Tools .. HRN Flashcards
A HRN nozzle should only be set up only when there’s wind driven fire
No can be set up as a precaution if resources available and wind condition exists
HRN weighs
10lbs
Only the units that are assigned a high rise nozzle are trained in its use
All members trained
If you are 4 th due engine t HRFPMD fire and you don’t have a HRN you should stop at the deputy chiefs vehicle and grab it out of back
No officer shall contact dispatcher and ascertain the identity of the engine on scene that has the nozzle
Note on 10-77 HRN is assigned
Report ICP with nozzle and 2 1/2 and standpipe kit and FE TOOLS WITH rabbit p
The IC is only one who can order the HRN put into operation at HRFPMD as an alternate strategy in what situations
- IC has determined that direct interior attack is not possible
- Fire apt is inaccessible To outside streams
- Any situation IC determines HRN would be beneficial
When should the HRN 1 1/8 tip be checked
Weekly at mud and before use
Tip is removable
HRN description
8’ aluminum pipe
68 degree two foot bend
Attached to standard 2 1/2 shutoff permanently attached
1/8 MST
HRN will produce water flows of_____GPM at _____PSI nozzle pressure
200-225
At 50 psi
70 psi on pressure gauge for 3 lengths
80 at 4 lengths
Supplied by. 2 1/2 “ hose
A spotter should be in place to monitor HRN op where should he position himself
Place to clearly observe and monitor the conditions in fire apt before during and after HRN deployment
Note. Ht and binoculars
Provide direction and progress reports to IC and members operating nozzle
Best position to monitor effects of HRN
According to TB TOOLS how many engine companies does it take to put HRN into op
Two engines
Note now says equips with FE tools including rabbit ..
Is it necessary to remove window below to put HRN into op
Most cases not necessary
The supply line to HRN should be attached after nozzle is placed in window
No before
A shut off should be placed in line how far back from HRN
One length back from nozzle
Where should the line be shut off when repositioning the HRN
At shut off one length back not at standpipe outlet
Note bleed lenth by opening nozzle to make moving easier
When repositioned officer will notify IC HRN is in position
IC will give approval before start nozzle again
Repairs to HRN
Company officer phone call to tech services
Tag OOS HRN with rt-2