EVO 32 Implementaion of LSR Flashcards
EVO 32
When will Emergency LSR Ops be implemented and how?
When large # of PSS or PH are OOS and replacement is not available. It will be issued by voice alarm,65-2, Dept Radio, and MDT.
EVO 32
What does Emergency LSR Ops entail?
Both 1st + 2nd due bring their LSR to any bldg that are 3 stories or greater in height. This includes fireproof mds. The 2nd due roof will position both his and the 1st due roof’s LSR at potential substantial objects, preferrably different objects for each LSR.
EVO 32
Note - During Emer LSR ops, the LSRs shall not be removed from the bags except for actual rescue operations.
Note
EVO 32
When will the two roof members be allowed to leave their position on the roof during Emerg LSR ops?
When the fire is put as “probably will hold” , or the IC informs membs to evacuate, or IC informs membs their services are no longer needed.
EVO 32
What is the preferred method for removal for distressed members?
To remove themselves via a single slide with an LSR that has been deployed from above.
EVO 32
What are the actions to be taken by a distressed member?
ACRO - MILF M - Mayday I - Identify Unit and Position L- Location for rope deployment F- Fully clear window