AOP-24 "S/G Tube Leak" Flashcards
1
Q
AOP-24 entry conditions
A
- Primary to Secondary leak rate >= 0.003 gpm in Modes 1 and 2, or 0.05 gpm in Modes 3 and 4
- Adverse trends in any of the following:
- RIA-0631, Off Gas Rad Monitor
- RIA-0707, S/G Blowdown Process Monitor
- RIA-2323, Main Steam Safety and Dump Valve Discharge
- RIA-2324, Main Steam Safety and Dump Valve Discharge
- RIA-2325, Particulate Stack Monitor Remote Readout
- RIA-2326, Normal Range Noble Gas Stack Monitor
- RIA-2327, High Range Noble Gas Stack Monitor
2
Q
AOP-24 automatic actions
A
- P-55A, Charging Pump, speed rises
- P-55B and/or P-55C, Charging Pumps, start (if tube leakage plus letdown flow exceeds the capacity of P-55A)
- S/G Blowdown Valves close (if RIA-0707, S/G Blowdown Monitor, setpoint is exceeded)
3
Q
AOP-24 reactor trip criteria
A
- A sustained rise in the CVCS charging rate is needed to maintain PZR level at program level
- PCS makeup requirements exceed those expected for the rate of power reduction in progress
- Radiation monitor response exceeds those expected for the rate of power reduction in progress
4
Q
AOP-24 immediate actions
A
NONE