AOP-24 "S/G Tube Leak" Flashcards

1
Q

AOP-24 entry conditions

A
  • Primary to Secondary leak rate >= 0.003 gpm in Modes 1 and 2, or 0.05 gpm in Modes 3 and 4
  • Adverse trends in any of the following:
    • RIA-0631, Off Gas Rad Monitor
    • RIA-0707, S/G Blowdown Process Monitor
    • RIA-2323, Main Steam Safety and Dump Valve Discharge
    • RIA-2324, Main Steam Safety and Dump Valve Discharge
    • RIA-2325, Particulate Stack Monitor Remote Readout
    • RIA-2326, Normal Range Noble Gas Stack Monitor
    • RIA-2327, High Range Noble Gas Stack Monitor
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

AOP-24 automatic actions

A
  • P-55A, Charging Pump, speed rises
  • P-55B and/or P-55C, Charging Pumps, start (if tube leakage plus letdown flow exceeds the capacity of P-55A)
  • S/G Blowdown Valves close (if RIA-0707, S/G Blowdown Monitor, setpoint is exceeded)
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

AOP-24 reactor trip criteria

A
  • A sustained rise in the CVCS charging rate is needed to maintain PZR level at program level
  • PCS makeup requirements exceed those expected for the rate of power reduction in progress
  • Radiation monitor response exceeds those expected for the rate of power reduction in progress
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

AOP-24 immediate actions

A

NONE

How well did you know this?
1
Not at all
2
3
4
5
Perfectly