A NEW building under construction that will be built up to 400 feet requires standpipe hydrostatic pressure tests initially when construction reaches

A

75 feet and then additional test when the building reaches
175 feet
275 feet
375 feet

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
1
Q

Who with the proper permit may cut and cap standpipes or sprinklers during demolition

A

Only a licensed Master Plumber or a licensed Fire Suppression Piping contractor

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

If a building is receiving an enlargement triggering a new standpipe system OR an addition to an existing standpipe system it requires a hydrostatic pressure test every ____ feet in height added to the system

A

75 feet

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Do buildings that are going to be demolished or stories removed need a hydrostatic pressure test of the fire suppression systems before the work begins

A

YES

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Standpipe systems that require hydrostatic pressure tests due to new construction or enlargements but are exposed to freezing conditions may have their required hydrostatic pressure test postponed provided that the

A

System undergoes an interim test with AIR OR NITROGEN

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Units finding a demolition or gut rehab is being conducted where the removal of a damaged or inoperable sprinkler system is taken place without the proper variance shall

A

Call DOB for a possible STOP WORK ORDER and request a BC to respond

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Contractors must notify the FDNY before any planned deactivation of a

A

Standpipe Alarm System

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Units finding the hydrostatic pressure testing has not been performed as required for new construction, enlargements, building demolition and removal of stories, or new or altered standpipe/sprinkler systems shall

A

Forward an A-8 to BFP Fire Suppression Unit

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

Existing standpipes in a vacant building being demolished, or temporary and permanent standpipes in a new building under construction that is higher than 75 feet must all have

A

Pressurized alarms that detect breaches in the standpipe systems

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

At construction and demolition sites local law 59 requires site safety managers to conduct _____checks of standpipe connections and a ______tracing examination of standpipes on every floor to verify no breach exists throughout the building

A

Daily

Weekly

How well did you know this?
1
Not at all
2
3
4
5