How should two sheets of laminate be stored if in contact with each other?

A

Face to Face

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What safety concern is there when handling laminate?

A

Edges are very sharp.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

What tool is used to cut irregular shaped pieces of laminate?

A

Carbide-tipped laminate knife.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Why should MDF not be used as a core material (backing) for laminate?

A

It swells when exposed to moisture.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Why are spacer strips used when positioning contact cement with coated laminate?

A

If the laminate is allowed to touch, the glued core material, it will stick.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Once the laminate is glued down, what tools are used for trimming and finishing the edges?

A

1) Laminate the trimmer with a carbide tipped ball-bearing 2) flat file.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

What are four reasons why laminate may lift along its edges?

A

1) Using insufficient glue, lack of pressure, attempting to bond too soon or allowing contact cement to dry for too long.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

How to store laminate?

A

Stored on edge, lengthwise and face-to-face in vertical binds no wider than 150 mm.

Room temp of about 21 celsius and humidity of 35 to 55 %

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

When cutting laminate, which side should you cut?

A

Cut on the good side, pulling the laminate knife along the straight edge, creating a groove in the surface of the laminate.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

How do you build the core?

A

Core supports laminate and needs to be flat and smooth. It must allow contact cement to bond to it.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

Order of Install for Laminate:

A

1) Side edge pieces
2) Front edge piece
3) Top Edge
4) Backsplash

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

Contact cement is:

A

Rubber-based glue was applied to two surfaces. Allowed to dry until tacky before the two surfaces are positioned together.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

How do you trim laminate?

A

With a laminate trimmer, used to trim the laminate flush to the surface of the core or laminate that it overlaps.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

What is the purpose of a backing sheet?

A

Some core or base materials will be more stable, resistant to warping and changes in humidity.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

What two techniques are used to install a backsplash?

A

Attached to the core and be laminated with the top or they may be laminated separately and attached to the top at installation.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

Several reasons why laminate may lift along its edges.

A

1) Insufficient glue
2) Lack of pressure
3) Attempting to bond too soon
4) Allowing the contact cement to dry for too long

17
Q

When cutting holes in countertops with a jigsaw:

A

1) Use a fine tooth, down cut blades.
2) Protect the countertop by covering the base of the saw with masking tape or tape the surface of the top where the cut will take place
3) Pre-drill holes at all right angle corners
4) Move the saw slowly through the corners to keep the blade vertical
5) Turn the orbital cutting setting on the jig saw, the blade action should be up and down only
6) Seal the edge of the core around sink cut outs with waterproof sealant or glue