Experiment Insertion/Removal Flashcards
TRA00052
What is the purpose of the High Point Vents for experiments?
Prevent IPT from lowering to the point of uncovering the test.
Where are the high point vents located?
Actuated using reach rods from the reactor top area.
Describe the covering for high point vents.
Have a plug cover that is considered part of confinement.
What is the power supply for the 40/10 ton crane for experiment handling?
Commercial Power 670-E-10
What is the power supply for the 2-ton crane for experiment handling?
Diesel power 670-E-11
Where is the disconnect for the 2-ton crane?
Northeast corner of the reactor main floor.
What is the power supply for the Cask Console?
Diesel Commercial 670-E-67
What are the prerequisites for experiment removal?
Reactor shutdown
Loop cooled and depressurized
Loop pressure sources isolated by LOTO
Posting on loop primary and secondary cubicles
Posting on subpile room
Preop check of crane and rigging DOP-2.1.17
Radiation monitor setpoints
What are the specific experiment removal loop preparations for 2E or MUCH (1C/D)?
Remove TSP from shield cylinder
Disconnect impulse lines
Remove Missile suppression plug
What are the specific experiment removal loop preparations for PALM?
Remove PALM hydrotest closure plug
Install PALM lifting adapter
Disconnect TCs (alarm in LOCS)
What is the weight of the TSP?
10,400 lb
What is the purpose of the shield cylinder (donut)?
Restricts transient dose when transferring test.
Why do we open crane disconnect prior to raising the experiment on the bayonet?
Prevents radiation exposure due to runaway crane (use chain hoist instead)
What is the purpose of the Removal Sleeve?
Provide a waterfilled connection between the cask and the top head closure plate for removal of the test.
What is the purpose of the top head rotoflex pump?
Removes excess water from the refueling ports and donut area.