TB 035 - Overhaul Procedures Flashcards
Important factor for modifying overhaul procedures is a desire to strike a balance between to objectives:
- Extent to which burned contents and building materials are removed from a structure
- Our need to leave the scene undisturbed (insofar as possible) to aid concerned investigators in conducting any required follow up investigations
What is the primary consideration that should guide officers in determining the scope of the overhaul plan?
Eliminating the potential for rekindle
Main objectives of overhaul are:
-safety of fire personnel conducting overhaul operations by limiting or
removing exposure to hazardous/toxic atmospheres/substances and identifying/flagging
structural and environmental hazards that could potentially cause injuries or death
-ensure the fire is out and all potential for rekindle is eliminated
-leave the scene undisturbed – insofar as possible – for the purpose of aiding investigators
and insurance adjusters in determining the most probable cause and property loss
associated with the fire.
-identify and preserve all salvageable contents/possessions and minimize further damage
to the building and/or materials involved
-ensure the premises are turned over to a responsible party, deemed either safe or unsafe
to reoccupy as determined by authorities, secured as needed to prevent unlawful entry and
unauthorized acts, and checked a final time for rekindle prior to leaving the scene
What are the best lines of defense against any dangerous form of gases, vapors, and particulates?
Time and Shielding
environment directly following a fire incident should be considered immediately dangerous to life and health (IDLH) and treated as a
hazardous environment
What can greatly reduce the levels of exposure to a hazardous environment?
Proper ventilation
What is a main contributor to an IDLH atmosphere?
Carbon Monoxide (CO)
What is not a accurate indication as to whether or not other harmful chemicals are present
Carbon Monoxide (CO)
While ___ assists with improving the environment following a knockdown, ___ has a more significant effect on improving the atmosphere and creating a safer environment
Mechanical Ventilation, Time
Gas meters should be employed to determine what?
Proper level of PPE needed and complete any necessary post-incident personnel exposure reports
What does NFPA 1404-4 state?
SCBAs shall be used in IDLH because no way to predetermine dangerous conditions, concentrations of toxic, materials, or percentages of O2 in air that exist during initial overhaul salvage operations, or under other immediate emergency conditions involving spills or release of chemicals or other toxic materials
What are the two forms of protection from products of combustion?
Respiratory (SCBA) Skin Absorption (Turn-outs)
To provide shielding, PPE turnouts has:
Moisture and vapor barrier
Hood does not hav a vapor barrier but should be worn to:
Minimize exposure from these toxins and vapors
How can additional exposure c=be eliminated or reduced?
Proper maintenance of turnouts
Knockdown is declared, the IC shall:
Cause all activity to cease
Shall establish fire watch with minimum required personnel as IC surveys premises to identify structural and environmental hazards, determine origin and cause and develop incident overhaul plan
Ic or designated representative shall cause all structural and environmental hazards to be clearly identified by what?
Fire-line tape to effectively alert all personnel to known hazards, including roofs, walls, ceiling, and floors
Areas that are completely restricted shall be identified by how?
Both fire line tape, and red and white striped barricade tape
How is the IC responsible for documenting all hazards/risks,and areas involved?
ICS 215A Incident Action Plan Safety Analysis
During overhaul, all officers shall be responsible to orientate their respective erroneous to all identified hazards, regardless of
The area responsibility they may be assigned to work
IC shall designate an officer to coordinate and execute the overhaul plan and to act as
Safety Officer
responsible for monitoring hazardous/restricted areas and correcting any potentially unsafe acts.
IC should order relief companies to replace what?
Initial resources involved in extended, physically demanding firefighting operations.
Overhaul operations may be delayed for a longer period of time when?
Arson Section Investigators are requested to assist
Arson to conduct investigations during daytime hours , night may require the IC to establish an extended fire watch rotation with?
MFC
Complete overhaul description:
-Traditional Method
-Obj of overhaul outlined in Section II
considering factors- time, shielding and spoliation
-IC or officer SHALL determine PPE to wear
Minimal PPE considered when occupancy is well vented for a minimum of what?
One Hour
Gas meters shall be utilized and put in place to monitor the atmosphere levels throughout the …
- Occupancy
- Duration of the overhaul
Wet Overhaul Description:
-No salvageable content exists
-Apply sufficient foam to the contents, areas of involved structure, attention to hard reach areas and points of occupancy where structural members overlap or cross one another
-
Fire Watch:
Companies re-enter structure, full PPE, identify and address possible flare-ups or hot spots while being mindful to preserve scene
The duration of the fire watch and rotation of companies shall be determined by :
IC and coordinated through MFC for specified period of time
Using a TIC during overhaul procedures to ensure
Complete knockdown is accomplished
The TIC allows:
- FF be more effective and make better decisions
- Cannot see through solid surfaces, can only pick up heat transferred to the material surfaces
- Identify hot spots without causing unnecessary damage
Where shall overhaul piles be established?
- Location that will minimize any inconvenience to the public
- Minimum of 10 feet away from any part of a structure
- Identified in planning phase for coordination of companies during overhaul
Salvageable Items:
Contents considered to be salvageable in separate piles so property owner to recover
Non-salvageable items:
Contents non salvageable in separate pile for property owner or insurance properly asses the loss
Combustible materials and other removed contents should be located in
Separate piles and wet down with a hose line using foam to ensure fire is out
Securing the premise or returning the property back to owner is the
Final phase
When returning the occupancy, IC or designated officer shall
Walk through building with owner and provide summary of work performed
When leaving the scene, IC shall ensure property is turned over to
Responsible party or properly secured to prevent unauthorized entry
How many percent is more likely diagnosed with cancer
14%
Roughly how many percent of cancer accounts for line of duty deaths
60%