MISSED QUESTIONS Flashcards
A LIST OF ALL CFR CERTIFIED MEMBERS, ALONG WITH THEIR CERTIFICATION EXPIRATION DATE AND THE RE-CERTIFICATION CLASS DATES WHEN SCHEDULED SHALL BE MAINTAINED WHERE?
OFFICE RECORD JOURNAL
more places than this
WHAT INCIDENTS ARE FIRE COMMUNICATIONS NOT ALLOWED TO DISPATCH A CFR UNIT TO?
INTOXICATIONS
WHAT UNITS CARRY DISPOSABLE BODY BAGS?
ALL EMS COMMAND AMBULANCES
CONDITIONS CARS
LSU AND MERV
DEPUTY CHIEFS
IN FLAT ROOFED BROWNSTONE BUILDINGS, WHAT IS THE SIZE OF THE COCKLOFT SPACE?
2 TO 3 FT IN HEIGHT
YOU ARE THE LT FOR THE NIGHT TOUR IN L136, RELOCATED TO CROWN HEIGHTS AND ARE CALLED FIRST DUE FOR A TOP FLOOR FIRE IN A BROWNSTONE BUILDING. UPON ARRIVAL THERE IS NO LIFE HAZARD SHOWING, WHERE SHOULD YOU INSTRUCT YOUR CHAUFFEUR TO POSITION THE AERIAL LADDER?
ROOF OF EXPOSURE
FOR A TOP FLOOR BROWNSTONE FIRE, WHAT IS THE FIRST DUE OVM (AERIAL LADDERS) TOOL ASSIGNMENT?
HALLIGAN
SAW
H.T.
FLASHLIGHT
FOR A TOP FLOOR FIRE IN A BROWNSTONE BUILDING, WHAT IS THE TOOL ASSIGNMENT OF THE 2ND ARRIVING AERIAL LADDERS ROOF MAN?
6FT HALLIGAN HOOK
SAW
H.T.
FLASHLIGHT
A TOWER LADDER ARRIVES FIRST DUE FOR A FIRE ON THE 3RD FLOOR OF A 4 STORY BROWNSTONE, THE BASKET HAS JUST DROPPED THE ROOF MAN OFF AT THE ROOF, UPON COMPLETION OF ROOF SIZE UP WHAT WOULD BE THE NEXT ACTION OF THE OVM INSIDE THE BASKET?
3RD FLOOR (FIRE FLOOR) VENTILATION
PUMP DISCHARGE PRESSURE WHEN SUPPLYING A SPRINKLER SYSTME SHOULD INITIALLY BE?
150 PSI
A LARGE CALIBER STREAM IS ANY FIRE STREAM WITH A FLOW OF HOW MANY GALLONS PER MINUTE OR MORE?
300 GPM
THE AKRON TOWER LADDER BASKET BASED MONITOR IS CAPABLE OF FLOWING HOW MANY GALLONS PER MINUTE?
1200 GPM
A COPY OF THE EMERGENCY ACTION PLAN MUST BE AVAILABLE FOR INSPECTION BY?
NYS PUBLIC EMPLOYEE HEALTH AND SAFETY (PESH)
WHAT IS THE SPECIFIC GRAVITY OF WATER?
1
NEWER TANKER TRUCKS HAVE ALUMINUM SHELLS WHICH REDUCE THE DANGER OF BLEVE DUE TO THE FACT THAT THE TANKS?
MELTING OF THE SHELL
WHERE IS THE BEST PLACE TO ESTABLISH A FOAM ASSEMBLY POINT FOR A FOAM CARRIER OR A FOAM TENDER?
AT AN INTERSECTION
HOW MANY TURNS DOES IT TAKE TO CLOSE A BUCKEYE PIPELINE VALVE?
42 FULL TURNS CLOCKWISE
WHAT ARE THE 3 FACTORS THAT WILL AFFECT THE IMPACT OF THE WIND WHEN DEALING WITH WIND DRIVEN FIRES IN HIGH RISE FIREPROOF BUILDINGS
- SIZE OF THE WINDOW OPENING
- FUEL LOAD INSIDE THE FIRE AREA
- STAGE OF FIRE WHEN THE WINDOW FAILS
WHEN IS THE LIST OF STORM OPERATIONS COORDINATORS UPDATE EACH YEAR? THIS IS IN RESPECT TO HURRICANES AND SEVERE STORMS.
MAY 1ST
ENGINE 8 IS ASSIGNED AS THE LOBBY CONTROL UNIT (E008L). WHAT LOCATIONS SHOULD THE LOBBY CONTROL UNIT LEADER VERIFY THE LOCATION OF?
FORWARD-FORWARD-SAFE FIRE
- FORWARD STAGING AREA
2 FORWARD TRIAGE AREA - FIRE FLOOR
- SEARCH AND EVACUATION POST (SAE)
THE MINIMUM REQUIREMENT FOR A VALID DNR AT A NURSING HOME IS?
PHYSICIAN’S SIGNATURE
WHAT IS THE PARAMOUNT CONCERN WHEN DECIDING IF THE 1ST HOSELINE SHOULD BE ADVANCED DOWN THE INTERIOR STAIRS AT A CELLAR FIREIN A PD?
SAFETY OF MEMBERS/RISK OF INJURIES TO MEMBERS
WHEN IS THE FAST PAK INSPECTED?
BEGINNING OF EACH TOUR
AFTER EACH USE
WHAT IS THE CORRECT TEN CODE FOR A SUBWAY TRAIN FIRE?
10-28 CODE 2
10-28 CODE 1 STRUCTURAL FIRE
(10-28 CODE 2 NON-STRUCTURAL FIRE)
(10-28 CODE 3 NON MEDICAL EMERGENCY)
WHAT IS THE PRIORITY ORDER OF VICTIMS DURING UNDER RIVER RAIL EMERGENCIES?
LOOK UP
IN ADDITION TO THE NORMALLY ASSIGNED LADDER COMPANY TOOLS, THE FAST UNITY SHALL REPORT TO THE ICP WITH?
PLEASE B-FAST
PAK TRACKER BASKET/BACKBOARD FAST PAK SEARCH ROPE TWO-IN-ONE ROPE
++ADDITIONAL H.T.++
WHEN PERFORMING “HOIST A PORTABLE LADDER TO THE ROOF” THE OFFICER AND 4 FF PROCEEDING TO THE ROOF BRING WHAT TOOLS WITH THEM?
FULL
FE TOOLS
UTILITY ROPE
LADDER ROLLER
LIFE BELT
WHAT IS THE BEST EXTINGUISHER USED TO EXTINGUISH A FIRE IN A MAILBOX?
CARBON DIOXIDE EXTINGUISHER
WHAT IS THE DEPARTMENT OF TRANSPORTATIONS CLASSIFICATION OF CHEMICALS ACCORDING TO THEIR MAJOR HAZARDOUS CHARACTERISTICS?
EVERY GOOD LT. S.O.P. REQUIRES COMMUNICATING MEMBERS
- EXPLOSIVES
- GAS (COMPRESSED GAS)
- LIQUIDS (FLAMMABLE LIQUIDS)
- SOLIDS (FLAMMABLE SOLIDS)
- OXIDIZERS
- POISONS
- RADIOACTIVE MATERIAL
- CORROSIVES
- MISCELLANEOUS
THE FDNY UFS CONSISTS OF 9 PRIMARY SECTIONS IDENTIFIED BY A NUMERIC CODE. WHAT ARE THEY?
REMEMBER ALWAYS PULL OUT THE EXISTING FILE CARD FIRST
0 - REPORT FILE 1 - ADMINISTRATION 2 - PERSONNEL 3 - OPERATIONS 4 - TRAINING 5 - EQUIPMENT 6 - FINANCES/FUNDS 7 - CIVILIAN DEFENSE 8 - FIRE PREVENTION
HOW OFTEN DOES THE BEACON SOUND ON A HT AFTER THE EMERGENCY ALERT BUTTON HAS BEEN DEPRESSED?
EVERY 4 SECONDS
HOW OFTEN DOES THE BEACON SOUND ON A HT AFTER THE EMERGENCY ALERT BUTTON HAS BEEN DEPRESSED?
EVERY 4 SECONDS
WHO MAY APPROVE THE ISSUANCE OF A VACATE ORDER?
ONLY A STAFF CHIEF
WHO MAY APPROVE THE ISSUANCE OF A VACATE ORDER?
ONLY A STAFF CHIEF
DURING PHASE 2 “WATER PRESSURE EMERGENCY” UPON COMPLETION OF ASSIGNED PATROL DUTIES, WHAT SHALL OFFICERS FAX TO BATTALIONS?
LOSS
LOW WATER PRESSURES
OPEN HYDRANTS, # OF
SHUT HYDRANTS, # OF
SPRAY CAPS ISSUED, # OF
ANYTIME THE FAST UNIT IS PUT TO WORK AT AN OPERATION FOR OTHER THAN FAST WORK PRIOR TO THE OPERATION BEING UNDER CONTROL THE INCIDENT COMMANDER MUST FORWARD A REPORT TO?
CHIEF OF OPERATIONS
IF THE 0845 HRS TEST OF THE VOICE ALARM SYSTEM IS NOT RECEIVED, WHO SHOULD THE OFFICER NOTIFY?
SUPERVISING FIRE DISPATCHER
HOW MANY SECONDS DO YOU HAVE TO ACKNOWLEDGE AN ALARM ON THE PC/ATS BEFORE THE DISPATCHER WILL PROMPT THE UNIT OVER THE VOICE ALARM
20 SECONDS
HOW MANY MORE TIMES IS CO ATTRACTED TO BLOOD THAN OXYGEN?
210
–DOUBLE CHECK–
WHO IS RESPONSIBLE FOR BRINING THE SAW TO THE ROOF AT A TOP FLOOR FIRE IN A BROWNSTONE BUILDING?
1ST DUE OVM
2ND DUE ROOF
IF 287 IS DESIGNATED THE LOBBY UNIT, WHAT SUFFIX SHOULD THEY SEE ON THE RESPONSE TICKET?
E287L
IF 307 IS DESIGNATED THE SYSTEMS CONTROL UNIT, WHAT SUFFIX SHOULD THEY SEE ON THE RESPONSE TICKET?
E307Y
AT A COLLAPSE, BEFORE ENTERING A VOID, WHAT MUST THREE THINGS BE CHECKED FOR THE ACCUMULATION OF?
FLAMMABLE GASES
OXYGEN
CARBON MONOXIDE
AT A VACANT, WHERE ARE THE PRIMARY MARKINGS MADE ON THE BUILDING?
ALONGSIDE THE FRONT ENTRANCE
IF YOU ARE ASSIGNED THE LOBBY CONTROL UNIT, WHERE MUST YOU MAINTAIN ELEVATORS?
IF POSSIBLE MAINTAIN ONE ELEVATOR IN THE LOBBY AND ONE ELEVATOR AT THE FORWARD STAGING AREA
AT AN UPPER FLOOR FIRE IN A LOFT BUILDING, WHO IS RESPONSIBLE FOR ENSURING THAT THE SPRINKLER SYSTEM HAS BEEN SUPPLIED?
3RD ARRIVING ENGINE
WHAT IS THE PRIMARY METHOD OF REMOVING ANY NON AMBULATORY VICTIMS FROM AN UNDER RIVER RAIL OP?
NOLAN RAIL CART
WHO DO YOU NOTIFY TO GET A REPLACEMENT FAST PAK?
BATTALION
WHICH TWO MEMBERS ARE RESPONSIBLE FOR TAKING THE KO CURTAIN TO THE FLOOR ABOVE FOR FIRES IN HIGH RISE MULTIPLE DWELLINGS?
1ST AND 3RD DUE ROOF
WHAT IS THE “BILL OF LADING” AND WHERE IS IT KEPT?
SHIPPING PAPER FOR TRUCKS
KEPT IN CAB WITHIN REACH OF THE DRIVER
WHAT IS THE “WAYBILL” AND WHERE IS IT KEPT?
SHIPPING PAPERS FOR RAILROAD
CARRIED BY CONDUCTOR IN THE CABOOSE OR ENGINE
WHAT IS THE “AIR BILL” AND WHERE IS IT KEPT?
SHIPPING PAPERS FOR AIRCRAFTS
KEPT BY THE PILOT
WHAT IS THE “AIR BILL” AND WHERE IS IT KEPT?
SHIPPING PAPERS FOR AIRCRAFTS
KEPT BY THE PILOT
WHAT IS THE “CARGO MANIFEST” AND WHERE IS IT KEPT?
SHIPPING PAPERS FOR SHIPS
KEPT BY THE MASTER OR FIRST MATE
WHAT ARE THE HAZARDS TO FIRST RESPONDERS WHILE OPERATING AT A “CHEMICAL SUICIDE” AND WHICH HAZARD IS CONSIDERED THE PRIMARY THREAT/HAZARD?
FIBS
FLAMMABILITY
INHALATION PRIMARY
BLOOD-BORNE PATHOGENS
SKIN ABSORPTION
WHEN WOULD YOU NEED TO FILL OUT MORE THAN ONE CD-19 (ACCIDENT REPORT)?
2-2-3-5
2 APPARATUS
2 CIVILIAN VEHICLES
3 PEDESTRIANS OR BICYCLISTS
5 PEOPLE INJURED
FOR A FIRE ON THE UPPER FLOOR OF A ROWFRAME, IF NECESSARY THE IC CAN ORDER THAT LINE STRETCHED? (4 PLACES)
TO FIRE BUILDING
TO AN EXPOSURE
TO SUPPLY A TOWER LADDER
THROUGH AN EXPOSURE TO THE REAR YARD OF THE FIRE BUILDING
WITHOUT AN ADEQUATE SUPPLY OF AIR, A MEMBER WILL SUFFER BRAIN DAMAGE IN?
4 TO 6 MINS
IN WHAT AMOUNT OF TIME WITHOUT AIR WILL A MEMBER MOVE TOWARDS CLINICAL DEATH?
6 TO 10 MINS
AT TAXPAYERS A 100FT LONG STEEL “I” BEAM HEATED TO 1000 DEGREES F WILL EXPAND HOW MANY INCHES IN LENGTH?
