Task Item No. 4-4: Analyze Drawings for primary building systems, assemblies, and material configurations. Flashcards

1
Q

Task Item No. 4-4: Analyze drawings for primary building systems, assemblies, and material configurations.

  • Evaluate design team choices of materials, assemblies, and building systems for suitability of choice and ability to perform
  • Review drawings for suitability of materials, systems, and assemblies within the context of the design intent
A

Task Item No. 4-4: Analyze drawings for primary building systems, assemblies, and material configurations.

  • CSPG 12.11 and 12.11.1
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

12.11 Drawings-Specifications Coordination

The drawing may include schematic diagrams, , plans, maximum and minimum , nominal dimensions, critical, modular increments, and component .

A

12.11 Drawings-Specifications Coordination

The drawing may include schematic diagrams, layouts, plans, maximum and minimum Dimensions, nominal dimensions, critical Dimensions, modular increments, and component arrangements.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

12.11.1 Extent of Drawings

Not until final selection of eachhas been made will the A/E begin to developconstruction drawings, integratingitems with each other and with descriptive items.

A

12.11.1 Extent of Drawings

Not until final selection of each system has been made will the A/E begin to develop Definitive construction drawings, integrating performance-specified items with each other and with descriptive items.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly