AOP-28 "PZR Pressure Control Malfunctions" Flashcards
1
Q
AOP-28 entry conditions
A
- EK-0753 “Pressurizer Pressure Off Normal HI-LO” (HI - 2110 psia, LO - 1975 psia)
- EK-0754 “Pressurizer Pressure Off Normal HI-LO” (HI - 2110 psia, LO - 1975 psia)
- EK-1373 “SV and/or PORV Open”
- Charging or Letdown malfunctions during solid plant operations
2
Q
AOP-28 automatic actions
A
Possible reactor trip
3
Q
AOP-28 reactor trip criteria
A
Either Spray Valve failed open and PZR pressure not being maintained
4
Q
AOP-28 equipment trip criteria
A
- If CV-1057, Pressurizer Spray Valve failed open, then trip P-50A and P-50B. If Pressurizer pressure not being maintained, then also trip P-50D
- If CV-1059, Pressurizer Spray Valve failed open, then trip P-50C and P-50D. If Pressurizer pressure not being maintained, then also trip P-50A
- If PZR pressure < 235 psia for > 1 minute or < 200 psia for any amount of time, then trip all operating PCPs
5
Q
AOP-28 immediate actions
A
NONE