9 AND 1/2 INCHES
IF YOU ARE CALLED TO THE SCENE OF A USPS BIO DETECTION SYSTEM (BDS) ACTIVATION AND IT IS A CONFIRMED BDS ACTIVATION, WHAT TEN CODE SHOULD YOU TRANSMIT?
10-80 CODE 3
IN LOW RISE FIREPROOF MULTIPLE DWELLING WITH TWO ENCLOSED STAIRS, WHO SELECTS THE ATTACK STAIR?
LADDER OFFICER NOTIFIES ENGINE OFFICER AND IC OF THE ATTACK STAIRWAY
WHERE ARE SECTION VALVES LOCATED IN UNDER RIVER RAILS?
SECTION VALVES ARE LOCATED APRX. 600 FT APART
HOW BIG SHOULD THE “V” BE PAINTED AT COLLAPSE EMERGENCIES WHEN A CONFIRMED VICTIM HAS BEEN FOUND?
“V” SHOULD BE PAINTED 2FT IN HEIGHT
UNITS PERFOM AN INITIAL PUBLIC SCHOOL (K-12) FAMILIARIZATION DRILL, DRILL ARE REQUIRED EVERY ____ YRS AFTER THAT.
2 YEARS
++NOT DURING BISP++
WHAT DOES A “V” WITH A HORIZONTAL LINE THROUGH IT MEAN?
VICTIM IS DECEASED
WHAT DOES A “V” WITH A CIRCLE AROUND IT INDICATE?
CONFIRMED VICTIM
WHAT DOES A “V” WITH A VERTICAL LINE THROUGH IT MEAN?
VICTIM HAS BEEN REMOVED
WHEN ARE SHORTS NOT ALLOWED TO BE WORN BY MEMBERS?
PEACCH
PUBLIC ASSEMBLIES EDUCATION DAY AFID COMPLAINTS CFR-D HYDRANT INSPECTION
AT FIRE SCENES, WHERE CAN UNITS FIND THE PORTABLE EFAS POST?
DIVISION VEHICLE
CHARGED WEEKLY AND AFTER EACH USE
ENGINE 08 IS CALLED TO A HIGH RISE FIRE, WHEN THE MEMBERS LOOK AT THE RESPONSE TICKET THEY NOTICE E008P, WHAT DOES THE “P” INDICATE?
HIGH PRESSURE PUMPER
WHAT IS THE CORRECT CIDS DESIGNATION FOR BOWSTRING TRUSSES?
BWSTRG
WHAT IS THE CORRECT CIDS DESIGNATION FOR MAJOR ALTERATION?
MJALT
WHAT IS THE CORRECT CIDS DESIGNATION FOR A REHABILITATED BUILDING?
REHAB
WHAT IS THE CORRECT CIDS DESIGNATION FOR A PRE-INCIDENT GUIDELINE?
PG
WHAT IS THE ANNUAL LIMIT FOR DISCRETIONARY OVERTIME?
525 HOURS
WHAT TEN CODE SHOULD YOU TRANSMIT FOR A CHEMICAL SUICIDE ATTEMPT?
10-80 CODE 1
WHAT UNITS CARRY THE COCKLOFT NOZZLE?
DIVISIONS
SQUADS
HOW MANY GALLONS PER MINUTE DOES THE COCKLOFT NOZZLE DISCHARGE?
125 GPM
WHEN IS THE 10-77 SIGNAL GIVEN AT FIRES IN HIGH RISE FIREPROOF MULTIPLE DWELLINGS?
- FIRE IS VISIBLE FROM THE EXTERIOR ON ARRIVAL
- OTHER FACTORS INDICATE THE NEED FOR THE 10-77 ASSIGNED UNITS I.E. WIND IMPACTED FIRE
FOR A DERAILMENT OF A SUBWAY CAR OR A COLLAPSE OF A PD, WHAT TEN CODE WOULD YOU TRANSMIT?
10-60
WHAT SIZE HOLE SHOULD BE CUT IN THE CEILING IN ORDER FOR THE COCKLOFT NOZZLE TO FIT?
3X3
WHAT SIZE HOLE SHOULD BE CUT IN THE CEILING IN ORDER FOR THE COCKLOFT NOZZLE TO FIT?
3X3
3 ENGINES, 2 LADDERS AND 1 BATTALION CHIEF WHOSE PRIMARY DUTIES ARE THE REMOVAL OF VICTIMS VIA SKEDS, STOKES, ETC AND MAY BE SPECIAL CALLED AS AN ADDITIONAL RESOURCE ON ANY 10-60 IS ALSO KNOWN AS?
VICTIM REMOVAL GROUP
HYDROCARBON BASED PRODUCTS BURN AT ______ THE RATE AS ORDINARY COMBUSTIBLES AND GENERATE ____ TIMES THE SMOKE AS ORDINARY COMBUSTIBLES.
HYDROCARBONS TWICE THE HEAT
HYDROCARBONS 4 TO 10 TIMES THE SMOKE
TRUE/FALSE
IF THERE IS ANY INDICATION OF A DELAY IN PUTTING WATER ON ANY TYPE OF FIRE, ALL MEMBERS OPERATING ON THE FLOOR ABOVE SHOULD SEEK REFUGE BY RETURNING TO THE FIRE FLOOR OR FLOOR BELOW.
FALSE (FIRE NEEDS TO BE AN UNCONTROLLED FIRE)
IF THERE IS ANY INDICATION OF A DELAY IN PUTTING WATER ON ANY TYPE OF UNCONTROLLED FIRE, ALL MEMBERS OPERATING ON THE FLOOR ABOVE SHOULD SEEK REFUGE BY RETURNING TO THE FIRE FLOOR OR FLOOR BELOW.
AT WIND IMPACTED FIRES, AFTER AN ALTERNATIVE STRATEGY IS COMFIRMED TO BE SUCCESSFULLY IMPLEMENTED, WHO CAN THE LADDER COMPANY OFFICER WISHING TO ENTER THE PUBLIC HALL OBTAIN PERMISSION FROM TO DO SO?
IC
OPERATIONS SECTION CHIEF
FIRE SECTOR SUPERVISOR
WHO MAY ORDER THE USE OF THE 3RD STAGE IN HIGH PRESSURE PUMPING?
IC
++MUST BE A BATTALION CHIEF OR HIGHER++
WHAT IS THE PREFERRED CHOICE FOR PUMPING OPERATIONS REQUIRING DISCHARGE PRESSURES OF 500 PSI?
3RD STAGE ENGINES
PRESSURES EXCEEDING _____ PSI WILL REQUIRE A 3RD STAGE ENGINE.
600 PSI
IN REGARDS TO SEARCH, FIRES INVOLVING MODERN SYNTHETIC CONTENTS COUPLE WITH NEW BUILDING CONSTRUCTION THAT CONTAIN HEAT AND SMOKE WITHIN THE FIRE AREA MAY QUICKLY BECOME VENTILATION LIMITED FIRES. IF A DOOR IS LEFT OPEN, THIS VENTILATION LIMITED AREA WILL REACT RAPIDLY CAUSING CONDITIONS TO BECOME UNTENABLE IN AS LITTLE AS ____ AFTER ENTRY (VENTILATION) HAS BEEN MADE INTO THE FIRE APT OR AREA.
90 SECONDS
1 1/2 MINUTES
A LARGE SCALE MAJOR EMERGENCY SUCH AS A COLLAPSE OF A 6 STORY MULTIPLE DWELLING OR A PLANE CRASH OUTSIDE OF JFK OR LAGUARDIA WOULD REQUIRE WHAT CODE?
10-60 CODE 2
MEMBERS OPERATING A COCKLOFT NOZZLE SHOULD ALTERNATE THE DIRECTION OF THE STREAM BY ROTATING THE NOZZLE ______ DEGREES.
90 DEGREES
++DO NOT ROTATE COUNTERCLOCKWISE AS THIS MAY CAUSE THE NOZZLE TO BECOME UNSCREWED FROM THE SHUT OFF++
WHAT INSTANCES REQUIRE AN IMMEDIATE NOTIFICATION TO BITS?
ABCD
A - ARREST/ALCOHOL ON DUTY
B - BRAWLING AMONG MEMBERS
C - CONFRONTATION BETWEEN MEMBERS & COPS/CONFRONTATION WITH CIVILIANS
D - DRUGS/DEPT VEHICLES DANGEROUS MISUSE
WHICH COMPANIES ACCOUNT FOR THE ELEVATORS AT LOW RISE FIREPROOF M.D.?
RESCUE AND SQUADS
WHAT IS THE CORRECT ORDER OF REMOVING ICE FROM THE AERIAL LADDER?
RUDY LOVED TOMMY BOY
R - RUNG
L - LOCKS (LADDER RUNG LOCKS)
T - TRUSS
B - BEAMS (MAIN BEAMS)
A REARMOUNT AERIAL LADDER BEING USED AS A WATER TOWER SHOULD BE PLACED ______ FEET FROM THE BUILDING WITH THE TURNTABLE CENTERED FOR MAXIMUM COVERAGE.
25-30 FT
WHEN SHOULD THE STAIRS BE USED AT FIRES IN HIGH RISE MULTIPLE DWELLINGS?
7TH FLOOR OR BELOW
AT HIGH RISE MULTIPLE DWELLING FIRES, WHO ENSURES THAT ALL THE ELEVATORS ARE RECALLED AND SEARCHED?
2ND DUE TRUCK
AT HIGH RISE MULTIPLE DWELLING FIRES, WHAT IS THE CORRECT POSITIONING OF TWO ELEVATORS?
ONE ELEVATOR ON STANDBY IN THE LOBBY AND ONE ELEVATOR TWO FLOORS BELOW THE FIRE
WHAT IS THE SIZE OF AN H TYPE COCKLOFT?
H TYPE COCKLOFT CAN BE AS DEEP AS 4FT
WHAT IS THE SIZE OF A TAXPAYER COCKLOFT?
TAXPAYER COCKLOFT CAN VARY IN HEIGHT FROM 4 INCHES TO MORE THAN 6 FEET
WHAT IS THE SIZE OF A BROWNSTONE COCKLOFT?
BROWNSTONE COCKLOFT IS 2 - 3 FEET
WHAT IS THE SIZE OF A ROWFRAME COCKLOFT?
ROWFRAME COCKLOFT MAY VARY IN HEIGHT FROM ONE FOOT TO TALL ENOUGH FOR A MAN TO STAND IN
FOR THE RAPID RESPONSE VEHICLES (RRV), WHAT IS THE PRIMARY METHOD OF COMMUNICATIONS BETWEEN SECTOR/GROUP SUPERVISORS AND TASK FORCE LEADERS?
- DARS - DEPARTMENT ADMINISTRATIVE RADIO SYSTEM
- 800 MHZ
- CELL PHONE
- DEPARTMENT RADIO (CAN BE UTILIZED IF OTHER SYSTEMS ARE NOT OPERABLE OR IN AN EMERGENCY)
WHEN ARE PROBY NOTEBOOKS FORWARDED FOR EVALUATION?
17TH MONTH
HOW LONG ARE PROBIES REQUIRED TO CONTINUE THEIR READING SCHEDULE?
3 YEARS
ACCORDING TO THE FDNY SOCIAL MEDIA POLICY, IF A MEMBER WANTS TO CREAT A WEB OR MEDIA SITE AND THE SITE CREATES THE APPEARANCE OF BEING AFFILIATED WITH OR SPONSORED BY THE FDNY, THIS MEMBER NEEDS TO GET AUTHORIZATION FROM?
FIRE COMMISSIONER
OFFICE OF PUBLIC INFORMATION
WHEN CHAINS ARE USED ON FDNY APPARATUS, APPROXIMATELY HOW MUCH LONGER ARE YOUR VEHICLES STARTING AND STOPPING TRACKING ON SNOW AND ICE?
DOUBLE
A BROWN COLORED BAND ON A FOAM CAN INDICATES?
FLUOROPROTEIN FOAM
A BLACK COLORED BAND ON A FOAM CAN INDICATES?
AFFF FOAM
A YELLOW COLORED BAND ON A FOAM CAN INDICATES?
HI EXPANSION FOAM
A GREEN COLORED BAND ON A FOAM CAN INDICATES?
ALCOHOL
A SPILL OVER ______ SQ FEET REQUIRING FOAM IS TO BE CONSIDERED A LARGE OPERATION.
2000 SQ FEET
UNITS RESPOND TO A FIRE ON THE 5TH FLOOR OF A 30 STORY HRFPMD, WHO IS RESPONSIBLE TO SEARCH AND RECALL ALL ELEVATORS?
2ND DUE TRUCK
WHERE SHOULD YOU INSTRUCT CIVILIANS TO WALK WHEN EVACUATING AN UNDERGROUND RIVER RAIL TUBE?
AREA OUTSIDE OF THE RUNNING RAILS
WHAT ARE THE COLORS OF SMOKE TO WARN OF POTENTIAL BACKDRAFT?
DENSE BLACK
DIRTY BROWN
YELLOW BROWN
GRAY YELLOW
HOW MANY ROLLS MUST A UNIT MAINTAIN OF MDT PAPER AT ALL TIMES?
3 ROLLS
BUILDINGS SEPARATED BY ________ FEET SHOULD NOT BE IDENTIFIED AS EXPOSURES UNLESS ________.
MORE THAN 30 FT
THE VOLUME OF FIRE OR COMPLEXITY OF INCIDENT CAUSES AN EXPOSURE PROBLEM
WOODEN BOWSTRING TRUSSES SUPPORT ______ % OF THE LOAD THEY WERE ORIGINALLY DESIGNED TO HOLD.
40%
10-25
MANHOLE
10-25 CODE 1 -
10-25 CODE 2 -
10-25 CODE 3 -
10-25 CODE 4 -
BRENDAN BURKMAN’S SO TOUGH
10-25 CODE 1 - MANHOLE FIRE INTO BUILDING
10-25 CODE 2 - MANHOLE BLOWN COVERS/UNDER PRESSURE
1025 CODE 3 - SMOKE SEEPING
10-25 CODE 4 - TRANSFORMER
YOU ARE CALLED TO A CFR-D RUN ON THE CORNER OF ELMHURST AVENUE AND QUEENS BLVD FOR AN UNCONSCIOUS MALE, UPON ARRIVAL NO PATIENT CONTACT CAN BE MADE AND YOUR COMPANY HAS SEARCHED THE AREA FOR THE PATIENT. IN ORDER WHAT ARE THE CORRECT ACTIONS FOR YOU TO TAKE AS THE OFFICER?
