AOP-28 "PZR Pressure Control Malfunctions" Flashcards

1
Q

AOP-28 entry conditions

A
  • EK-0753 “Pressurizer Pressure Off Normal HI-LO” (HI - 2110 psia, LO - 1975 psia)
  • EK-0754 “Pressurizer Pressure Off Normal HI-LO” (HI - 2110 psia, LO - 1975 psia)
  • EK-1373 “SV and/or PORV Open”
  • Charging or Letdown malfunctions during solid plant operations
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

AOP-28 automatic actions

A

Possible reactor trip

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

AOP-28 reactor trip criteria

A

Either Spray Valve failed open and PZR pressure not being maintained

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

AOP-28 equipment trip criteria

A
  • If CV-1057, Pressurizer Spray Valve failed open, then trip P-50A and P-50B. If Pressurizer pressure not being maintained, then also trip P-50D
  • If CV-1059, Pressurizer Spray Valve failed open, then trip P-50C and P-50D. If Pressurizer pressure not being maintained, then also trip P-50A
  • If PZR pressure < 235 psia for > 1 minute or < 200 psia for any amount of time, then trip all operating PCPs
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

AOP-28 immediate actions

A

NONE

How well did you know this?
1
Not at all
2
3
4
5
Perfectly