B3 - Estimate Job Cost - LT #6 Flashcards

1
Q

Why is cost estimation impotant?

A

Predict overall cost gives an accurate quote

Ordering materials

Keeping waste down

Predict time and project length

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What printed text is considered the bible of construction estimating?

A

Walker’s Building Estimator’s Reference Book

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Why does the “wall type” have to be entered when doing a wall take-off?

A

Wall types may be identified by codes and each one could be made up of different building materials, finishes, fire resistances.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Describe what a database is:

A

The system within a computer that stores the information you need to build your estimate.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Why are labor costs entered in the database as hours per unit rather than dollars per unit for each task to be completed?

A

Cost per hour may change, but the time it takes to complete a task won’t.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Best way to estimate labor costs?

A

Labor time per unit of construction development.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

What does a well put together bid say:

A

The contractor is professional and thorough and cares about the work he/she does.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly