RMS Flashcards
What are the RMS Channels?
PILAMHP -248 *** 1 - P Particulate 3 - I Iodine 5 - L Low Range Noble Gas 6 - A Area 7 - M Medium Noble Gas 9 - H High Range Noble Gas 10 - P Process Flow
What does R-5 / VRS-5005(5006) (SFP Area) look for and its high alarm functions?
- LR Noble Gas ***
- Trips AFS Fans (all 4)
- AFX to Charcoal Mode
What does R-17A/B (CCW Pump Disch) and CRS-3301/3401 (4301/4401) (CCW HX Outlet) look for and its high alarm functions?
- Particulate ***
- Closes CRV-412, CCW Surge Tank vent on high alarm or loss of sample flow
What does R-19/24 (Blowdown) look for and its high alarm functions?
- Monitors for secondary side of SGs for SGTR
- Closes BD DCRs
- Closes BD sample DCRs
- Closes DRV-350
- Trips BD treatment pump (R-24 only)
What does RRS-1001 (Liquid Effluent) look for and its high alarm functions?
- Particulate or flow ***
- Closes 12-RRV-285
- MT Pumps Trip
- WECT Pumps Trip
What does VRS-1800(2800) and 1900(2900) (SJAE and GSLO) look for and its high alarm functions?
- Hi alarm means either unit could have a SGTR ***
- SJAE looks at 150# aux steam
- GSLO looks at 50# aux steam
What does VRS-1100(2100) (Upper Cnt, Train A) and ERS-1300(2300) (Lower Cnt, Train A) look at and its high alarm functions?
- Looks at upper/lower ctmnt general area
- Closes VCR-101-107 (inside ctmnt valves)
- Trips CIPS Fan ***
What does VRS-1200(2200) (Upper Cnt, Train B) and ERS-1400(2400) (Lower Cnt, Train B) look at and its high alarm functions?
- Looks at upper/lower ctmnt general area
- Closes VCR-201-207 (outside ctmnt valves)
- Trips
- CIPX Fan
- CPS/CPX Fan
- CPR Fan
What does RRS-1505(2505) (Vent Stack) look for and its high alarm functions?
- LR Noble Gas (1505/2505)
- Closes 12-RRV-306
What does ERS-7401(8401) (CR Area) look for and its high alarm functions?
- Particulate ***
- Starts same Unit CREV
- Closes ACRDA 1/1A
- Part Opens ACRDA-2
- Opens ACRDA-3
If you have an external fail (Loss of Power) to a rad monitor, will you still get an alarm or the auto actions of the rad monitor?
- No Alarms
BUT - High alarm auto actions will still occur
What train is VRS-1100(2100) and ERS-1300(2300) on?
- Train A (Inside Ctmnt)
What train is VRS-1200(2200) and ERS-1400(2400) on?
- Train B (Outside Ctmnt)
Which one of the following is NOT an automatic action that occurs if R-5 (Spent Fuel Pit Area Monitor) alarms?
a. SFP Area Supply Fan AFS-3 trips.
b. SFP Area Exhaust Fan AFX-2 trips.
c. SFP Area Exhaust Charcoal Outlet Dampers opens.
d. SFP Area Exhaust Charcoal Filter Bypass Dampers close.
- b. SFP Area Exhaust Fan AFX-2 trips
While adjusting the setpoint for SG Blowdown Radiation Monitor R-19, a spurious high radiation alarm occured. Which set of responses contain the items automatically tripped/closed for this condition?
1) SGBD treatment pump.
2) SGBD sample isolation valves (DCR-301 to 304).
3) SGBD line isolation valves (DCR-310 to 340).
4) DRV-352 SGBD Treatment Heat Exchanger Outlet Valve.
5) DRV-350 SGBD Flash Tank to Turbine Room Sump Control Valve.
A. 1, 3, 5
B. 2, 3, 4
C. 2, 3, 5
D. 1, 2, 4
- C. 2, 3, 5