Low Pressure Demineralized Water (LDW) System Flashcards
TRA00125
Describe Osmosis.
A biological process where a dilute or lighter solution passes spontaneously through a semi-porous membrane into a more concentrated solution (seeking ion-concentration equilibrium).
Describe Reverse Osmosis
An engineering method of reversing this process where a high mineral salt fluid is placed under pressure, flows through a membrane, and becomes a near mineral free solution.
What is the conductivity and pH of Raw Water?
400 umhos, pH 8.1
What is the conductivity and pH of Demineralized Water?
<1 umhos, pH 5.6
Describe the general process for demineralized water production from raw water.
1) Antiscalant injection
2) Reverse Osmosis
3) Ion exchange beds
4) LDW storage tanks
5) LDW transfer pumps and flush pumps
6) ATR
Describe RO Pre-filters.
5-micron rating filters. Normal dp <10psi. >10 psi indicates need to change filer. >15 psi requires another RO to be placed online. Last approx 3-6 months.
Describe RO Pumps
9-stage HP pumps
350 psi
86 GPM
480V
RO1 is Comm/Diesel
RO2/3 Comm only.
How many IX Polishing Tanks are there?
Six tanks per Bank. We have four banks, so 24 Tanks in total.
What are the designators for LDW Storage Tanks?
TRA-708A, TRA-754
Describe operation of the Demineralizer transfer pumps.
Three-mode control:
HAND (Manual start and run)
OFF
AUTO (Standby selection to start at 86 psig)
500 GPM @ 110PSI
Describe Demineralizer Flush Pumps.
480V Commercial from 608 MCC-2
1000 GPM @ 90 psi
Used to provide high volume of LDW when needed.
Normally OFF with discharge valves SHUT.
What is the supply valve for LDW to ATR?
DW-18 (Just outside of West doors of TRA-608)
Where does LDW enter ATR?
10-inch LDW supply line enters ATR building in the first basement level through the East wall in the switchgear room.
LDW Makeup FCV-8-68 will open when?
Low PCS Surge Tank Level
Loss of IA Pressure
Manually from RCR DCS
What is the normal flowpath for LDW into ATR?
Flows through FCV-8-68 bypass GT-8-9. Provides up to 100 GPM to LDW loads. Bypass flow rate is indicated on FT-8-10B
Also flows through HVW-2 directly before FCV-8-68 to supply:
ATR Battery Rooms
ATR Diesel Jacket Water Header Makeup