J1 - Building Science - LT #4 Flashcards

1
Q

What can be used to tie the footing to the foundation wall & anchor bolts?

A

Rebar & Dowels.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What can be used to provide extra anchorage between the foundation & wall?

A

Strap anchors

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

When rods provide continuous tie from the top of the building to the foundation, what is used to join the sections of rod?

A

Couplers

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

What is a wall-to-floor system strap used for?

A

Tying an upper wall to a lower wall late to the floor system.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

What is a wall-to-floor system strap used for?

A

Tying an upper wall to a lower wall plate to the floor system.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

What is a drag-strut used for?

A

Maintaining continuous horizontal pat for load transfer.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

What is installed at the perimeter of the foundation wall near the top and tied in to restrict the movement of anchor bolts?

A

Continuous later band of steel

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

What can be utilized to assist in anchoring the building to the foundation?

A

Straps embedded in the concrete foundation in addition to anchor bolts.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Seismic hardware is not designed to assist foundation but rather?

A

Use the foundation to anchor and receive loads transferred from above.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Why is toe-nailing the floors to a plate a weak connection?

A

Wood can easily split.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

Hold down -

A

Secured to the concrete foundation with an anchor bolt, then bolted through a series of solid studs at or very near the end of the walls. The number of studs and their nailing requirements are determined by P. Eng

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

At the top of each wall, hold down:

A

Inverted hold-down is bolted through the same stud package as at the bottom and a threaded rod is used to connect it to the next stud package in the wall above.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

How can you help openings hold together while under load?

A

Metal galvanized straps across the headers & onto the trimmer joists at each end.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

When using a mechanical fastener such as a strip on the outside wall, what must be done on the inside of the wall?

A

The fastener should be utilized on the inside of the wall.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

What is a drag strut?

A

Connector for connecting a beam to a truss or to the top of a plate of a collinear bearing wall. Completing the load path allows loads to be transferred out of the roof or floor sheathing into the wall system where the shear walls are.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

Roof system seismic hardware is designed to perform three main functions:

A

Resist rotational loads resulting from lateral force

Anchor the roof system to the wall system

Prevent uplift