- REVIEW THE RESPONSE TICKET FOR ADDITIONAL INFORMATION
- CONTACT DISPATCHER
- CONTACT NEIGBORS/SUPER/SECURITY
- 10-92
- COMPANY JOURNAL ENTRY
WHAT IS THE IDEAL HORIZONTAL DISTANCE FOR A TOWER LADDER TO ITS OBJECTIVE?
32 FEET
HOW FAR CAN A TOWER LADDER BASKET REACH BELOW GRADE?
10 FT BELOW GRADE
IN REGARDS TO BOWSTRING TRUSSES, WHEN & WHERE CAN A COMPANY CUT A HOLE IN THE ROOF?
TRIANGULAR CUT IN THE SLOPING HIP SECTION IN THE FRONT AND/OR REAR FROM THE SAFETY OF A TOWER LADDER BUCKET
HOW MANY TURNS DOES A YELLOW HYRDANT FOUND ON EXPRESSWAYS AND PARKWAYS REQUIRE TO OPEN?
18 FULL TURNS CLOCKWISE
UNITS RESPOND TO A BUILDING FIRE ON THE 101ST FLOOR, YOU WOULD KNOW ACCORDING TO THE NEW FDNY STANDPIPE PRESSURE CHART, YOU NEED TO SUPPLY THE BUILDING WITH _____ PSI, THUS A _____ PUMPER IS NEEDED.
650 PSI (101ST FLOOR STARTS 650 PSI)
3RD STAGE PUMPER (PRESSURES OVER 600 PSI REQUIRE 3RD STAGE)
A 1075 PLACARD ON A VEHICLE INDICATES?
PROPANE
A 1971 PLACARD ON A VEHICLE INDICATES?
COMPRESSED NATURAL GAS
WHAT IS THE GREATEST HAZARD TO CIVILIANS AND FIREFIGHTERS IN REGARDS TO TRANSFORMER VAULTS?
ELECTRICITY
EACH PPE
E - ELECTRICITY A - ASBESTOS C - CO H - HIGH VAPOR PRESSURES P - PCB'S P - PVC E - EXPLOSIONS
While operating at a fire in a rowframe building, the LCC and/or OV FF will normally wait for the Roof FF to perform a roof size-up prior to moving the aerial ladder in all but which one of the following situations?
AERIAL LADDER AT A 4 WINDOW (OLT) FRONT ROWFRAME
WHAT TOOLS MUST THE RECEIVING FF BRING TO THE FLOOR BELOW WHEN DEPLOYING THE KO CURTAIN?
H-H-H
HYDRA RAM
HALIGAN HOOK
HALIGAN
WHAT TOOLS MUST THE DEPLOYING FF BRING TO THE FLOOR ABOVE WHEN DEPLOYING THE KO CURTAIN?
KO CURTAIN
HYRDA RAM
HALIGAN
WHEN IS THE AIRBAG CYLINER REPLACED?
WHEN FALLS BELOW 200 PSI (199 PSI AND BELOW)
WHEN IS THE AIRBAG CYLINER REPLACED?
WHEN FALLS BELOW 200 PSI (199 PSI AND BELOW)
A vacated premises is eligible for administrative dismissal when a vacate order remains open for more than ___ and no violation occurred during that period
2 YEARS
TRUE/FALSE
THE 1ST ARRIVING LADDER IS ALWAYS RESPONSIBLE FOR THE PRIMARY SEARCH ON THE FIRE FLOOR OR FIRE AREA AND THE 2ND ARRIVING LADDER IS ALWAYS RESPONSIBLE FOR THE PRIMARY SEARCH ON THE FLOORS ABOVE.
FALSE
WHEN INITIATING THE ATTACK PLAN FOR A VACANT OR OCCUPIED BUILDING, WHAT IS THE PRIORITY ORDER OF FIREFIGHTING?
LECE
L - LIFE
E - EXPOSURES
C- CONFINEMENT
E - EXTINGUISHMENT
YOU MUST LEAVE THE AREA IMMEDIATELY UPON FEELING ANY PAIN OR DISCOMFORT THROUGH THE HOOD, UNLESS _________________.
UNLESS THE AREA CAN BE IMMEDIATELY COOLED BY A HOSE LINE.
UNDER RIVER TUBE OPERATIONS HAVE 3 MAIN ELEMENTS: RECONNAISSANCE, PLANNING AND LOGISTICS. WHICH UNITS WOULD BE A LOGICAL CHOICE FOR RECON?
RESCUE OR SQUAD
HOW FAR ABOVE STREET LEVEL CAN A TOWER LADDER BASKET BE POSITIONED?
1 TP 2 FT ABOVE THE STREET
BODY HEAT LOSS OCCURS ____X FASTER IN COLD WATER THAN IN AIR.
25X
WHAT ARE THE SAFETY DISTANCES IN REGARDS TO AIRBAGS?
5-10-20 RULE
5 INCHES FROM THE SIDE AIRBAGS
10 INCHES FROM THE DRIVER AIRBAGS
20 INCHES FROM THE PASSENGER AIRBAGS
WHAT ARE THE SINGLE ACTION KEYS ON THE MOBILE DATA TERMINAL (MDT)
10-4
10-14 (MAY CHANGE)
10-20
10-84
WHEN ARE THE 3 INSTANCES A FD VEHICLE MAY PASS A SCHOOL BUS?
- BUS RESUMES MOTION
- BUS DRIVER SIGNALS YOU TO PROCEED
- POLICE OFFICER SIGNALS YOU TO PROCEED
DESCRIBE A 10-36?
10-36 MOTOR VEHICLE ACCIDENT
WAIT
10-36 CODE 1 - WASHDOWN
10-36 CODE 2 - ACCIDENT
10-36 CODE 3 - INJURIES
10-36 CODE 4 - TOOL/EXTRICATION WITH OR WITHOUT INJURIES
WHAT IS THE SQUARE FOOTAGE OF A TOWER LADDER BUCKET?
15 SQUARE FEET
10-45 HAS COLOR TAGS ASSOCIATED TO EACH CODE, WHAT ARE THEY?
10-45 CODE 1 - BLACK (DECEASED)
10-45 CODE 2 - RED/ORANGE (LIFE THREATENING)
10-45 CODE 3 - YELLOW (NON-LIFE THREATENING)
10-45 CODE 4 - GREEN (AMBULATORY)
SQUARE COLUMNS ARE FOUND ON ______ FLOORS OF MILL LOFTS AND ARE ________ % STRONGER THAN ROUND COLUMNS.
LOWER FLOORS
20 % STRONGER
WHEN ARE SERIOUS BRUSH FIRE CONDITIONS PRESENT?
LOW HUMIDITY
WINDS IN EXCESS OF 15 MPH
LITTLE OR NO RAINFALL FOR THE PRECEDING 3 OR MORE DAYS
A RED FLAG ALERT FROM TEH NATIONAL WEATHER SERVICE
FOR A STORE FIRE ON THE 1ST FLOOR OF AN OLT, WHERE ARE THE FIRST TWO LINES STRETCHED?
1ST LINE (2 1/2”) WAS STRETCHED INTO THE STORE
2ND LINE WAS STRETCHED TO THE 1ST FLOOR ENTRANCE HALLWAY, IF NOT NEEDED PROCEEDS TO THE FLOOR ABOVE
IF A CONCRETE BUILDING IS BEING CONSTRUCTED, FLOORS ARE BEING POURED, WHERE MUST THE STANDPIPE BE CAPPED?
CONCRETE BUILDING CONSTRUCTION STANDPIPE MUST BE MAINTAINED UP TO AND CAPPED 1 FLOOR BELOW THE STRIPPING FLOOR
IF A STEEL BUILDING IS BEING CONSTRUCTED, WHERE MUST THE STANDPIPE BE CAPPED?
STEEL CONSTRUCTION STANDPIPE MUST BE MAINTAINED AND CAPPED ON THE FLOOR BELOW THE WALKING FLOOR (Q-DECKING)
AIRTRAINS ARE COMPRISED OF _____ TO _____ CARS AND EACH CAR CAN CARRY UP TO ______ PASSENGERS.
1 TO 4 CARS
EACH CAR CAN CARRY UP TO 200 PASSENGERS
AIRTRAINS ARE COMPRISED OF _____ TO _____ CARS AND EACH CAR CAN CARRY UP TO ______ PASSENGERS.
1 TO 4 CARS
EACH CAR CAN CARRY UP TO 200 PASSENGERS
AIRTRAINS NORMALLY TRAVEL AT ____ TO _____ INTERVALS DURING PEAK HOURS.
2 TO 4 MINUTE INTERVALS DURING PEAK HOURS
AIRTRAINS CAN REACH UP TO _____ MPH.
70 MPH.
HOW MANY AIRTRAINS CAN BE IN OPERATION, AT ANY GIVEIN TIME, THROUGHOUT THE 3 BRANCHES OF THE AIRTRAIN SYSTEM?
AS MANY AS 16 AIRTRAINS
WHAT COMPANYS MUST ANNOUNCE THEIR ARRIVAL OVER THE HANDIE-TALKIE?
THE ARRIVAL OF THE 2ND ENGINE MUST BE ANNOUNCED OVER THE HANDIE-TALKIE
INCIDENT COMMANDER SHALL ANNOUCE THE FAST UNITS ARRIVAL OVER THE HANDIE-TALKIE AT THE SCENE
THE OFFICER OF THE FAST UNIT SHALL ANNOUNCE THEIR ARRIVAL ON SCENE OVER THE HANDIE-TALKIE AND REPORT TO ICP UNLESS OTHERWISE DIRECTED BY THE IC (UPDATED RESPONSE TICKET)
WHENEVER NYC TRANSIT DETERMINES THAT A POWER REMOVAL BOX OR TELEPHONE IS O.O.S, THEY WILL COVER IT WITH A BAG, WHAT COLOR IS THE BAG AND WHAT IS WRITTEN ON IT?
WHITE BAG WITH RED LETTERING STATING “OUT OF SERVICE”
WHEN CAN UNITS USE THE METROCARDS THAT HAVE BEEN ISSUED TO THEM?
WHEN ACCESS TO THE SUBWAY SYSTEM IS NEEDED AND THE SUBWAY STATION IS EITHER UNATTENDED OR THE TOKEN BOOTH CLERK IS UNABLE TOASSIST THE UNIT IN A TIMELY FASHION
USED FOR ACCESS TO THE SUBWAY SYSTEM DURING FIRES AND EMERGENCIES AND NOT FOR PERSONAL USE
STEAM PRESSURES IN GENERATING PLANTS CAN BE AS HIGH AS ____ PSI WITH TEMPERATURES REACHING _____ DEGREES F.
2,000 PSI
900 DEGREES F
STEAM PRESSURES IN THE BURIED SUPPLY PIPING AND IN THE SUPPLIED BUILDINGS CAN BE AS HIGH AS _____ PSI AND TEMPERATURES AS HIGH AS _____ DEGREES F.
170 PSI
350 DEGREES F
WHEN HEAVY RAIN OR A LEAKING WATER MAIN RESULTS IN WATER CONTACTING A STEAM PIPLE, IT CAN COOL THE STEAM INSIDE THE PIPE, CAUSING THE STEAM TO CONDENSE INTO WATER. NORMALLY THIS WATTER IS DRAINED OFF BY A SERIES OF TRAPS. HOWEVER, IF NOT DRAINED OFF, A WATER SLUG WILL FORM WHICH CAN BE PUSHED THROUGH THE PIPING BY THE STEAM AT SPEEDS AS HIGH AS ______ MPH.
200 MPH
TRUE/FALSE
AT A HIGH ENERGY LINE BREAK IN A GENERATING PLANT MEMBERS ARE PERMITTED TO ENTER THE GENERATING PLANT TO ADDRESS A LIFE HAZARD.
FALSE
NEVER ENTER A CON EDISON GENERATING PLANT WITHOUT CON ED PERSONNEL. INSTEAD RESPOND TO THE DESIGNATED MUSTERING SITE OUTSIDE THE PLANT.
WHAT IS THE SHELF LIFE OF PROTEIN BASED FOAMS (FLUOROPROTEIN AND ALCOHOL RESISTANT FLUOROPROTEIN FOAMS)?
10 YEARS
WHAT IS THE SHELF LIFE OF PROTEIN BASED FOAMS (FLUOROPROTEIN AND ALCOHOL RESISTANT FLUOROPROTEIN FOAMS)?
10 YEARS
WHAT IS THE SHELF LIFE OF SYNTHETIC BASED FOAMS (AFFF AND HI-EX FOAMS)?
20 YEARS
WHEN A FOAM HAS REACHED ITS 10/20 YEAR SHELF LIFE, WHAT SHOULD BE DONE WITH THE FOAM?
USED FOR DRILL PURPOSES
WHAT DOES ALL FOAM DEPOTS MAINTAIN INVENTORY OF?
FIFTY 5 GALLON CANS OF:
FLUOROPROTEIN FOAM
ALCOHOL RESISTANT FOAM
HI-EX FOAM
WHERE SHALL FIELD UNITS REQUIRING ADDITIONAL CANS OF FLUOROPROTEIN FOAM, ALCOHOL RESISTANT FOAM AND HIGH EX FOAM GET REPLENISHED?
NEAREST FOAM DEPOT
A PROBY WALKS INTO YOUR OFFICE AND INFORMS YOU THAT THE UNIT NEEDS MORE AFFF FOAM CONCENTRATE, AS A HEADS UP OFFICER YOU KNOW THAT YOU HAVE TO REQUISITION IT FROM?
TECHNICAL SERVICES
WHAT IS THE CORRECT PRESSURE AT THE EDUCTOR WHEN SUPPLYING A HI-EX FORAM OPERATION?
200 - 22- PSI
WHAT IS THE CORRECT PRESSURE AT THE EDUCTOR DURING FOAM OPERATIONS OTHER THAN HI-EX FOAM?
