Task Item No. 4-1: Identify Project delivery method and schedule. Flashcards

1
Q

Task Item No. 4-1: Identify Project delivery method and schedule.

  • Identify concerns which may cause difficulty in proposed project deliver and project schedule
  • Evaluate proposed design decisions against proposed project delivery methods and project schedules to inform project team of pros and cons
A

Task Item No. 4-1: Identify Project delivery method and schedule.

  • CSPG 1.14
  • PDPG6.8, 7.1.5 through 7.1.5.3, and 7.2 through 7.7
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q
  1. 14 Document Variations for Design-Negotiate-Build (D-N-B) Project Delivery Method
    * AIA Document G612, Owner’s Instructions to the Architect,* provide three forms for obtaining the appropriate information: Part A for , Part B for and , and Part C forprocedures.
A

1.14 Document Variations for Design-Negotiate-Build (D-N-B) Project Delivery Method

AIA Document G612, Owner’s Instructions to the Architect, provide three forms for obtaining the appropriate information: Part A for contracts, Part B for insurance and bonds, and Part C for bidding procedures.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

1.14.1 Document Variations for Design-Negotiate-Build Project Delivery Method

The negotiations are frequently based on and documents leading to a with a () agreement. The project manual and other construction documents are prepared to finalize the design, obtain required permits, and obtain actual prices for the cost of the work.

A

1.14.1 Document Variations for Design-Negotiate-Build Project Delivery Method

The negotiations are frequently based on outline specifications and design development documents leading to a cost of the work with a guaranteed maximum price (GMP) agreement. The project manual and other construction documents are prepared to finalize the design, obtain required permits, and obtain actual prices for the cost of the work.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

1.14.2 Document Variations for Construction Management Project Delivery

When the construction manager provides assistance during theprocess, negotiates a, and then provides, the construction manager is a .

A

1.14.2 Document Variations for Construction Management Project Delivery

When the construction manager provides assistance during the design process, negotiates a Contract, and then provides Construction, the construction manager is a contractor.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

1.14.3 Document Variations for Design-Build Delivery Method

The design-builder (in D-B) will respond to the , negotiate an , and eventually prepare the consisting of the specifications, drawings and .

A

1.14.3 Document Variations for Design-Build Delivery Method

The design-builder (in D-B) will respond to the RFP, negotiate an Agreement, and eventually prepare the construction documents consisting of the specifications, drawings and subsequent modifications.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

1.14.4 Document Variations for Owner-Build Project Delivery Method

Project manual preparation for owner-build project is similar to that for other project delivery methods. A project may require a single project manual or several project manuals for.

A

1.14.4 Document Variations for Owner-Build Project Delivery Method

Project manual preparation for owner-build project is similar to that for other project delivery methods. A project may require a single project manual or several project manuals for multiple-prime contracts.