Task Item No. 4-3: Consult with the project team on appropriateness of systems, assemblies, and materials being considered or implied by the project requirements. Flashcards
Task Item No. 4-3 Consult with the project team on appropriateness of systems, assemblies, and materials being considered or implied by the project requirements.
- Recognize and propose resolution of coordination issues between disciplines, proposed systems, and the construction process
- Evaluate project elements, systems, assemblies, and materials relative to project type and scope
- Evaluate how assemblies and materials are being integrated into project systems to highlight any difficulties or conflicts which may be present
- Integrate proposed assemblies and materials into desired project systems
1.4.2 Product Selection Decisions
Selected products must be coordinated amongmembers. Once products are determined, each type must be investigated for .
A checklist of theto be used for a project may be circulated among the design for use in preparingand.
If errors, conflicts, or missions are detected, comments should be made on the
, in the, or on thefor later correction and coordination.
1.4.2 Product Selection Decisions
Selected products must be coordinated among team members. Once generic products are determined, each type must be investigated for possible sources.
A checklist of the Materials to be used for a project may be circulated among the design for use in preparing Drawings and notations.
If errors, conflicts, or missions are detected, comments should be made on the Drawings, in the Notebook, or on the Worksheets for later correction and coordination.
1.10 Producing a Project Manual
One of the tasks to be performed in preparing a project manual is: Send the proposed conditions of the contract and to the owner andfor review. The need to know the information in these documents in order to properly coordinate their documents without duplication or omission.
1.10 Producing a Project Manual
One of the tasks to be performed in preparing a project manual is: Send the proposed conditions of the contract and Division 01 to the owner and Consultants for review. The consultants need to know the information in these documents in order to properly coordinate their documents without duplication or omission.
1.11 Coordination of the Specifications
Sharing of design and product decisions with project team members must begin of the project, and the should assume the responsibility for coordinating the flow and documentation of project information.
1.11 Coordination of the Specifications
Sharing of design and product decisions with project team members must begin at the earliest phases of the project, and the A/E should assume the responsibility for coordinating the flow and documentation of project information.