200 PSI
A PROBY WALKS INTO YOUR OFFICE AND INFORMS YOU THAT THE UNIT NEEDS MORE AFFF FOAM CONCENTRATE, AS A HEADS UP OFFICER YOU KNOW THAT YOU HAVE TO REQUISITION IT FROM?
TECHNICAL SERVICES
IN REGARDS TO THE COMPANY JOURNAL, WHAT COLOR INK DOES THE HOUSEWATCHMAN USE?
BLUE OR BLACK INK
ALL OTHER MEMBERS BESIDES THE HOUSEWATCH MAN SHALL USE WHAT COLOR IN?
RED
WHERE IS THE “CHIEF’S VISIT” SECTION IN THE COMPANY JOUIRNAL AT HOUSE WATCH LOCATED?
PAGES 500 - 498
PAGES 500 RUNNING BACKWARD TO 498 SHALL BE RULED AND INDEXED TO RECORD CHIEF’S VISITS IN ACCORDANCE WITH REGULATIONS
WHERE IS THE “COMPANY DRILL” SECTION IN THE COMPANY JOUIRNAL AT HOUSE WATCH LOCATED?
PAGES 497 - 495
PAGES 497 RUNNING BACKWARDS TO 495 SHALL BE RULED AND INDEXED TO RECORD COMPANY DRILLS, USING THE FOLLOWING COLUMNAR HEADINGS: DATE, TRAINING SUBJECT, CONDUCTED BY, GROUPS ON DUTY.
IF YOU COMPANY IS THE BATTALION MASK DEPOT, WHERE IS THE “MSU MEMBERS ENTRY” SECTION IN THE COMPANY JOUIRNAL AT HOUSE WATCH LOCATED?
PAGES 494 RUNNING BACKWARDS AS NECESSARY
DATE, CYLINDERS EXCHANGED, CYLINDERS FOUND, OFFICER NOTIFIED, INSPECTED BY
WHERE IS THE COMPANY ROSTER AFFIXED TO IN THE COMPANY JOURNAL LOCATED IN HOUSEWATCH?
INSIDE THE FRONT COVER OF THE JOURNAL
WHAT IS CONSIDERED THE “GREATEST DANGER” FROM A RADIOLOGICAL INCENDIARY DEVICE (IRD)?
THE EXPANDING FIRE
ACCORDING TO FDNY PROTECTIVE ACTION GUIDELINES, WHAT IS THE DECISION DOSE FOR LIFESAVING OR PROTECTION OF LARGE POPULATIONS?
25 REM
ACCORDING TO FDNY PROTECTIVE ACTION GUIDELINES, WHAT IS THE DECISION DOSE FOR PROTECTION OF MAJOR PROPERTY?
10 REM
ACCORDING TO FDNY PROTECTIVE ACTION GUIDELINES, WHAT IS THE DECISION DOSE FOR GENERAL OPERATIONS AT A RADIOLOGICAL EMERGENCY?
5 REM
ACCORDING TO FDNY PROTECTIVE ACTION GUIDELINES, WHAT IS THE DECISION DOSE FOR LIFESAVING FOR A CATASTROPHIC EVENT?
50 REM
WHAT IS THE HOTZONE ESTABLISHED AT?
2 mR/HR
TWO MILILIREM AN HOUR
TWO WORDS
IF AN IMPROVISED NUCLEAR DEVICE (IND) GOES OFF, HOW LONG SHOULD UNITS RESPONDING WAIT, POST DETONATION, WHEN THE PRESENCE OF RADIATION CAN THEN BE DETECTED AND MONITORED?
AT LEAST 15 MINUTES
FOR A BIOLOGICAL EVENT, HOW LONG SHOULD RESPONDING UNITS WAIT BEFORE ENTERING?
30 - 60 MINUTES
WHAT IS THE FDNY’S ACTION LEVEL DURING A RADIOLOGICAL EMERGENCY?
1 mR/HR
ONE MILLIREM AN HOUR
ONE WORD
WHAT IS THE NORMAL BACKGROUND LEVEL OF RADIATION FOR NYC?
0.02 - 0.05 mR/HR
POINT OHH TWO - POINT OHH FIVE MILLIREM AN HOUR
AT A RADIOLOGICAL INCIDENT WHAT IS THE PRIORITY OF DECON?
- PATIENTS WITH LIFE THREATENING INJURIES (AFFECTING ABC’S)
- PATIENTS THAT ARE MOST SEVERELY CONTAMINATED BUT ARE NOT SYMPTOMATIC
- REMAINING CONTAMINATED PATIENTS PREGNANT WOMEN CHILDREN SENIOR CITIZENS NON-LIFE THREATENING INJURIES
YOU ARE ESTABLISHING AN ORDER OF DECON AT A RADIOLOGICAL INCIDENT, DECON THESE PEOPLE IN CORRECT ORDER:
CONTAMINATED PREGNANT WOMAN
CONTAMINATED CHILD
MIDDLE AGED ADULT MALE IN CARDIAC ARREST
MALE BODY BUILDER SEVERELY CONTAMINATED BUT NOT SYMPTOMATIC
- MIDDLE AGED MALE IN CARDIAC ARREST
- MALE BODY BUILDER SEVERELY CONTAMINATED BY NOT SYMPTOMATIC
- PREGNANT WOMAN/CHILD
YOU ARE ESTABLISHING AN ORDER OF DECON AT A RADIOLOGICAL INCIDENT, DECON THESE PEOPLE IN CORRECT ORDER:
CONTAMINATED PREGNANT WOMAN
CONTAMINATED CHILD
MIDDLE AGED ADULT MALE IN CARDIAC ARREST
MALE BODY BUILDER SEVERELY CONTAMINATED BUT NOT SYMPTOMATIC
- MIDDLE AGED MALE IN CARDIAC ARREST
- MALE BODY BUILDER SEVERELY CONTAMINATED BY NOT SYMPTOMATIC
- PREGNANT WOMAN/CHILD
YOU ARRIVE ON SCENE TO AN UNDER RIVER RAIL OP AND ARE IN CHARGE OF EVACUATING THE AMBULATORY VICTIMS. THEY WILL BE WALKING OUT OF THE TUNNEL, WHERE SHOULD YOU HAVE THEM WALK?
- OUTSIDE THE RAILS OPPOSITE THE 3RD RAIL
- IF VENTILATION FANS ARE IN OPERATION YOU WANT TO WALK TOWARDS THE SUPPLY FAN (INTO THE WIND)
- 3RD RAIL MAY CHANGE
HOW MANY FEET ARE 2 1/2 INCH OUTLETS LOCATED IN UNDER RIVER RAILS?
EVERY 200 FEET
SECTION VALVES ARE LOCATED EVERY _____ IN UNDER RIVER RAILS.
600 FT
++EVERY 3RD OUTLET THERE WILL BE A SECTION VALVE++
IN UNDERRIVER RAILS WHERE ARE EED’S LOCATED?
BOTH ENDS OF EACH UNDER RIVER TUBE AT THE BASE OF THE EMERGENCY EXITS
IN GRADE OR BELOW GRADE SUBWAYS WHERE ISTHE EED LOCATED?
50 FT SOUTH OF THE SOUTH BOUND PLATFORM
IN ELEVATED TRAINS, WHERE IS THE EED LOCATED?
IN THE AREA OF THE FULL TIME TOKEN BOOTH
IN SUBWAYS THE POST RADIO SHOULD NOT BE USED WHERE?
SOC
SIGNALS
TRAIN OPERATORS CABS
COMMUNICATION EQUIPMENT
YOU HAVE RESPONDED TO AN UNDER RIVER RAIL EMERGENCY, THE CHIEF PUTS YOUR COMPANY IN WITH THE VICTIM REMOVAL SECTOR. IN WHAT ORDER ARE VICTIMS REMOVED?
AMBULATORY VICTIMS (GREEN TAG/10-45 CODE 4)
NON-AMBULATORY VICTIMS (10-45 CODE 3) RED TAG (IMMEDIATE TRANSPORT) YELLOW TAG (DELAY TRANSPORT)
VICTIMS REQUIRING DISENTANGLEMENT (10-45 CODE 2) RED TAG (IMMEDIATE TRANSPORT) YELLOW TAG (DELAY TRANSPORT)
BLACK TAG (10-45 CODE 1) DECEASED
WHAT IS THE PRIMARY METHOD OF MOVING NON-AMBULATORY PATIENTS AND EQUIPMENT IN AN UNDER RIVER TUBE?
RAIL CARTS
WHAT IS THE PRIMARY METHOD OF MOVING NON-AMBULATORY PATIENTS AND EQUIPMENT IN AN UNDER RIVER TUBE?
RAIL CARTS
MUTUAL EXCHANGE RECORDS ARE RECORDED ON BP-57’S. HOW LONG ARE BP-57 KEPT FOR?
2 YEARS
WHICH ELECTRONIC SIREN IS PROHIBITED BY THE DEPARTMENT?
HIGH-LOW
THE SIREN IS A LOW SPEED WARNING DEVICE LINKED TO ABOUT A _____ FT RANGE AND A SPEED OF ABOUT _____ MPH.
125 FEET
30 MPH
THE SIREN IS A LOW SPEED WARNING DEVICE LINKED TO ABOUT A _____ FT RANGE AND A SPEED OF ABOUT _____ MPH.
125 FEET
30 MPH
AT VACANT BUILDINGS, WHEN STRETCHING HANDLINES INTO EXPOSURES FOR OPERATIONS INTO THE FIRE BUILDING, WHAT SIZE HOSELINE SHOULD BE STRETCHED?
2 1/2 INCH
IN UNDER RIVER RAILS 20 POUND DRY CHEMICAL EXTINGUISHERS ARE LOCATED WHERE?
20 POUND DRY CHEMICAL EXTINGUISHERS ARE LOCATED AT POWER REMOVAL BOXES APPRX. EVERY 600 FT.
TRUE/FALSE
SOUND POWERED PHONE JACKS ARE LOCATED AT ALL UNDER-RVIER STANDPIPE OUTLETS.
FALSE
EXCEPTION: JORALEMON TUBES BETWEEN BROOKLYN AND LOWER MANHATTAN
IN FD RIGS, HOW MANY POUNDS OF AIR PRESSURE SHOULD BE IN THE BRAKE SYSTEM BEFORE THE VEHICLE IS MOVED?
AT LEAST 60 POUNDS
IN FD RIGS, HOW MANY POUNDS OF AIR PRESSURE SHOULD BE IN THE BRAKE SYSTEM BEFORE THE VEHICLE IS MOVED?
AT LEAST 60 POUNDS
WHEN WILL THE WARNING BUZZER SOUND AND WARNING LIGHTS GO ON WHEN THE AIR PRESSURE IN THE RIGS SYSTEM FALLS TO APPROXIAMTELY?
55 TO 60 POUNDS
THE COMMUNICATIONS UNIT, SYSTEMS CONTROL UNIT AND LOBBY CONTROL UNIT ALL FUNCTION UNDER WHAT SECTION?
LOGISTICS SECTION
THE IMPACT OF THE WIND WILL BE AFFECTED BY 3 THINGS, WHAT ARE THEY?
SIZE OF WINDOW OPENING
FUEL LOAD
STAGE OF FIRE WHEN THE WINDOW FAILED
WHAT IS THE NEXT ACTION FOR AN AERIAL LADDER CHAUFFEUR AT A TAXPAYER FIRE AFTER HE HAS POSITIONED THE RIG AWAY FROM THE THE IMMEDIATE FIRE BUILDING?
JOINS THE FORCIBLE ENTRY TEAM, IF NOT DIRECTED OTHERWISE
WHAT IS THE NEXT ACTION FOR AN AERIAL LADDER CHAUFFEUR AT A TAXPAYER FIRE AFTER HE HAS POSITIONED THE RIG AWAY FROM THE THE IMMEDIATE FIRE BUILDING?
JOINS THE FORCIBLE ENTRY TEAM, IF NOT DIRECTED OTHERWISE
WHAT TAPE IS USED TO AFFIX AN NOV TO A LOBBY WALL?
MASKING TAPE
WHAT IS THE MOST DANGEROUS FIRE ESCAPE FOR OCCUPANTS AND FIRE FIGHTERS TO USE AT LOFT BUILDINGS?
VERTICAL FIRE ESCAPES
AT RAILROAD TRACKS SERVICED BY A DUAL POWERED SYSTEM, WHAT IS THE VOLTAGE OF THE GROUND LEVEL 3RD RAIL?
660 VOLTS DC
AT RAILROAD TRACKS SERVICED BY A DUAL POWERED SYSTEM, WHAT IS THE VOLTAGE OF THE GROUND LEVEL 3RD RAIL?
660 VOLTS DC
WHAT IS THE VOLTAGE OF THE AIR TRAIN?
750 VOLTS DC
WHERE ARE FLAT SLAB “MUSHROOM” FLOORS FOUND?
FIREPROOF LOFTS
A COLLAPSE OF A 6 STORY MULTIPLE DWELLING OR A PLANE CRASH NOT LOCATED IN A CITY AIRPORT GET WHAT TEN CODE?
10-60 CODE 2
HOW MANY BLANKETS MUST ALL CFRD COMPANIES CARRY ON THE APPARATUS AT ALL TIMES?
2 ON APPARATUS
6 BACK AT THE FIRE HOUSE STOCK
25 STOCKED AT CFR-D DEPOT
IF YOU ARE OPERATING A LADDER PIPE AND THE STREET HAS A SEVERE CROWN, THE ANGLE OF THE LADDER SHOULD NOT EXCEED HOW MANY DEGREES?
70 DEGREES
IN HIGH RISE OFFICE BUILDINGS, A RELIEF VALVE IS REQUIRED AT THE FIRE PUMP LIMITING THE PRESSURE TO ____ PSI ABOVE THAT REQUIRED TO DELIVER ITS RATED CAPACITY AT ____ PSI TO THE HIGHEST FLOOR OUTLET.
15 PSI
50 PSI
IN HIGH RISE OFFICE BUILDINGS, A RELIEF VALVE IS REQUIRED AT THE FIRE PUMP LIMITING THE PRESSURE TO 15 PSI ABOVE THAT REQUIRED TO DELIVER ITS RATED CAPACITY AT 50 PSI TO THE HIGHEST FLOOR OUTLET.
