Ropes 4 PSS Flashcards

0
Q

What is the diameter of the PSS rope

A

7.5 MM kermantle rope

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
1
Q

How long is the PSS rope

A

50 feet

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Intended use of the PSS system

A

Used only by members to remove THEMSELVES from an untenable position above grade to a place of safety
One time use system
After use place OOS

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

When the harness and the PSS are donned properly the gate should

A

Be facing down and way from the body

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

When shall the PSS system be inspected

A

At the start of each tour

Semiannually

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Place PSS oos if

A

Bag or any component of the PSS shows signs of heat exposure ,degradation melting or charring
Any doubt

During semi annually inspection a more through inspection of rope will occur during this inspection if any part of system shows degradation or the anchor hook EXO or carabiner show any deformities oos the PSS
Again any doubt oos

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

During your inspection of the PSS system you should pull 3-6 inches of rope through the EXO to ensure the device functions properly ..after you test the EXO you should pull the rope back through EXO leaving how much rope between EXO and anchor hook?

A

8 inches

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

The inside of the rope bag is dyed black over time the dye may leak onto rope and cause discoloration does this put the rope OOS

A

No it does not because it dies not reduce the load capacity of the rope

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

Who is responsible for establishing controls for Repacking PSS

A

Company commander

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

When PSS placed OOS the Officer must ?

A

1.Replace system by immediate phone call to administrative division
2. Prepare Rt-2 and include :
A.Members name
B.Reference number
C. Assigned unit
Retain copy of rt-2
3. Mark in company and office record journal
4. If PSS contaminated OOD call SOC to P/u
5. OOD complete out of service life safety equipment report (scf-2) fwd to CHIEF OF SAFETY
6. Whenever personnel harness or PSS EXO descender is exchanged the PSS verification system on FDNY intranet must be updated

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

If awaiting PSS and receive a run

A

Member will respond
Member shall to be counted towards the units staffing
Upon arrival the officer will inform IC of units status
Members not equipped with PSS will not enter IDLH

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

Who is responsible of the serviceability of the PSS

A

The member wearing it

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

Company commanders must record

A

The serial number of EXO and name of person issued in ORJ

Maintain PSS verification system on intranet

How well did you know this?
1
Not at all
2
3
4
5
Perfectly