SOP #44: Building Survey Flashcards
What directly effects safe fireground operations?
Information regarding construction
presence of hazardous materials
dangerous conditions
T or F: Building surveys are fire inspections?
F: They are not fire inspections
Who can perform inspections?
members qualified to enforce the state fire code
Any dangerous or unsafe conditions encountered should be reported immediately to?
Fire Prevention
Conditions found that pose an immediate threat to the safety of members shall be reported to?
Fire Alarm
ex. hoes, weaken structure
According to the Pre-fire assessment chart what is the order of building to be surveyed that were identified as target hazards?
Class I then Class II and so forth from class 1 to 4
What document must be printed out to be used during the building survey?
Data collection form
What file shall be retained in the company files?
Legible hard copy of Data collection form
All information collected on the pre-fire data collection form is to be entered into?
the building module of Aegis Fire records
When performing a building survey members shall?
be in station uniform and one (1) member is to remain with the apparatus at all times
What are the reasons to conduct the building survey?
- Familiarize with property
- evaluate life hazard
- minimize fire dangers from building + contents
What information should be collected in the building survey?
- date of inspection + Officer in command
- Address
- Use
- construction
- life safety
- sprinklers
- alarm systems
- HVAC
- Elevators
- Hazardous materials
- Truss
At a building survey what are of particular concerns to PFD?
Haz. material + quantity
- survey nature
- location
- flammable liquids
- gases + locations of MSDS sheets
If the presence of significant quantities of Haz mat or the presence of EHS (extremely hazardous substance) is to be reported immediately to?
Fire Alarm + Asst. Chief of Operations.
Who is responsible to ensure that the building in their district are surveyed according to guidlines?
Captain
Who and when shall prepare a list of the buildings to be surveyed?
Captain will prepare the list and will be each shift of his company
displayed first (1st of each month)
Companies are required to survey how many buildings per tour?
one (1) and entered into Aegis Building module
Once surveys are completed who and how are they to be submitted?
Captain required to email list for building surveyed the previous week on first (1st) day back.
- sent to fire alarm, district chief and Asst. Chief of Operations
What should be done with any buildings that require to be surveyed (Class 1-4) and are not on the pre-fire assessment chart?
are to be added to the pre-fire assessment chart and survey completed as directed by Captain.
Building information will be updated every?
three (3) years at a min.
- contact info updated when building changes ownership or occupancy
On what days will building surveys be conducted?
Monday - Thursday
How will the building survey list be rotated?
every six (6) months
How many buildings surveys will be conducted per week?
two (2) at a min.