WHERE IS THE “EMERGENCY REMOVAL TRAINING KIT” ACQUIRED FROM?
BATTALION
WHERE IS THE “EMERGENCY REMOVAL TRAINING KIT” ACQUIRED FROM?
BATTALION
WHAT IS THE SMELL OF BURNT ALMONDS AN INDICATION OF?
BLOOD AGENT
BURNT ALMONDS - B.A. - BLOOD AGENT
WHEN ARE CARBIDE TIP BLADES CONSIDERED O.O.S. AND RETURNED TO TECHNICAL SERVICES?
EIGHT OF MORE TIPS ARE MISSING OR BROKEN
WORN DOWN TO THE CIRCUMFERENCE OF THE BLADE
WHEN IN THE ALUMINUM OXIDE BLADE O.O.S.?
BLADE IS WORN DOWN TO 8” DIAMETER OR LESS
WHEN UTILIZING THE P.S.S SYSTEM TO DESCEND FROM A DANGEROUS AREA, HOW FAR APART ARE YOUR FEET?
SHOULDER WIDTH
WHO MUST YOU NOTIFY IF YOU DETERMINE THAT A AERA THAT YOU HAVE ENTERED IS A CLANDESTINE LAB?
BATTALION AND DEPUTY CHIEF
HAZMAT
NYPD
BUREAU OF FIRE INVESTIGATION
AT A REPORTED DISPERSAL DEVICE IN A SUBWAY STATION, WHO DEFINES THE INITAL EXCLUSION ZONE WITH RED BARRIER TAPE?
2ND DUE TRUCK TEAM 2
WHO SHOULD THE 1ST DUE ENGINE INFORM IF VICTIMS COLLAPSE ON THEIR WAY FROM THE SUBWAY EXIT TO THE GROSS DECON AREA?
2ND ARRIVING LADDER COMPANY OFFICER AND INCIDENT COMMANDER
HOW MANY DOORWAYS MAY CAST IRON LOFTS HAVE FRONTING THE STREET?
4
FREIGHT ELEVATOR
RESIDENTIAL ELEVATOR
COMMERCIAL ENTRANCE
INTERIOR STAIRWAY ENTRANCE
ON A PCR WHAT DOES A CIRCLED FIREMAN’S NAME AT THE BOTTOM OF THE “CREW” SECTION INDICATE?
D FIREFIGHTER - DEFIB/DOCUMENTER - FF WHO FILLED OUT THE PCR
HOW MUCH PCB’S DOES A TRANSFORMER CONTAINING “SUN-OIL” OR “MOBIL-X” CONTAIN?
10-49 PPM
YOU RESPOND TO A MTA NYC TRANSIT SUBWAY STATION AND THE FULL TIME TOKEN BOOTH DOWS NOT HAVE THE SEE-THROUGH PROTECTIVE FOLDER THAT CONTAINS VALUABLE INFORMATION. AS THE OFFICER WHAT MUST YOU DO?
IMMEDIATELY ON RETURN TO QUARTERS CALL PTSU
WHAT ARE THE VOLTS OF THE LINES THAT RUN IN THE CEILING LEVEL IN UNDER RIVER TUBES?
1000 VOLTS
WHEN IS THE TOWER LADDER INTERCOM TESTED?
EACH TOUR
ACCORDING TO THE MANAGEMENT BULLETIN, WHEN SETTING PRIORITIES WHAT IS THE GENERALLY AGREED UPON PRIORITY ORDER?
SAFETY OF PEOPLE
PROTECTION OF PROPERTY
PEOPLE BEFORE PAPER
OUTSIDERS BEFORE INSIDERS
THE FDNY INCIDENT COMMAND SYSTEM BREAKS DOWN THE ELEMENTS TO SUCCESSFULLY MANAGE AN INCIDENT INTO 5 MAIN FUNCTIONS - WHAT ARE THEY?
C-FLOP
COMMAND FINANCE/ADMINISTRATION LOGISTICS OPERATIONS PLANNING
THE FDNY INCIDENT COMMAND SYSTEM BREAKS DOWN THE ELEMENTS TO SUCCESSFULLY MANAGE AN INCIDENT INTO 5 MAIN FUNCTIONS - WHAT ARE THEY?
C-FLOP
COMMAND FINANCE/ADMINISTRATION LOGISTICS OPERATIONS PLANNING
CAST IRON COLUMNS ARE UNPREDICTABLE AND FAIL ON AVERAGE IN ABOUT ____ MINS
30 MINUTES
WHAT IS THE COLOR OF THE FIRST RESPONDERS BRIDGE MANUAL “FIELD GUIDE”?
GREEN
WHAT IS THE COLOR OF THE FIRST RESPONDERS BRIDGE MANUAL “FIELD GUIDE”?
GREEN
WHAT IS THE COLOR OF THE “RISK MANAGEMENT GUIDE”?
RED
WHEN USING THE REARMOUNT AERIAL LADDER FOR A LADDER PIPE, WHAT IS THE CORRECT EXTENSION OF THE LADDER WITH A 1 1/2” TIP?
80 FT
IF YOU START THE TOUR WITH TWO CFR-D FIREFIGHTERS AND ONE GOES SICK DURING THE TOUR, ARE YOU INSERVICE FOR BOTH CFRD AND FIRE DUTY?
YES
IN SERVICE FOR BOTH FIRE DUTY AND CFRD RESPONSES
ONLY A STAFF CHIEF MAY APPROVE A VACATE ORDER, FOR RESIDENTIAL VACATES, IF THE DC DETERMINES THAT STRUCTURAL OR LIFE SAFETY CONDITIONS PERMIT, ______ HOUR(S) SHOULD BE GRANTED TO ALLOW OCCUPANTS TO PREPARE FOR RELOCATION.
6 HOURS
IF A COMPANY OFFICER’S PSS IS IN NEED OF REPLACEMENT, WHAT IS THE STATUS OF THE UNIT?
O.O.S.
THE NYLON TUBULAR WEBBING SHALL BE INSPECTED AFTER EACH USE AND AT WHAT OTHER TIME?
MONTHLY
WHEN ARE POSITIVE PRESSURE FANS INSPECTED?
DAILY AT THE BEGINNING OF THE 9X6 TOUR
RUN AT FULL RPM FOR 5 MINS WEEKLY AT MUD
IN HIGH RISE OFFICE BUILDINGS A BYPASS VALVE IN AN OPEN POSITION ON A 6” RISER WILL CAUSE A LOSS OF ____%.
45%
REMEMBER FIFTEEN
4+5+6=15
IN HIGH RISE OFFICE BUILDINGS A BYPASS VALVE IN AN OPEN POSITION ON A 8” RISER WILL CAUSE A LOSS OF _____%.
25%
REMEMBER FIFTEEN
2+5+8=15
HOW MANY PORTABLE LADDERS SHOULD BE ON TAXPAYERS?
A MINIMUM OF TWO PORTABLE LADDERS PLACED ON THE FRONT OF THE BUILDING
IF POSSIBLE ALL SIDES OF THE BUILDING SHOULD BE COVERED
WHAT IS THE MAXIMUM RANGE OF THE PAK-TRACKER?
90 FT
IS THE PAK-TRACKER INTRINSICALLY SAFE?
NO
NOT SUITABLE FOR USE IN POTENTIALLY FLAMMABLE OR EXPLOSIVE ATMOSPHERES
WHEN OPERATING AT FIRES IN PRIVATE DWELLINGS CONSTRUCTED OF LIGHTWEIGHT CONSTRUCTIONS, IN ALL CASES, WHAT WILL DICTATE THE FEASIBILITY OF FLOOR ABOVE OPERATIONS?
FIRE CONDITIONS
WHAT IS THE LOWEST FLOOR AN ENGINE CAN UTILIZE THE USE OF A UTILITY ROPE FROM A WINDOW TO STRETCH A HOSELINE?
3RD FLOOR WHEN IMPLEMENTING UTILITY ROPE STRETCH
IF A UNIT WERE TO EMPLOY A FIRE ESCAPE STRETCH, IF THE FIRE IS BELOW THE ___ FLOOR, THE FIRE ESCAPE HOOK IS NOT USED. THIS LINE IS STRETCHTED UP THE STAIR WELL OF THE FIRE ESCAPE.
4TH FLOOR
IN HIGH RISE OFFICE BUILDING, WHERE ARE THE 5 AREAS OF TWO WAY COMMUNICATIONS BETWEEN THE FIRE COMMAND STATION?
FLOOR WARDEN STATIONS
MECHANICAL CONTROL CENTER
ELEVATORS
AIR HANDLING CONTROL ROOMS
ELEVATOR MACHINERY ROOMS
WHAT IS THE NFPA DIAMOND SYMBOLIZE FROM BLUE RIGHT QUADRANT WORKING CLOCKWISE ENDING AT WHITE LOWER QUADRANT
“HOT FARTS REALLY SMELL”
BLUE - HEALTH
RED - FIRE
YELLOW - REACTIVITY
WHITE - SPECIAL
0-4
0 - OK
4 - MOST SEVERE
WHAT IS THE MAXIMUM SLOPE FOR TOWER LADDER OPERATIONS?
15 DEGREES
WHAT % SLOPE IS CONSIDERED LEVEL FOR THE USE OF TOWER LADDERS?
4%
BOOM OPERATIONS OF A TOWER LADDER SHOULD BE IN THE _______ DIRECTION.
UPHILL DIRECTION
AT CAST IRON LOFT CELLAR FIRES, WHAT 2 MEMBERS ASSIST IN VENTILATION BY OPENING UP SIDEWALK ACCESS POINTS?
1ST AND 2ND DUE LCC
HOW MANY HYDRANTS CAN BE LISTED ON THE CD-63, DEFECTIVE HYDRANT REPORT?
7
A MAXIMUM OF 7 HYDRANTS CAN BE LISTED
IF ORDERED BY THE I.C. TO BECOME THE STREET COORDINATION MANAGER AT A MAJOR COLLAPSE, WHICH TWO AGENCIES MUST YOU ESTABLISH CONTACT WITH?
COLLAPSE 8.8.2 (LOOK UP)
NYPD - ENSURE TRAFFIC FLOW IS MAINTAINED
EMS - CAUSALITY COLLECTION POINT & ENSURE TRAFFIC FLOW IS MAINTAINED
TOWER LADDERS HAVE SCRUB AREAS THAT COVER THE FRONT OF A BUILDING 60 FT HIGH AND 50 FT WIDE AND WILL COVER A _____ FOOT FRONTAGE ON THE LOWER THREE FLOORS OF A BUILDING.
100 FT
WHAT COLOR PAINT IS USED TO MARK VACANT BUILDINGS?
LIME YELLOW REFLECTIVE PAINT
WHAT SIZE IS THE “SQUARE WITH THE X”, THE MARKING OF THE VACANT?
SQUARE IS 18”X18” LINES ARE MADE 2” WIDE
WHEN DOES THE CO DETECTOR (GASALERT EXTREME) LOW ALARM AT?
WHEN CO EXCEEDS 35 PPM
WHEN DOES THE CO DETECTOR (GASALERT EXTREME) HIGH ALARM AT?
WHEN CO EXCEEDS 100 PPM
WHAT COLOR SMOKE ARE ASSOCIATED WITH BACKDRAFTS?
DENSE BLACK
DIRTY BROWN
YELLOW BROWN
GRAY YELLOW
WHAT COLOR SMOKE ARE ASSOCIATED WITH BACKDRAFTS?
DENSE BLACK
DIRTY BROWN
YELLOW BROWN
GRAY YELLOW
WHAT % SLOPE IS CONSIDERED LEVEL FOR THE USE OF TOWER LADDERS?
4%
IF 287H WERE LISTED ON A RESPONSE TICKET, YOU WOULD KNOW THAT 287 WAS DESIGNATED?
HAZMAT TECH UNIT
IF 298P WERE LISTED ON A RESPONSE TICKET, YOU WOULD KNOW THAT 298 WAS DESIGNATED?
HIGH PRESSURE ENGINE
TRUE/FALSE
THE 1ST ARRIVING LADDER AT A BROWNSTONE FIRE IS RESPONSIBLE FOR HAVING A MEMBER PHYSICALLY CHECK THE SIDES AND REAR.
FALSE
THE 1ST LADDER IS RESPONSIBLE FOR A VISUAL CHECK OF THE REAR AND SIDES FROM ROOF LEVEL
2ND LADDER IS RESPONSIBLE TO ACTUALLY CHECK THE REAR AND SIDES
BUILDING BUILT BEFORE ____ ARE NOT REQUIRED TO HAVE A CERTIFICATE OF OCCUPANCY.
1938
IN HRFPMD WHO PICKS THE ATTACK STAIRS?
ENGINE COMPANY OFFICER AND LADDER COMPANY OFFICER SELECT THE ATTACK STAIR
WHAT NUMBER IS USED TO REPRESENT SPARE RADIOS IN REGARDS TO THE 7 DIGIT INTERNAL CODES USED FOR H.T.?
6
BLUE LIGHT POWER REMOVAL BOXES FOR THE AIR TRAIN ARE LOCATED EVERY?
800 FT
WHAT ARE THE 3 ACCEPTABLE AIR SUPPLYS FOR INFLATING WATER RESCUE HOSE
FF SCBA
FAST PAK
APPARATUS AIR OUTLET
HOW MANY GLOW STICKS SHALL EACH COMPANY CARRY ON THEIR APPARATUS
10
AS THE OFFICER AT THE SCENE OF SOMEONE PINNED UNDER A NYC SUBWAY CAR, WHAT SHOULD BE YOUR FIRST CONSIDERATION AT THE SCENE?
POWER REMOVAL
WHAT ARE CONSIDERED SINGLE UNIT OPERATIONS?
BROIL FOSS
BRUSH FIRES
OUTSIDE RUBBISH
INCINERATORS
WATER LEAK
FOOD ON STOVE OIL BURNERS ODOR OF SMOKE STEAM DISCHARGE SPRINKLER DISCHARGE
HOW WOULD YOU RESPOND TO A ASSIGNMENT AS A SALVAGE TRUCK?
10-20 RESPONSE MODE
UNITS RESPONDING TO A WATER LEAK WOULD BE CORRECT TO RESPOND IN?
