Chemical Waste System Flashcards

1
Q

What 3 subsystems make up the CM system?

A

radioactive chem waste
cooling water waste
condensate polisher regen waste

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Where do the radioactive chem waste subsystem sump pumps discharge to?

A

the LRS Hold up tanks

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Where do the drains in the cooling water HUT get pumped to?

A

the CWNT.

The cooling water HUT is also a backup EW surge tanks and the NC surge tanks in an emergency

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Where are the CWNTs pumped to after the water is neutralized?

A

to the retention basin (or the TDS HUTs)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Where are the CWNTs?

A

north turbine building yard

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Where is the second EW room level switch?

A

on the room wall about 9” off the floor

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

What happens if the radioactive drain system fails?

A

chemistry sampling will not be possible

How well did you know this?
1
Not at all
2
3
4
5
Perfectly