AOP-3 "Main Feedwater Transients" Flashcards

1
Q

AOP-3 entry conditions

A
  • EK-0143 “FW Pump P1A Turbine K7A Trip”
  • EK-0149 “FW Pump P1B Turbine K7B Trip”
  • EK-0148 “FW Pump P1A Lo Suction Flow or Lo Disch Press” (2500 gpm or 800 psig)
  • EK-0154 “FW Pump P1B Lo Suction Flow or Lo Disch Press” (2500 gpm or 800 psig)
  • EK-0146 “FW Pump Lo Suction Press Channel Trip” (250 psig)
  • EK-0160 “Fdwtr Pump Lo Suction” (305 psig)
  • EK-0155 “Condensate Pump Trip”
  • EK-0157 “Condensate Pump P2A Discharge Lo Pressure” (390 psig)
  • EK-0163 “Condensate Pump P2B Discharge Lo Pressure” (390 psig)
  • EK-0170 “Heater Drain Pump Trip”
  • EK-0961 “Steam Generator E-50A Hi Level” (84.7%)
  • EK-0962 “Steam Generator E-50A Lo Level” (55%)
  • EK-0963 “Steam Generator E-50B Hi Level” (84.7%)
  • EK-0964 “Steam Generator E-50B Lo Level” (55%)
  • Indications of a Main Feedwater transient in progress
  • Condensate Cleanup System leak
  • Main Feedwater piping rupture
  • Heater Drain Pump malfunction
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

AOP-3 automatic actions

A
  • CV-0608, Moisture Separator Drain Tank T-5 Level Control fully opens (Low Feedwater suction pressure 270 psig)
  • Main Feed Pumps, trips (Low Feedwater Pump suction pressure 250 psig after a 3 second time delay)
  • AFAS initiation (S/G level of 30%)
  • Reactor trip (S/G level of 28%)
  • CV-0701, E-50A Feed Regulating Valve, closes by high level override (84.7%)
  • CV-0703, E-50B Feed Regulating Valve, closes by high level override (84.7%)
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

AOP-3 reactor trip criteria

A
  • Either S/G level lowers to 30%
  • No Main Feed Pump operating
  • EK-0961 “Steam Generator E-50A High Level” is alarming, AND S/G level(s) are less than 60% and lowering
  • EK-0963 “Steam Generator E-50B High Level” is alarming, AND S/G level(s) are less than 60% and lowering
  • Any operating Main Feed Pump trips (> 80% power)
  • CV-0711, Feed Pump P-1A Recirculation Valve fails open (> 80% power)
  • CV-0710, Feed Pump P-1B Recirculation Valve fails open (> 80% power)
  • Either S/G level > 90% AND the high level override has not lowered feedwater flow (>= 15% power)
  • Either S/G level > 95% (>= 15% power)
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

AOP-3 turbine trip criteria

A
  • Either S/G level > 90% AND the high level override has not lowered feedwater flow (< 15% power)
  • Either S/G level > 95% (< 15% power)
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

AOP-3 immediate actions

A
  • Take manual control of the following as necessary ot restore/stabilize S/G levels:
    - Feed Reg Valves
    - Feed Reg Bypass Valves
    - Combined Feed Pump Speed Control
    - Individual Feed Pump Speed Controls

-If either S/G high level alarms are in, then verify S/G levels >= 60% and <= 90%

How well did you know this?
1
Not at all
2
3
4
5
Perfectly