10-20 RESPONSE MODE
WHAT IS THE THERMAL IMAGING CAMERAS AVERAGE FIELD OF VIEW?
50 DEGREES
WHAT IS THE THERMAL IMAGING CAMERAS AVERAGE FIELD OF VIEW?
50 DEGREES
WHAT IS THE CORRECT WAY TO USE THE THERMAL IMAGING CAMERA?
WHEN OPERATING THE TIC, STAY LOW AND SLOWLY SCAN THE AREA STARTING AT CEILING AND WORK YOUR WAY TO THE FLOOR
WHAT IS THE CORRECT WAY TO USE THE THERMAL IMAGING CAMERA?
WHEN OPERATING THE TIC, STAY LOW AND SLOWLY SCAN THE AREA STARTING AT CEILING AND WORK YOUR WAY TO THE FLOOR
TRUE/FALSE
TIC’S ARE CAPABLE OF DETECTING ALL HAZMAT VAPOR CLOUDS.
FALSE
TIC’S ARE CAPABLE OF DETECTING SOME HAZMAT VAPOR CLOUDS
THE FOCAL POINT OF THE TIC IS APPROX. ____ FT FROM THE CAMERA LENS.
3FT
UNITS ARRIVE TO A 2 STORY FLAT ROOF PD WITH FIRE ON THE TOP FLOOR, WHICH MEMBER IS RESPONSIBLE FOR BRINGING THE 1ST SAW TO THE ROOF?
2ND DUE ROOF FF
WHAT ARE THE CORRECT DISTANCES FROM CAR AIRBAGS?
5-10-20 RULE
5” FROM SIDE AIR BAGS
10” FROM DRIVER AIR BAGS
20” FROM PASSENGER AIR BAGS
ACCORDING TO FDNY LOFTS, CAST IRON LOSES HOW MUCH OF ITS ORIGINAL STRENGTH WHEN HEATED TO 1,100 DEGREES FAHRENHEIT?
58%
IF THE 3RD DUE TRUCK AT A HIGH RISE OFFICE BUILDING FIRE IS HAVING DIFFICULTY CLEARING THE ATTACK STAIRWAY OF FLEEING OCCUPANTS. WHO CAN THEY ADVISE OF THIS PROBLEM?
- 1ST LADDER
- FIRE SECTOR SUPERVISOR
- FIRE BRANCH DIRECTOR
MEMBERS WHOSE DRIVER’S LICENSES HAVE BEEN SUSPENDED, REVOKED, EXPIRED OR IN ANY WAY CONSIDERED INVALID SHALL NOT DRIVE ANY DEPARTMENT VEHICLES AND SHALL FORWARD A REPORT?
CHIEF OF PERSONNEL
WITHIN ONE WEEK OF SUCH OCCURRENCE
WHEN IS THE AUXILIARY FIRE PROTECTION EQUIPMENT IN TUNNELS AND ON BRIDGES ALSO TOWERS, SHAFTS AND APPROACHES THERETO, SHALL BE INSPECTED?
SEMI-ANNUALLY DURING APRIL AND OCTOBER
BOAT
BRIDGES OCTOBER APRIL TUNNELS
WHEN ARE SUBWAY EMERGENCY EXITS INSPECTED?
SEMI-ANNUALLY DURING MARCH AND SEPTEMBER
IN COLD WATER, WHEN THE BODY’S CORE TEMPERATURE DROPS TO BELOW ____ DEGREES FAHRENHEIT, THE VICTIM TRANSGRESSES FROM BEING NON-AMBULATORY TO UNCONSCIOUS.
90 DEGREES FAHRENHEIT
WHEN REQUESTING AN AMBULANCE, WHAT MUST YOU PROVIDE THE DISPATCHER WITH?
CHRIS AND CHARLIE CAN PLAY RUGBY
CUPS STATUS
AGE
CHIEF COMPLAINT
IF CPR INITIATED
PULSE AND RESPIRATORY RATE
+++SEX NOT NEEDED+++
HOW MANY TURNS ARE REQUIRED ON THE SHIPPERS LINES OF THE BUCKEYE PIPELINE?
24 FULL TURNS
HOW MANY TURNS ARE REQUIRED ON THE IRIQUOIS PIPELINE?
213 TURNS
HOW MANY TURNS ARE REQUIRED ON THE IRIQUOIS PIPELINE?
213 TURNS
HOW MANY TURNS ARE REQUIRED ON THE IRIQUOIS PIPELINE?
213 TURNS
HOW MANY HALF TURNS ARE REQUIRED TO CLOSE A NORMAL BUCKEYE PIPELINE VALVE?
84 HALF TURNS
42 FULL TURNS
YOU LADDER IS CALLED TO A SCENE OF “WIRES DOWN”, WHAT IS THE CORRECT TEN CODE TO TRANSMIT?
10-40 CODE 2
HOW IS A COMPLAINT RECORDED IN THE FLAGGING COLUMN OF THE COMPANY JOURNAL?
COM
WHAT ARE THE 3 TIMES A CFR-D UNIT MUST TRANSMIT A 10-99?
- CONFIRMED CARDIAC/RESPIRATORY ARREST
- ANY SITUATION WHERE THE OFFICER DETERMINES THE COMPANY WILL LIKELY REMAIN ON SCENE FOR 30 MINS OR MORE
- ANY CFR-D RESPONSE WHERE IN RESPONSE TO A REQUEST FOR AN ETA FOR EMS FROM THE COMPANY ON SCENE, EMS REPORTS NO UNIT AVAILABLE
WHAT ARE THE 3 TIMES A CFR-D UNIT MUST TRANSMIT A 10-99?
- CONFIRMED CARDIAC/RESPIRATORY ARREST
- ANY SITUATION WHERE THE OFFICER DETERMINES THE COMPANY WILL LIKELY REMAIN ON SCENE FOR 30 MINS OR MORE
- ANY CFR-D RESPONSE WHERE IN RESPONSE TO A REQUEST FOR AN ETA FOR EMS FROM THE COMPANY ON SCENE, EMS REPORTS NO UNIT AVAILABLE
IN AN OLT, YOU WANT TO BREACH A WALL OR PARTITION BECAUSE YOU ARE IN AN UNTENABLE POSITION, WHAT IS THE ORDER OF PREFERENCE IN TOOLS TO GET THIS JOB DONE?
HALLIGAN
HOOK
AXE
HOW DO YOU PLACE A HVAC IN NON-CIRCULATING MODE?
OPEN ALL OUTSIDE SUPPLY DAMPERS
CLOSE ALL MIXING DAMPERS
OPEN ALL EXHAUST DAMPERS
WHAT ARE THE FDNY CORE COMPETENCIES ACCORDING TO CIMS?
FEMSLAM
FIRE SUPPRESSION PRE-HOSPITAL EMERGENCY MEDICAL CARE SEARCH AND RESCUE STRUCTURAL EVACUATION CBRN/HAZMAT LIFE SAFETY OPS AND MASS DECON ARSON INVESTIGATION
TRUE/FALSE
AT AUTO EXTRICATIONS, THE FDNY IS THE PRIMARY AGENCY.
FALSE
++FIRST TO ARRIVE AT BOTH AUTO EXTRICATION/BOAT IN DISTRESS DETERMINES WHO IS IN COMMAND++
A BLACK TAGGED VICTIM WOULD BE A?
10-45 CODE 1
A GREEN TAGGED VICTIM WOULD BE A?
10-45 CODE 4
A RED/ORANGE TAGGED VICTIM WOULD BE A?
10-45 CODE 2
A YELLOW TAGGED VICTIM WOULD BE A?
10-45 CODE 3
WHEN ARE PORTABLE LADDERS THOROUGHLY INSPECTED?
MONTHLY
WHERE IS THE UNIT DESIGNATION MARKED ON PORTABLE LADDERS?
UNIT DESIGNATION SHALL BE MARKED WITHIN 18 INCHES OF EACH BUTT END ON PORTABLE LADDERS
WHAT COLOR TAPE IS USED IN ESTABLISHING THE PERIMETER FOR THE CONTAMINATION REDUCTION ZONE?
YELLOW
APPARATUS AIR BRAKES SYSTEMS ARE EQUIPPED WITH A LOW PRESSURE INDICATOR. A WARNING BUZZER, WARNING LIGHT OR BOTH WILL ACTIVATE WHEN PRESSURE FALLS TO APPRX.?
55 TO 60 POUNDS
@ 45-50 POUNDS IT ALSO ALARMS
IN REGARDS TO WATER LOSS, IF NOZZLE FLOW IS INSUFFICIENT (OFFICER IS CALLING FOR MORE WATER) AND THE PRESSURE GUAGE IS READING NORMAL OR HIGHER WHILE THE FLOW METER HAS A REDUCED READING, WHAT IS THIS AN INDICATION OF?
KINK
PRESSURE - NORMAL/HIGHER, FLOWMETER - REDUCED = KINKS
IN REGARDS TO WATER LOSS, IF NOZZLE FLOW IS SEVERELY INADEQUATE (OFFICER REPORTING URGENT! LOSS OF WATER) AND THE PRESSURE GUAGE IS READING NORMAL OR HIGHER WHILE THE FLOW METER IS SEVERELY REDUCED OR NO READING, WHAT IS THIS AN INDICATION OF?
MULTIPLE OR SEVER KINKS
PRESSURE - NORMAL/HIGHER, FLOWMETER -SEVERELY REDUCED/NO READING = SEVERE KINKS
IN REGARDS TO WATER LOSS, IF NOZZLE FLOW IS SEVERELY INADEQUATE (OFFICER REPORTING URGENT! LOSS OF WATER) AND THE PRESSURE GUAGE (ON A PRE-1997 APPARATUS WITH ROSS RELIEF VALVE) IS READING DECREASED WHILE THE FLOW METER IS INCREASING WHAT IS THIS AN INDICATION OF?
BURST LENGTH
IN REGARDS TO WATER LOSS, IF NOZZLE FLOW IS SEVERELY INADEQUATE (OFFICER REPORTING URGENT! LOSS OF WATER) AND THE PRESSURE GUAGE REMAINS THE SAME WITH ENGINE SPEED INCREASING AUTOMATICALLY WHILE THE FLOW METER IS INCREASING WHAT IS THIS AN INDICATION OF?
BURST LENTH
WHAT IS THE OPTIMUM PLACEMENT OF PPV AT THE ATTACK STAIRWAY DOOR?
4-6 FT BACK AT 80 DEGREE ANGLE
A SMALL SPILL AT A FOAM OPERATION IS HOW MANY SQUARE FEET OR LESS?
600 SQUARE FEET OR LESS
EXAMPLES:
OIL BURNER WITH FIRE OUTSIDE THE PIT
GAS PUMP KNOCKED OVER
CAR FIRE WITH RUPTURED GAS TANK
A MEDIUM SPILL AT A FOAM OPERATION IS CONSIDERED HOW MANY SQUARE FEET?
MEDIUM SPILL OVER 600 SQUARE FEET INCLUDES USE OF SELF-EDUCTING NOZZLES
TANKER TRUCK MISHAP
LOADING RACK OR SIMILAR SITUATION
A LARGE SPILL AT A FOAM OPERATION IS CONSIDERED HOW MANY SQUARE FEET?
SPILLS OVER 2,000 SQUARE FEET
MASTER STREAM NOZZLES ARE USED
OIL TANK FARMS
LARGE CAPACITY TANK TRUCK THAT HAS SPILLED ITS PRODUCT
WHICH TRUCK IS RESPONSIBLE FOR FOR SHUTTING DOWN THE UTILITIES AT A TAXPAYER FIRE.
1ST DUE TRUCK
DURING HOSE TEST PROCEDURES, WHAT IS THE TOTAL AMOUNT OF HOSE THAT CAN BE TESTED AT ONE TIME.
38 LENGTHS
++HOSE MUST BE STRETCHED FROM AN OUTLET ON THE OTHER SIDE OF THE APPARATUS OPPOSITE THE CONTROL PANEL++
AT WHAT TIME DURING THE NIGHT TOUR MUST VISITORS EXIT QUARTERS?
VISITORS SHALL NOT BE PERMITTED TO REMAIN IN QUARTERS AFTER 2200HRS
ON AFID, WHERE ARE THE 5 PLACES YOU ARE NOT ALLOWED TO PARK THE APPARATUS?
DO NOT:
- DOUBLE PARK
- PARK IN BUS STOPS
- PARK ALONGSIDE BUILDING MATERIALS LOCATED BEYOND THE SIDEWALK AT CONSTRUCTION OR DEMOLITION SITES
- HAVE ALL OR PART OF APPARATUS EXTENDING INTO AN INTERSECTION
- BLOCK THE FLOW OF VEHICULAR TRAFFIC
YOU ARE THE 4TH DUE NOZZLE MAN AT A FIRE IN A HRFPMD ON THE 22ND FLOOR. YOUR COMPANY IS SETTING UP THE HIGH RISE NOZZLE. AS A HEADS UP STUDENT YOU KNOW THAT THE HIGH RISE NOZZLE WILL NOT BE OPERATED UNTIL THE _____ GIVES APPROVAL.
INCIDENT COMMANDER
++THE HRN WILL NOT BE OPERATED UNTIL THE IC HAS GIVEN APPROVAL++
THE HRN IS SUPPLIED WITH _____” HOSE, IT WILL PRODUCE FLOWS OF _________ GPM AT ______ PSI NOZZLE PRESSURE WITH WATER FLOWING.
HRN - SUPPLIED WITH 2 1/2” HOSE
200-225 GPM @ 50 PSI
WHEN DOES A THOROUGH INSPECTION OF AERIAL, TOWER AND PORTABLE LADDERS TAKE PLACE?
MONTHLY
TAXPAYERS STATES THAT A 50 FT LONG I BEAM HEATED UNIFORMLY OVER ITS LENGTH TO 970 DEGREES F. WILL EXPAND HOW MUCH?
APRX. 4 INCHES
++An average 50 foot long steel beam, heated uniformly over its length to 970 F will extend in length approximately four inches.++
IN ORDER WHAT ARE THE 3 STAGES OF THE FIRE SUPPRESSION EFFORT?
