NC- Nuclear Cooling Flashcards

1
Q

[NC]

Pump capacities
How many are normally in operation?

A

-2 pumps in parallel
-100%
-1/2

100-110 psig (17,500 gal/min)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

[NC]

[NC] Pump power supply?

A

[NB]

‘A’ – NBN-S01 ‘‘B’ – NBN-S02

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

[NC]

What auto starts standby [NC] pump?

A

Pump discharge header pressure
79 psig

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

[NC]

How would the Control Room know if [NC] standby pump auto started?

A

Amber Light (Lit) in CR

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

[NC]

Which side does [PW] flow through on [NC] Hx (Tube or Shell?)

A

Tube Side

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

[NC]

To shift to standby Hx, what actions must be performed?

A

Vent on-coming Hx on both shell and tube side to ensure a filled condition.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

[NC]

How do we manually adjust [NC] temperature?
What temperature band?

A

Temp Up - Open Flow Bypass Valve (bypassing Hx)

Temp Down - Close Flow Bypass Valve (more flow to Hx)

75-105*F

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

[NC]

Which system of the [NC] Hx, is at a higher pressure?

A

[PW]
to prevent potentially contaminated nuclear cooling water leakage into the PW system and environment

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

[NC]

[NC] Surge tank purpose? (4)

A

-Absorb fluxtuations in system due to temperature changes

-NPSH for [NC] pumps

-detecting leakage

-Location for adding makeup water

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

[NC]

Surge Tank location?
Capacity?

A

AB Roof (NE)

1000 gal

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

[NC]

Makeup water to [NC]?
What is it inserted into?

A

[DW] Demineralized Water
Surge Tank

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

[NC]

Backup makeup water source to [NC] ?
Where are the valves to align this back up make up source?

A

[CM] Chemical Waste System

100’ aux building, south wall

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

[NC]

Purpose of nitrogen in the Surge tank?

A

Cover gas -oxygen exclusion for corrosion

5 psig

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

[NC]

How are chemicals added to the system with th Chem Add Tank?

A

D/P with [NC] pump flush

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

[NC]

The NC Chem Add Tank is normally isolated. Besides adding chemicals, when would we align flow through it and why?

A

When Cold Weather Protection is in effect to prevent freeze damage

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

[NC]

What does RU-6 monitor?
Location?

A

[NC] in-leakage from the contaminated systems it cools
Turbine Building North Yard

Next to the [NC] pumps

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
17
Q

[NC]

Letdown Hx TCV purpose?

A

Control [NC] flow thru Hx to auto regulate LDHx outlet temp setpoint by CR

NCN-TV-223 - (usually 120F) - AB 110’ above LDHx

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
18
Q

[NC]

Why, as AO’s, should we worry about the flow of NC through the LDHX? What is the maximum NC flow rate through the letdown HXs?

A

Because it controls Letdown temperature and could ultimately affect reactivity

1500gpm

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
19
Q

[NC] 10

What are the 8 Priority heat loads?

A

Normal Chillers

Nuclear Sample Coolers

CEDM Normal ACUs

[RC] RCP
Seal coolers
HP coolers
Thrust Bearing Coolers
Motor Air coolers
Lube Oil Coolers

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
20
Q

[NC]

What is the purpose of the relief valve NCE-PSV-617?

A

Protect the containment NC return penetration from exceeding its design pressure rating after a LOCA

It protects the system between the inside and outside containment isolation valves

21
Q

[NC]

Why are we worried about overpressure in the penetration piping for the NC system between the inside and outside isolation valves?

A

The water trapped in the penetration piping could be heated by the conditions in the containment and the resulting expansion might rupture the piping and cause a loss of containment isolation

22
Q

[NC]

Why do we not have relief protection on the supply penetration piping for the NC system?

A

Because the inside containment valve is a check valve which would pass flow and therefore not allow any pressure accumulation in the piping

23
Q

[NC]

What is the purpose of relief valves protecting NC inside containment?

A

Protect the NC system piping inside the containment against over pressurization and potential damage in the event of leakage from a RCP seal cooler into the NC system in conjunction with a closure of the NC containment isolation valves

24
Q

[NC]

The setpoint for the NC inside containment relief valves is 135 psig. Why is that significant?

A

Low enough to require a special operating sequence for the NC motor operated containment isolation valves because isolation of the containment return path with the supply path still aligned can cause a pressure surge in the NC system that will lift the reliefs

25
# [NC] What types of valves are on the supply and discharge lines through containment for NC? What would cause the NC supply and return containment isolation valves to automatically shut?
supply line- motor operated outside, check valve inside return line- motor operated valves inside and outside containment CSAS
26
# [NC] What system provides a backup source of cooling water for NC system loads?
EW
27
# [NC] If NC is lost to the RCPs, how long would I have to restore it?
10 minutes 3 minutes if its lost to more than one RCP
28
# [NC] What temperature is NC maintained at and what is preferred?
Between 75F and 105F, but less than 85F is preferred
29
# [NC] The PW T-mod was designed to cool NC when the heat load consists of what components?
One Spent Fuel Pool heat exchanger Two Normal Chillers at 50% load BAC at 40% load LRS Evaporator at 50% load AS Vent Condenser
30
# [NC] What is the purpose of the NC system?
provide cooling during all modes of operation to the priority and non-priority loads intermediate buffer volume between plant cooling water and potentially contaminated flow streams to reduce the probability of releasing radioactivity to the environment.
31
# [NC] Why is the NC constantly monitored by a radiation monitor around the NC pumps?
due to the potential for leakage into the NC system from other radioactive systems
32
# [NC] What protections does the NC surge tank have?
hi-lo level/pressure, level sight glass and controller, local temperature indicator, pressure relief and a vacuum breaker
33
# [NC] What potential impacts on the plant does manually controlling letdown temperature?
too much NC flow, letdown too cool, boron absorbed, positive reactivity too little NC flow, letdown too hot, boron released, negative reactivity
34
# [NC] What are the NC "non-priority loads"?
``` letdown hx radwaste evaporator boric acid concentrator waste gas compressors non-nuclear sample coolers aux. steam vent condenser gas stripper aux. steam rad. monitor (ru-7) cooling coil spent fuel pool cooling hx ```
35
# [NC] What must be done prior to opening the EW-NC cross-tie valves?
close the NC non-priority load isolation valve
36
Where is the NC non-priority load isolation valve located?
77' aux. building unassigned room
37
Where are the EW cross-tie to NC valves located?
70' aux. building, shutdown cooling hx room
38
Are the isolation valves to transfer EW to NC for the fuel pool hx make-before-break?
yes
39
# [NC] In the NC system, what does NH power?
NC pump motor space heaters CEDM ACU and normal chiller NC outlet valves
40
# [NC] In the NC system, what does NK power?
NC surge tank make up solenoid valve
41
# [NC] In the NC system, what does PH power?
NC containment isolation valves
42
# [NC] What is the back up cooling water system for the shutdown cooling HXs?
NC
43
# [NC] What is the back-up make-up system for the NC system?
CM
44
# [NC] Which [NC] Hx is the [PW] T-Mod usually hooked to?
B
45
# [NC] What status does cross-tying the EW to NC loads put the EW equipment in?
INOPERABLE
46
# [NC] What happens when NC is lost to the WC system?
normal chillers trip
47
# [NC] Are the NC supply and return line motor operated valves fail close or as is?
fail as is
48
# [NC] What is the tech spec related to the NC system containment isolation valves?
must be able to close in 60 seconds