
BATT CHECK
ALL BATT OFF
CHECK AT LEAST 25V
ALL BATT ON
REQ CLR PRIOR TURNING IRS TO OFF THEN NAV
IF REFUELLING ONLY DO 2 WAIT 40 SECS THEN THIRD
SIT DOWN AND GRAB QRH
QRH
PROC
READ AND DO
WORK TOGETHER WHERE NEEDED
CAN USE ELEC LOGBOOK 16/10
3/10/120
AFTER QRH
PF PROC
OVERHEAD PANEL
PF
ALL WHITE LTS OFF
RCDR GND CTL PBSW ON
CAPT CAPT AND PURS SW TO CAPT PURS
PROBE AND WINDOW HT AUTO
ALL IR MODE SEL NAV
ELT ARMED
RESET BUTTON L SIDE CHECK
EXTERIOR LTS SET STROBE AUTO
SIGNS SET
ENG START SEL NORM
AIR COND PANEL CHECK SET
BAT CHECK
TRIM TK FEED SW AUTO
ALL LTS MAINT PANEL OFF
CARGO AIR COND AS REQD
RMP 3 ON SET
CVR TEST PB PRESS
RESET BUTTONS R SIDE CHECK
THEN C INSTRU PANEL
THEN PEDESTAL
AFTER QRH
PM PROC
PM
OXY PRESS IN GREEN NO AMBER HALF FRAME
RAIN RPLNT NORM
ENG OIL QTY MAY NEED ENG FADEC GND PWR
6 QTS PLUS .5 TIMES FLT HRS = 15 QTS
COCKPIT DOOR LT CHK
ANN LT TEST
CHK OPEN AND FAULT LT
AND 3 LTS OVRHD PANEL
ANN LT BRT
COCKPIT DOOR OP CHK
COCKPIT DOOR CORRECT OPS
MECH OVERRIDE CHECK IE DOOR LEVER
WALKAROUND
COMING TOGETHER
PROC
WHEN BOTH CREW MEMBERS SEATED
PF AND PM ARE THE SAME
LOUDPSPEAKER KNOB SET
BARO REF SET
EFIS CP SET
AFS CP PF CHECK PM CROSSCHECK
LATERAL CONSOLE
PF PM SAME
OXY MASK TEST
EFB MOUNT CHECK
PFD CHECK
ND CHECK
CHECKS BEFORE BRIEFING
PF PM
FUEL ON BOARD CHECK
FMS FUEL&LOAD
ECAM FUEL BALANCED
PF
TAKEOFF BRIEFING PERFORM
PF
BEFORE START CL
PM
DOWN TO THE LINE
DEP BRIEF
ENSURE FUEL CHECKS DONE
THEN DEP BRIEF
READ AND DO
BEFORE PUSHBACK START CLEARANCE
PM
HF CHECK
BOTH
FINAL LOAD SHEET CHECK
FOB TRIM TK CHECK
ZFW ZFWCG CHECK REVISE
PAX NUMBER CHECK REVISE
LOADSHEET MACTOW VS ECAM GWCG CROSSCHECK
IF DIFF <1% NO CHANGE
>1% AUTO GND XFR PBSW ON
IF TAKEOFF COND CHANGE
BOTH
OIS FINAL TO PERF DATA RECOMPUTE
PF
FMS TO DATA REVISE
PM
OIS FINAL TO PERF DATA XCHK W AVIONICS
BOTH
SEATING POSN ADJUST
PF
FMS PERF
PM
FMS F PLN
PM
APU CHECK AVAIL
EXT PWR CHECK AVAIL
EXT PWR DISCONNECTION REQUEST
LP GND CARTS CHECK DISCONNECTED
APU BLEED SW ON
PF
BEFORE START CL DOWN TO THE LINE
CONFIRM COMPLETE
PM
DOWN TO THE LINE
CONFIRM COMPLETE