- EXACT LOCATION OF FIRE
- CONFINEMENT OF FIRE
- EXTINGUISHMENT OF FIRE
WHAT SIDE OF THE HARNESS IS THE PRESSURE REDUCING ASSEMBLY LOCATED?
LEFT SIDE
++The Pressure Reducer Assembly (PRA), mounted on the left side of the backframe, reduces the high pressure breathing air received from the cylinder. Consisting of two systems, the PRA normally reduces the operating pressure to 100 psi before entering the regulator’s low pressure hose. The regulator then controls the pressure within the facepiece to slightly above atmospheric pressure.++
WHAT EXTRA TOOL SHOULD AN ENGINE COMPANY INCLUDE IN ITS ASSIGNMENT IF ORDERED TO STRETCH A LINE TO THE TOP FLOOR OF AN EXPOSURE AT A ROWFRAME BUILDING FIRE FOR THE PURPOSE OF EXTINGUISHING FIRE IN THE COCKLOFT?
6 FT HOOK
++An engine company, ordered to stretch a hoseline to the top floor of an exposure for purposes of extinguishing the fire in the cockloft, should take a six-foot hook to pull ceilings.++
TRUE/FALSE
THE MV-104 FORM IS COMPLETED BY THE OFFICER AND SENT TO NYS DMV WITHIN 10 DAYS & FD SAFETY COMMAND ACCIDENT CLAIMS UNIT WITHIN 96 HOURS (4 DAYS) OF AN ACCIDENT RESULTING IN DEATH, PERSONAL INJURY, DAMAGE OVER $1000 OR IF A DOLLAR AMOUNT CANNOT BE ESTIMATED.
FALSE
VEHICLE OPERATOR FILLS OUT AND FORWARDS MV-104
++The original New York State Report of Motor Vehicle Accident (MV-104 revised 5/02) must be completed and sent NYS Department of Motor Vehicles within 10 days, and a copy must be sent to the Safety Command-Accident Claims Unit within 96 hours of an accident resulting in death, personal injury, damage over $1,000 to the property of any one person, or if a dollar amount can not be estimated. This is the express responsibility of the vehicle operator involved in the accident.++
TRUE/FALSE
THE MV-104 FORM IS COMPLETED BY THE OFFICER AND SENT TO NYS DMV WITHIN 10 DAYS & FD SAFETY COMMAND ACCIDENT CLAIMS UNIT WITHIN 96 HOURS (4 DAYS) OF AN ACCIDENT RESULTING IN DEATH, PERSONAL INJURY, DAMAGE OVER $1000 OR IF A DOLLAR AMOUNT CANNOT BE ESTIMATED.
FALSE
VEHICLE OPERATOR FILLS OUT AND FORWARDS MV-104
++The original New York State Report of Motor Vehicle Accident (MV-104 revised 5/02) must be completed and sent NYS Department of Motor Vehicles within 10 days, and a copy must be sent to the Safety Command-Accident Claims Unit within 96 hours of an accident resulting in death, personal injury, damage over $1,000 to the property of any one person, or if a dollar amount can not be estimated. This is the express responsibility of the vehicle operator involved in the accident.++
What type of radiation is the Ultra Radiac capable to detect?
GAMMA AND X-RAY
According to Dunn, during a fire, which of the following beams has the greatest structural stability?
CONTINUOUS BEAM
Steel tension cables or rods, used to tie-in opposing walls due to age and deterioration, can fail at a minimum of?
800 DEGREES FARENHEIT
Members whose driver’s licenses have been suspended, revoked, expired, or in any way considered invalid, shall not drive any Department vehicles and shall forward a report?
Chief of Personnel within one week of such occurrence.
According to FDNY Regulations, auxiliary fire protection equipment in tunnels and on bridges, also towers, shafts, and approaches thereto, shall be inspected when?
Semi-annually during April and October
While operating on subway tracks, a member should be directed to halt train traffic with a light. This member should warn train operators by holding the light chest high and move it in a horizontal motion of at least how many feet?
4 FT
Members drilling on the UltraRadiac radiological monitoring instrument would know that the low rate alarm for this instrument is set at?
2 mR/hr
FDNY LOW DOSE RATE?
5 REM
FDNY HIGH RATE?
50 Rem/HR
FDNY HIGH DOSE?
12 REM
C:When the body’s core temperature begins to drop below ______ Fahrenheit, the victim transgresses from being non-ambulatory to unconscious
90 degrees F.
HOW MANY PORTABLE LADDERS SHOULD BE ON TAXPAYERS?
A MINIMUM OF TWO PORTABLE LADDERS PLACED ON THE FRONT OF THE BUILDING
IF POSSIBLE ALL SIDES OF THE BUILDING SHOULD BE COVERED
IN UNDER RIVER RAIL Section valves for standpipes are located approximately ______ ft apart.
600 FT
According to Dunn’s book Collapse of Burning Buildings, which choice best represents how a braced frame building fails?
Inward/outward collapse
IN HIGH RISE OFFICE BUILDINGS A BYPASS VALVE IN AN OPEN POSITION ON A 6” RISER WILL CAUSE A LOSS OF ____%.
45%
REMEMBER FIFTEEN
4+5+6=15
AT A HRFPMD FIRE ON THE 6TH FLOOR, WHERE WILL THE FAST UNIT & CFRD ENGINE BE STAGED?
AS DETERMINED BY IC
++The FAST Unit and CFR Engine shall be assigned to the Fire Sector when the fire is above the sixth floor. They can be staged on the floor below the fire floor, ready for rapid deployment. At lower floor fires (sixth floor or below), the position of the FAST Unit and the CFR Engine will be determined by the Incident Commander. The FAST Unit should carry a set of elevator keys.++
FOR A HRFPMD FIRE ON THE 7TH FLOOR OR HIGHER WHERE SHOULD THE FADT UNIT OR CFRD ENGINE BE STAGED?
ASSIGNED TO THE FIRE SECTOR
++The FAST Unit and CFR Engine shall be assigned to the Fire Sector when the fire is above the sixth floor. They can be staged on the floor below the fire floor, ready for rapid deployment. At lower floor fires (sixth floor or below), the position of the FAST Unit and the CFR Engine will be determined by the Incident Commander. The FAST Unit should carry a set of elevator keys.++
UNITS RESPOND TO A 10-77 ON THE 27TH FLOOR - E267 IS ASSIGNED AS THE CFRD ENGINE & L125 IS ASSIGNED THE FAST TRUCK, WHERE SHOULD THESE COMPANIES REPORT INTO?
FIRE SECTOR
++The FAST Unit and CFR Engine shall be assigned to the Fire Sector when the fire is above the sixth floor. They can be staged on the floor below the fire floor, ready for rapid deployment. At lower floor fires (sixth floor or below), the position of the FAST Unit and the CFR Engine will be determined by the Incident Commander. The FAST Unit should carry a set of elevator keys.++
AT A WIND DRIVEN FIRE THE IMPACT OF THE WIND WILL BE AFFECTED BY 3 THINGS:
- SIZE OF WINDOW
- FUEL LOAD
- STAGE OF FIRE WHEN WINDOW FAILED
AT WIND DRIVEN FIRES WITH THE APT DOOR LEFT OPEN, ONCE AN ALTERNATE STRATEGY HAS BEEN IMPLEMENTED (KO CURTAIN/HRN) WHO DOES THE TRUCK OFFICER OBTAIN PERMISSION FROM TO ENTER THE PUBLIC HALLWAY?
- IC
- FIRE SECTOR SUPERVISOR
- OPERATIONS SECTION CHIEF
AT A WIND DRIVEN FIRE (DOOR LEFT OPEN OR DOOR CLOSED BUT WINDOW FAILURE HAS OCCURRED) PRIOR TO THE ENGINE COMPANY’S ENTERING THE FIRE APARTMENT THE ENGINE COMPANY OFFICER MUST CONTACT THE ROOF FF OR FF OPERATING IN THE APT ABOVE FOR 3 PIECES OF INFORMATION - WHAT SHOULD THE ECO REQUEST?
- DESCRIPTION OF FIRE APT
- LOCATION OF MAIN BODY OF FIRE
- MOST DIRECT ROUTE TO FIRE
AT SUBWAY FIRES/EMERGENCIES Any firefighter who recognizes that the involved station is served by a dry standpipe system shall relay this information back to the _________ and _________.
ENGINE OFFICER & ENGINE CHAUFFEUR
++Any firefighter who recognizes that the involved station is served by a dry standpipe system shall relay this information back to the engine officer and chauffeur.++
WHAT IS THE PRIMARY CONSIDERATION IN PRIVATE DWELLING CONSTRUCTED OF LIGHTWEIGHT MATERIALS?
COLLAPSE
++Collapse is always the primary consideration in buildings constructed with lightweight materials.++
WHEN USING THE MSA ALTAIR DIGITAL GAS METER, NORMAL OXYGEN READING WILL BE?
20.8%
THE REMOVAL OF THE KO CURTAIN MUST BE APPROVED BY THE _______. THE REQUEST FOR REMOVAL OF THE KO CURTAIN WILL BE MADE BY THE ______ INSIDE THE FIRE APT, AFTER CONSULTING WITH THE ____________________.
- IC
- LADDER COMPANY OFFICER INSIDE FIRE APT
- ENGINE COMPANY OFFICER IN CHARGE OF HOSELINE INSIDE APT.
A ENGINE COMPANYASSISGNED 4TH DUE AT A HRFPMD IS RESPONSIBLE FOR THE HIGH RISE NOZZLE, WHAT IS THE UNITS TOOL ASSIGNMENT?
- ONE LENGTH OF 2 1/2” HOSE PER FF
- STANDPIPE KIT
- HIGH RISE NOZZLE
- CONTROLLING NOZZLE
CHILDREN UNDER THE AGE OF _____ YEARS OF AGE SHALL NOT BE PERMITTED TO ENTER QUARTERS WITHOUT A PARENT OR GUARDIAN, UNLESS GRANTED WRITTEN PERMISSION BY THE FIRE COMMISSIONER.
15
CARBON MONOXIDE HAS A LOWER EXPLOSIVE LEVEL (LEL) OF _______ AND AND UPPER EXPLOSIVE LEVEL (UEL) OF ________.
CARBON MONOXIDE
LEL-12.5%
UEL-74%
WHEN AN ENGINE COMPANY IS DRAFTING WHAT, WHAT TYPE OF CONNECTION MUST BE USED?
DRAFTING-10 FT HARD SUCTION MUST BE USED
WHEN AN ENGINE IS 1ST TO ARRIVE ON THE 1ST ALARM, WHAT TYPES OF CONNECTIONS CAN BE USED?
10’ SMALL HYDRANT CONNECTION OR THE 35’ SOFT HYDRANT CONNECTIONS
AT 2ND OR GREAT ALARMS WHAT TYPE OF CONNECTION SHOULD ENGINE COMPANIES USE?
10’ HARD SUCTION
FOR A TOWER LADDER, THE IDEAL DISTANCE FROM THE BUILDING IS ____ FT, WITH THE FRONT OF THE RIG AT A _____ ANGLE AWAY FROM THE FRONT OF THE BUILDING YOU CAN REACH A HEIGHT OF ____ FT, WIDTH OF ____ FT. AND ____ FT. ON THE LOWER THREE FLOORS
-32 FT
-15 DEGREE ANGLE AWAY FROM BUILDING
-60 FT
-50 FT
100 FT
++FOR A TOWER LADDER, THE IDEAL DISTANCE FROM THE BUILDING IS 32 FT, WITH THE FRONT OF THE RIG AT A 15 DEGREE ANGLE AWAY FROM THE FRONT OF THE BUILDING YOU CAN REACH A HEIGHT OF 60 FT, WIDTH OF 50 FT. AND 100 FT. ON THE LOWER THREE FLOORS++
A PROPERLY POSITIONED TOWER LADDER CAN REACH POINTS ______ FEET BELOW GRADE AND A MAXIMUM BASKET FLOOR ELEVATION OF APPRX. ______ FEET.
10 FT
70 FT
++A PROPERLY POSITIONED TOWER LADDER CAN REACH POINTS 10 FEET BELOW GRADE AND A MAXIMUM BASKET FLOOR ELEVATION OF APPRX. 70 FEET.++
10-1
CALL YOUR QUARTERS OR ANOTHER UNITS QUARTERS
10-2
RETURN TO QUARTERS
10-9
UNIT OUT OF RADIO CONTACT
10-5
REPEAT MESSAGE
10-6
STAND BY
WHEN ORDERED TO SET UP 2 HANDLINES FOR EMERGENCY DECON AT THE SCENE OF A CHEMICAL SPILL - HOW FAR APART SHOULD YOU POSITION THE HANDLINES?
25-30 FT APART
50-80 PSI
2 1/2” LINES WITH AQUASTREAM FOG NOZZLE
WHEN IS THE KO CURTAIN INSPECTED?
WEEKLY DURING MUD AND AFTER EACH USE
WHEN IS THE CARBIDE TIP SAW BLADE PLACED OUT OF SERVICE?
CARBIDE TIP BLADES OOS:
-8 OR MORE TIPS ARE MISSING OR BROKEN
-WORN DOWN TO THE CIRCUMFERENCE OF THE BLADE
NO FIRE DEPT EMPLOYEES SHALL MAKE ANY NOTIFICATION TO ANY SUPERIOR OFFICERS OR ANY OTHER ANNOUNCEMENTS REGARDING THE ENTRY OR PRESENCE OF _____, _______ OR __________.
DOI
BITS
TESTING UNIT PERSONNEL
REGS 20 3.10 3.11
WHAT IS METHANOL’S FLASH POINT?
54 DEGREE F
WHEN USING THE SEARCH ROPE, HOW HIGH ABOVE GROUND SHALL IT BE MAINTAINED?
1-2 FEET ABOVE GROUND
WHERE WILL UNITS FIND MANHOLE HOOKS?
2 MANHOLE HOOKS ARE FOUND ON ALL BATTALION VEHICLES
L136 PULLS UP 1ST DUE TO A 40 STORY MD WITH FIRE OUT 2 WINDOWS ON THE 22ND FLOOR, WHAT TEN CODE SHOULD BE TRANSMITTED?
