Emergency Diesel Generator M-6 Flashcards
TRA00107
What is the purpose of the M-6 Diesel Generator?
Automatically start and supplies emergency power to 670-E-3 Diesel Bus and/or TRA-609 Commercial/Diesel bus upon loss of power.
What defines operability for M-6 Diesel Generator?
674-M-6 diesel generator is considered operable when it:
1. Aligns to automatically start and load within 20 seconds to energize 670-E-3 bus following a loss of diesel OR commercial power (SAR-153)
What are the supply voltages from M-6 to its designated loads?
- 4160V to E-3
- 2400V to TRA-609
What is the backup for M-6 emergency diesel generator?
670-M-43 is normally available for manual start to back up 674-M-6
What is the alternate electrical configuration for 674-M-6?
670-M-43 continuously running and supplying E-3
Auto start dg 674-M-6 standby and available
Commercial power supplied to E-1 and E-2 4160V Buses
What is the normal electrical configuration for M-6?
In normal configuration, comm power supplies all facility loads and the 480V Diesel Bus UPS supplies critical loads and ECP M-10 for 30 minutes on loss of commercial power.
Where are the M-6 emergency diesel control panels E-118/E-119 located?
Located in the 1st basement switchgear room.
What critical loads are powered by 670-E-3 diesel bus?
Supplies power to 200 hp utility cooling water pumps M-5 and M-6
Supplies to 480V diesel bus E-9 through the 480V Diesel UPS
What portions of the M-6 distribution system are safety-related?
The 4160V diesel bus E-3
Portions of the 480V Diesel Bus BBP System
480V diesel bus E-9
480V diesl/comm bus E-15
Auto Transfer Switch E-228
How does 674-M-6 auto-start UV circuitry work?
TRA-609 UV relays for TRA-609 breakers 52-1 and 52-2
Relays sense normal voltage at 623-E-101 A and B for TRA-623 2400V switchgear.
If power is interrupted and drops to 70% or less of nominal voltage, the UV relays in 609 de-energize and M-6 starts.
Will supply power within 20 seconds to TRA-609 commercial bus
Which breaker closes in to power from M-6 on loss of commercial power supply?
609-52-2 breaker closes on auto-start
Describe auto-transfer switch operation on an auto-start of M-6 from loss of commercial power.
- M-6 starts
- Within 20 seconds, reaches rated voltage and frequency
- 0 seconds - ATS-1 (basement of 604) switches to standby bus
- 2 seconds - Standby feeder breaker 2 (TRA-609) closes
- 4 seconds - ATS-3 (TRA-605) switches
- 6 seconds - ATS-4 (TRA-619) switches
Acronym for Utility Area ATS function on auto-start of M-6 from loss of commercial power?
S - Security 604 (0 seconds)
A - Air 609 (2 seconds)
W - Waste 605 (4 seconds)
W - Water 619 (6 seconds)
What are the three fission product barriers per SAR-153?
- Fuel Cladding
- PCS
- Confinement
Which diesels at ATR are directly safety-related?
Only M-6 is safety-related.
What are the possible configurations for M-6/M-43/Commercial power?
- Commercial power feeding, M-6 in standby. (startup and operation)
- M-43 power feeding, M-6 in standby. (alt startup and operation)
Give cooling water capacity for M-6 EDG.
233L
Give lubricating oil capacity for M-6 EDG.
401.3L
What is the operating speed for M-6 EDG?
1800 RPM
What is the power and voltage rating for M-6 EDG?
1500 kW / 4160V
Describe M-6 EDG Support Equipment load alignment.
674-E-1 480V MCC fed from 670-E-15:
1. Radiator fan motor
2. Jacket water heaters
3. Lube oil heater
4. Unit heaters
5. Cooling fans
674-E-3 480V MCC fed from 674-E-2:
1. Day tank FOP
2. Lighting
3. Fire detection
4. Vent fan and damper
5. Intake air louvre damper actuator
6. Alarm feed
7. Fuel oil cooler
Draw M-6 EDG Support electrical distribution one-line
Describe M-6 EDG Exhaust operation.
Dampers open when fans start
674-M-15 (4000 CFM fan) starts at 85F room temp
Describe M-6 EDG supply fan (674-M-13/14) operation.
20000CFM fans
One starts at 90F
Second starts at 95F
Describe operation of M-6 EDG building louvres.
Two intake louvres.
North louvre opens when either 20k CFM fan starts
Both louvres open on a start signal for EDG
Describe M-6 EDG Start Air System
HP air from ATR at 285 psig to 674-M-10 receiver.
M-10 relieves at 300 psig
Plant air can be used if HP air is lost.
Capacity for four 10-second attempts to start
Can start as low as 120 psig
Low pressure alar at 150 psig
What is the function of the M-6 EDG governor?
Mechanical actuator maintains constant engine speed regardless of load.