Task Item No. 1-10: Coordinate installation procedures with the particular conditions of the project. Flashcards
You Should Understand
Task Item No. 1-10: Coordinate installation procedures with the particular conditions of the project.
- Identify conditions which may influence the specification of a product, material, or assembly, and understand how to incorporate such knowledge into the specifications.
Task Item No. 1-10: Coordinate installation procedures with the particular conditions of the project.
- CSPG 1.4 through 1.4.2
CSPG
1.4.1 Gathering Information
- Understand the work of that affects the proper installation and performance of the product.
- *
1.4.1 Gathering Information
Product representatives should be able to perform the following tasks: (several of which are)…
- Understand the work of other trades that affects the proper installation and performance of the product.
- Explain installation procedures.
- Explain product and system installations
1.4.2 Product Selection Decisions
Installation. Determine whether the manufacturer’s cover the of the project and whether there are alternate methods that must be designated in the specifications. Consider andof installation. Determine what theand requirements are for the product.
1.4.2 Product Selection Decisions
Installation. Determine whether the manufacturer’s directions for installation cover the particular conditions of the project and whether there are alternate methods that must be designated in the specifications. Consider availability of skilled workers and complexity of installation. Determine what the preparatory and finishing requirements are for the product.
2.5.2 The Dual Nature of Representation
Theworks with the owner and design teams to identify products that are suitable for particular project conditions and requirements.
2.5.2 The Dual Nature of Representation
The supplier team works with the owner and design teams to identify products that are suitable for particular project conditions and requirements.
10.5.4.7 Installers
may indicate:…
10.5.4.7 Installers
Installation instructions may indicate:… Required project conditions
10.6.6 Project Conditions
The and themay collaborate to determine the appropriateness of a product for the prevailing project conditions.
10.6.6 Project Conditions
The A/E and the qualified product representative may collaborate to determine the appropriateness of a product for the prevailing project conditions.
13.5.2.4 Preinstallation Meetings
help to clarify installation procedures, phasing, and coordination of the participants and processes involved in the installation of a specific product or system
13.5.2.4 Preinstallation Meetings
Preinstallation meetings help to clarify installation procedures, phasing, and coordination of the participants and processes involved in the installation of a specific product or system