F3 - LT#3 - Planning excavations and shoring Flashcards

1
Q

What factors affect the depth of excavations for a building?

A

1) Building design/loading
2) Soil type and bearing strength
3) Climate

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

For big projects, what type of equipment is used to move large amounts of materials?

A

Caterpillar tractors, scrapers & large hoes

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Why should water not be allowed to stand where foundations are to be placed?

A

It destabilizes and weakens the bearing capacity of soil

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

If gravity drainage is not possible, how should rain and groundwater be controlled?

A

Using sump or wells

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

What should be located before you dig?

A

Underground utilities such as gas, electricity and sewer.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

List 5 safety precautions to be used while working around excavation equipment.

A

1) Stay out of the circle
2) Stay well back from the rear
3) Don’t walk under boom

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Why are signs posted near a blast site?

A

So people are aware of the signals and warning procedures.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

What do 12 short whistle signals indicate?

A

Warning preceding a blast

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

How long must a blaster wait before initiating the blast after the signal that warns of an impending blast?

A

Two minutes.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

What is an “All clear” sound signal used during blasting?

A

5 second whistle.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

What is used to prevent the public from falling in an open excavation?

A

Barricades and hoarding.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

How deep can excavations be before a ladder is required?

A

4 feet. (1.2 meters)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

What is the minimum width of walkways at excavations?

A

20 inches

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

How is the width of a strip footing determined?

A

By the type of soil that supports the footing.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

When possible, should you save topsoil?

A

Can be re-used during landscaping

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

What should be done before the excavation process?

A

Locate all services that are in the area of the excavation. Shut off, or isolate hazardous services

17
Q

Where do water services start from?

A

Enter below footings, below frost line, come up through basement floor close to a wall. Equipped with water meter.

18
Q

What pipes are connected to the storm sewer?

A

Perimeter drainage tile and drainage from under the building foundation are connected to the storm sewer. Runoff from the roof is directed to the storm sewer through rainwater leaders.

19
Q

Can you put a gas line under the driveway?

A

Usually, yes you can but it is expensive to rip them up if a leak were to occur.

19
Q

Gas lines must be located, staked, installed and removed by:

A

Certified Gas Fitter

19
Q

How do you avoid gas leaks in a house?

A

The gas line must be outside of the building and topped by a meter.

20
Q

The electrical conduit must be about how far above the roof.

A

1220 MM so that no conductor is closer than 915 mm

21
Q

Electrical conductors must be no closer than:

A

4575 from the ground above vehicle areas and 3660 MM from the ground otherwise

22
Q

Service conductors are usually raised about:

A

5490 MM when accompanied by the telephone lines to avoid contact between them.

23
Q

Service conductors must be raised to:

A

5490 MM when accompanied by a telephone line.

24
Q

Underground electric services will be buried at

A

at least 610 mm deep, and 915 mm deep where it passes under an on-grade slab or driveway

25
Q

The Electrical meter must be installed how?

A

1525 to 1830 mm above finished grade, it is turned to face the exterior of the building

26
Q

How are telephone lines attached to the house?

A

Must be anchored to a mast on the fascia.

27
Q

How deep must the trench be for the telephone line?

A

460 MM deep

28
Q

What is one strategy to deal with water tables building up where foundations will bear?

A

Wells will be drilled and water will be pumped to maintain a low water table.

29
Q

How far must building excavations pile from edge? (NOT TRENCH)

A

4 feet minimum

30
Q

How far must excavation pile from edge of TRENCH?

A

2 feet minimum

31
Q

Who regulates the locations of service conduits?

A

BC Electrical Inspector

32
Q

Who is allowed to conduct blasting on job sites?

A

Only registered blasting contractors.

33
Q
A