AOP-19 "Loss of Right Train DC Power" Flashcards
1
Q
AOP-19 entry conditions
A
-EK-0542 “Annunciator DC Failure”
AND
-K-7B “Trip Power” light extinguished
AND
-PY-0102B and PY-0102D, TMM channels loss of power
AND
-CV-0501, S/G E-50B MSIV position indication lights extinguished
2
Q
AOP-19 automatic actions
A
NONE
3
Q
AOP-19 reactor trip criteria
A
NONE
4
Q
AOP-19 immediate actions
A
- Verify reactor tripped, if reset (if not, trip the reactor, if reset)
- Verify the turbine tripped (if not, trip the turbine using HS-0510A, Main Steam from S/G A to close, or manually at the front standard)