Performance Handbook Flashcards
Who controls load planning ?
Qantas link regional load control
What’s PHL ?
Premium hand luggage
Maximum weight of seat occupied cargo ?
15kg
Standard weight of an assistant dog ?
32kg
Who keeps the manual load statement?
At the departure station
If the paper call back card is completed by the ground staff, crew must ensure that the baggage weight is within how much of the planned load ?
100kg
What’s margin fuel ?
The difference between the fuel required for flight and the fuel onboard the aircraft before departure
What’s the takeoff alternate requirement ?
If the departure port is not suitable for a return to land. Then a takeoff alternate aerodrome must be selected within 1 hour flight time at OEI TAS must meet alternate weather minima requirements
Single engine cruise speed 200/300 ?
197/199 KTAS
Route distance limitations ?
Planned route must not be further than 60mins flying time from an adequate aerodrome at single engine cruise speed in NIL wind
First flight uses what flight planning engine ?
NAVTECH
Load and fuel figures will be sent to downstream systems how long prior to ETD ?
40mins
First flight is used to communicate all fuel requirements to who ?
Regional load centre for weight and balance calculations and operations control for fuel ordering purposes.
Who do we call if we have to change fuel prior to 40mins before ETD ?
MOCO
What’s QFE ?
Barometric pressure at the airport