BISP CH 2 ADD 3 Flashcards
The large “M” in front of the Building Inspection Type column indicates that there are
Additional inspections for this BIN number. Hovering over the “M” will reveal the additional inspections
CDA inspections are a _______ priority than Full Builiding/Risk inspections but a _______ priority than Complaints, and Vacate Surveillance Inspections
Higher
Lower
If an officer wants to perform a CDA inspection on a building that has not yet come up on the schedule, the officer can
Add this CDA inspection manually. However the CDA inspection type that is being added must already exist for the building. If the CDA inspection type is not in the drop down list then this CDA inspection cannot be added to this BIN number