AOP-4 "Uncontrolled PCS Dilution" Flashcards
1
Q
AOP-4 entry conditions
A
Unexpected rise in power range, wide range, and/or source range NI in conjunction with any of the following:
- Unexpected rise of audible count rate - Unexpected VCT level rise - Unexpected lowering of Letdown Temperature as indicated on TIC-0203, Low Pressure Letdown Flow Temp Control
2
Q
AOP-4 automatic actions
A
Reactor trip
3
Q
AOP-4 reactor trip criteria
A
NONE
4
Q
AOP-4 immediate actions
A
NONE