2ND ALARM (10-77 2ND ALARM)
HIGH RISE MD 6.6.2B
L136 ARRIVES SECOND DUE TO THE “BIG 6” A HIGH RISE MD, AS THE 2ND DUE TRUCK IS RESPONSIBLE TO CHECK THE HALLWAY AND THE ATTACK STAIRS FOR ______ FLOORS ABOVE THE FIRE FLOOR.
5 FLOORS
WHEN USING THE MSA ALTAIR DIGITAL GAS METER, NORMAL OXYGEN READING WILL BE?
20.8%
10-3
CALL DISPATCH BY PHONE
L132’S PAK TRACKER HAS JUST BEEN PLACED OUT OF SERVICE, THE LT. CONTACTED MSU AND ARRAINGED FOR A PCK-UP/REPLACEMENT. WHAT SHOULD BE THE LT.’S NEXT MOVE?
CALL DIVISION FOR SPARE PAK TRACKER WHILE AWAITING MSU SPARE
++SCBA 8 8.1++
Inspect and test the Pak-Tracker locator system before each use and at the start of each tour. If any malfunction of the Pak-Tracker locator system is noted during the inspection, place the device out of service, attach an RT-2 indicating the problem and contact MSU for replacement. Each Division has been issued a spare Pak-Tracker. The company shall contact the Division for a spare while awaiting replacement from MSU.
TRUE/FALSE
ALL MEMBERS HEARING A EMERGENCY ALERT TONE SHALL CEASE RADIO TRANSMISSIONS UNTIL ADVISED OTHERWISE
TRUE
++All units upon hearing a “MAYDAY” or “URGENT” transmission and/or the Emergency Alert Tone shall cease radio transmissions until advised otherwise.++
E302 HAS RESPONDED TO AN EMERGENCY AT A PRIVATE DWELLING HOUSE IN WHICH THE OFFICER SUSPECTS TO BE AN ILLEGAL DRUG FACTORY. WHO SHOULD THE LT. NOTIFY?
- HAZMAT
- NYPD
- BUREAU OF HEALTH
++HAZMAT 2++
Reference 1
When responding to alarms, look for signs (mentioned above) of an illegal drug factory. Typical incidents involve hazardous materials. Approach with caution and request the response of the Haz-Mat Unit. Use of masks, full firefighting clothing and distance is imperative when fighting a fire in a known illegal factory. Avoid handling products and equipment since many are known to be poisonous and all are considered evidence. Notify the Police Department and the Department of Health. Be aware that the chemicals and runoff water may be contaminated. Take proper steps to reduce the contamination that may be caused by this runoff.
AT PRIVATE DWELLING FIRES WHAT MAY BE AN INDICATION OF A CONCRETE OR GYPSUM FLOOR POURED OVER CORRUGATED STEEL (Q-DECKING) SUPPORTED BY C-JOISTS?
•HEAVY FIRE & SMOKE CONDITION ON FLOOR OR IN CELLAR ACCOMPANIED BY LITTLE OR NO SMOKE IN FLOOR OR FLOORS ABOVE
++A heavy fire and smoke condition on a floor or in the cellar accompanied by little or no smoke condition on the floor or floors above may be an indication of a concrete or gypsum floor poured over corrugated steel (Q-decking) supported by C-Joists.++
AT A WIND DRIVEN FIRE (DOOR LEFT OPEN OR DOOR CLOSED BUT WINDOW FAILURE HAS OCCURRED) PRIOR TO THE ENGINE COMPANY’S ENTERING THE FIRE APARTMENT THE ENGINE COMPANY OFFICER MUST CONTACT THE ROOF FF OR FF OPERATING IN THE APT ABOVE FOR 3 PIECES OF INFORMATION - WHAT SHOULD THE ECO REQUEST?
- DESCRIPTION OF FIRE APT
- LOCATION OF MAIN BODY OF FIRE
- MOST DIRECT ROUTE TO FIRE
UNITS RESPOND TO A 10-77 ON THE 27TH FLOOR - E267 IS ASSIGNED AS THE CFRD ENGINE & L125 IS ASSIGNED THE FAST TRUCK, WHERE SHOULD THESE COMPANIES REPORT INTO?
FIRE SECTOR
++The FAST Unit and CFR Engine shall be assigned to the Fire Sector when the fire is above the sixth floor. They can be staged on the floor below the fire floor, ready for rapid deployment. At lower floor fires (sixth floor or below), the position of the FAST Unit and the CFR Engine will be determined by the Incident Commander. The FAST Unit should carry a set of elevator keys.++
E205 IS THE BACK-UP FOR DECON SHOWER APPARATUS 4 (DSA) IN WHICH ENGINE 4 IS THE PRIMARY COMPANY. WHILE GOING OVER THE RIG, A MEMBER FROM E205 NOTICES MISSING PIECES OF EQUIPMENT AND BROKEN SHOWER HEADS, HE INFORMS YOU THE DETAILED OFFICER OF E205 FOR THE DAY. WHO SHOULD YOU REPORT THESE PROBLEMS TO?
ENGINE 4’S OFFICER ON DUTY
++HAZMAT 15++
5.4 OFFICERS OF BACK-UP COMPANIES DISCOVERING MECHANICAL PROBLEMS WITH THE DSA INCLUDING MISSING, LOST OR DEFECTIVE EQUIPMENT ARE RESPONSIBLE TO REPORT SUCH PROBLEMS TO THE OFFICER ON DUTY AT THE PRIMARY COMPANY TO WHICH THE APPARATUS IS ASSIGNED.
YOU ARE THE OFFICER OF ENGINE 4 (PRIMARY DECON SHOWER APPARATUS UNIT) AND HAVE RESPONDED TO A DECON EMERGENCY WITH THE SHOWER APPARATUS. AN NYPD PATROL OFFICER HAS JUST APPROACHED YOU AND IS ASKING TO INTERVIEW VICTIMS OF THE INCIDENT. TO WHERE SHOULD YOU DIRECT THIS OFFICER?
CASUALTY COLLECTION POINT (CCP)
++HAZMAT 15++
4.15 CRIME SCENE PROCEDURES MAY NEED TO BE FOLLOWED. NYPD MAY ASSIGN A PATROL OFFICER TO TAKE STATEMENTS OF DECONTAMINATED PATIENTS. DIRECT THE PATROL OFFICER TO THE CCP.
IF A COMPANY OFFICER’S PSS IS IN NEED OF REPLACEMENT, WHAT IS THE STATUS OF THE UNIT?
O.O.S.
WHAT IS THE PROPER TEN CODE FOR A USPS BDS ACTIVATION?
10-80 FOR A CONFIRMED BDS ACTIVATION
UNITS RESPONDING INTO A 2ND ALARM FOR A CONFIRMED USPS BDS ACTIVATION ARE TO PROCEED TO WHERE?
PRE-DESIGNATED FIRE DEPARTMENT STAGING AREA
STEAM PRESSURES IN GENERATING PLANTS CAN BE AS HIGH AS ____ PSI WITH TEMPERATURES REACHING _____ DEGREES F.
2,000 PSI
900 DEGREES F
AT A USPS BDS ALARM WHICH UNIT CONDUCTS THE PRIMARY AND SECONDARY SEARCHES?
USPS WILL CONDUCT THE PRIMARY AND SECONDARY SEARCHES. FDNY UNITS WILL ENTER ONLY FOR IMMEDIATE LIFE SAFETY CONCERNS
WHAT DOES THE USPS REFER TO AS THE SAFE REFUGE AREA?
IN-PLANT REFUGE
YOU MUST LEAVE THE AREA IMMEDIATELY UPON FEELING ANY PAIN OR DISCOMFORT THROUGH THE HOOD, UNLESS _________________.
UNLESS THE AREA CAN BE IMMEDIATELY COOLED BY A HOSE LINE.
WHAT IS THE GREATEST HAZARD TO CIVILIANS AND FIREFIGHTERS IN REGARDS TO TRANSFORMER VAULTS?
ELECTRICITY
EACH PPE
E - ELECTRICITY A - ASBESTOS C - CO H - HIGH VAPOR PRESSURES P - PCB'S P - PVC E - EXPLOSIONS
UNITS RESPOND TO A BUILDING FIRE ON THE 101ST FLOOR, YOU WOULD KNOW ACCORDING TO THE NEW FDNY STANDPIPE PRESSURE CHART, YOU NEED TO SUPPLY THE BUILDING WITH _____ PSI, THUS A _____ PUMPER IS NEEDED.
650 PSI (101ST FLOOR STARTS 650 PSI)
3RD STAGE PUMPER (PRESSURES OVER 600 PSI REQUIRE 3RD STAGE)
WHAT SIZE HOLE SHOULD BE CUT IN THE CEILING IN ORDER FOR THE COCKLOFT NOZZLE TO FIT?
3X3
WHAT IS THE “AIR BILL” AND WHERE IS IT KEPT?
SHIPPING PAPERS FOR AIRCRAFTS
KEPT BY THE PILOT
WHERE DO ALL UNITS KEEP THEIR POSTASSIUM IODIDE TABLE STOCK?
GLOVEBOX OF THE APPARATUS
WHO DO YOU NOTIFY TO GET A REPLACEMENT FAST PAK?
BATTALION
AT A VACANT, WHERE ARE THE PRIMARY MARKINGS MADE ON THE BUILDING?
ALONGSIDE THE FRONT ENTRANCE
HOW OFTEN DOES THE BEACON SOUND ON A HT AFTER THE EMERGENCY ALERT BUTTON HAS BEEN DEPRESSED?
EVERY 4 SECONDS
WHAT IS THE PRIORITY ORDER OF VICTIMS DURING UNDER RIVER RAIL EMERGENCIES?
Triage duties within under river tubes will probably be performed by Rescue Paramedics and/or CFR trained firefighters.
Victims should be removed in the following order:
1.Ambulatory Victims Evacuate passengers who have walked from the incident to the emergency exit.
2.Non-Ambulatory Victims
• Red Tag (Immediate Transport)
• Yellow Tag (Delayed Transport)
3.Victims Requiring Disentanglement/Extrication
• Red Tag (Immediate Transport)
• Yellow Tag (Delayed Transport)
4.Black Tag (deceased victims)
WHAT UNITS CARRY DISPOSABLE BODY BAGS?
ALL EMS COMMAND AMBULANCES
CONDITIONS CARS
LSU AND MERV
DEPUTY CHIEFS
A LIST OF ALL CFR CERTIFIED MEMBERS, ALONG WITH THEIR CERTIFICATION EXPIRATION DATE AND THE RE-CERTIFICATION CLASS DATES WHEN SCHEDULED SHALL BE MAINTAINED WHERE?
OFFICE RECORD JOURNAL
more places than this
TL OPERATIONS ARE SOMETIMES PERFORMED ON SLOPES. A 4% SLOPE IS CONSIDERED LEVEL GROUND FOR A TL, WHILE A 15% SLOPE IS THE MAXIMUM SLOPE FOR A TOWER LADDER. IF POSSIBLE POSITION THE APPARATUS PARALLEL TO THE DIRECTION OF THE SLOPE SO THAT BOOM OPERATIONS WILL BE IN THIS DIRECTION?
“UP-HILL” DIRECTION
-RIG FACES DOWNHILL TURNTABLE ABOVE CAB
++LADDERS 6++
3.4.1 Position apparatus parallel to the direction of slope so that boom operations will be in the “up-hill” direction. If possible, apparatus should be facing “down-hill”, e.g., if facing downhill, turntable past the objective. If facing uphill, turntable before objective.
WHEN PLACING A TOWER LADDER BASKET TO A WINDOW LEDGE TO EFFECT A NORMAL RESCUE, WHAT IS THE POSITION OF THE BASKET?
-MIDDLE RAILING OF BASKET LEVEL WITH WINDOW LEDGE OR LEVEL WITH THE TOP RAILING OF THE FIRE ESCAPE
++LADDERS 6++
5.1.2 Rescue via basket is effectuated in several ways. Entering and exiting from basket shall be through the double-acting swinging gates. Initially the basket is elevated to a point where the middle railing of basket is level with the window ledge, or level with the top railing of the fire escape.
A. Middle basket railing positioning permits placement of basket flooring at a level where a person can easily step onto it without the usual straddling of window sills or fire escape railings.
B. To facilitate removal of incapacitated or obese victims, position the top basket rail level with the window sill or top rail of fire escape.
WHEN EFFECTING A RESCUE OF AN OBESE OR INCAPACITATED VICTIM TO A TOWER LADDER BASKET, WHAT IS THE CORRECT POSITIONING OF THE BASKET
-TOP OF THE BASKET RAIL LEVEL WITH THE WINDOW SILL OR TOP RAIL OF THE FIRE ESCAPE
++LADDERS 6++
5.1.2 Rescue via basket is effectuated in several ways. Entering and exiting from basket shall be through the double-acting swinging gates. Initially the basket is elevated to a point where the middle railing of basket is level with the window ledge, or level with the top railing of the fire escape.
A. Middle basket railing positioning permits placement of basket flooring at a level where a person can easily step onto it without the usual straddling of window sills or fire escape railings.
B. To facilitate removal of incapacitated or obese victims, position the top basket rail level with the window sill or top rail of fire escape.
AT A OLT/NLT FIRE WHAT WOULD BE AN INDICATION OF FIRE IN AN OPEN SHAFT?
•RAPID RISING COLUMN OF SMOKE WITH PARTICLES OR EMBERS ASCENDING TO HIGHER LEVELS VISIBLE OVER THE ROOF TOP OF THE BUILDING
LADDERS 3
5.4.3 A rapidly rising column of smoke, with particles or embers ascending to higher levels, visible over the roof top of the building frequently is an indication that the fire is in an open shaft.
AT AN OLT/NLT WHAT MIGHT LARGE QUANTITIES OF BLACK SMOKE OBSERVED OVER THE ROOF INDICATE?
•FIRE AT OR NEAR TOP OF BUILDING, TOP FLOOR FIRE, COCKLOFT FIRE, STAIR OR BULKHEAD FIRE OR A FIRE ON THE ROOF
LADDERS 3
5.4.3 Large quantities of black smoke (burning tar) observed over the roof may be an indication of fire at or near the top of the building, namely, top floor fire, cockloft fire, stair bulkhead fire or a fire on the roof