Lighterage Systems Flashcards

1
Q

INLS

A

Improved Navy Lighterage System

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What are the seven INLS Modules?

A
  1. WT- Warping Tug
  2. PM- Power Module
  3. BM- Beach Module
  4. IM- Intermediate Module
  5. DM- Docking Module
  6. RM- Ramp Module
  7. CM- Combination Module
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

What are the characteristics of the WT?

A
  • Operation in SS4. Survivable in SS5
  • Crew 7 (Craftmaster, Deck Sup, EN, Electrician, Rigger, 2x Deckhands)
  • 88’L X 24’W
  • 1,560 gal max fuel
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

What are the characteristics of the CF?

A
  • Operating SS3. Survivable SS4.
  • Crew 8 (Craftmaster, Deck Sup, ENx2, Electrician, Rigger, 2x Deckhands)
  • 246’L X 24’W
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

What is the CF used for?

A
  • Receiving
  • Transferring
  • Discharging cargo from ships anchored in-stream.
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

What are the characteristics of the PM?

A
  • 87.5’L X 24’W
  • Cargo: 62 LT
  • 1,560 gal max fuel
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

What are the configurations of the CF?

A

Causeway Ferry

  • PM/BM (1+1)
  • PM/IM/BM (1+2)- 284 Long Tons capacity
  • PM/IM/IM/BM (1+3)- 345 LT
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

What are the characteristics of the BM?

A
  • 80’L X 24’W
  • Cargo: 51 LT
  • 850 gal max fuel
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

What are the characteristics of the IM?

A
  • 80’L X 24’W
  • Cargo: 130 LT
  • Fore and Aft Flexors
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

What are the characteristics of the CM?

A
  • 80’L X 24’W
  • Cargo: 128 LT
  • 4 side connectors on each side
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

What are the characteristics of the RM?

A
  • Ramp transitions from 7 degrees to 10 degrees
  • 3 rhino horn receivers
  • 80’L X 24’W
  • Cargo: 137 LT
  • 4 side connectors on each side
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

What are the characteristics of the DM?

A
  • Roadway slope of 7 degrees
  • SS 2 for transfer of vehicles
  • 80’L X 24’W
  • Cargo: 129 LT
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

What is the WT used for?

A
  • Platform assembly/disassembly
  • Installation
  • Anchor deployment/retrieval
  • Salvage
  • Relocation
  • Station keeping
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

How many INLS Modules are in the ACB-1 TOA?

A
  1. WT- Warping Tug (4)
  2. PM- Power Module (4)
  3. BM- Beach Module (4)
  4. IM- Intermediate Module (8)
  5. DM- Docking Module (1)
  6. RM- Ramp Module (3)
  7. CM- Combination Module (11)

35 Total

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

How fast can the CF go?

A

10 knots empty for approximately 16hrs.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

MPFUB

A

Maritime Pre-position Force Utility Boat

17
Q

What are the characteristics of the MPFUB?

A
  • Crew: 5 (Coxswain, EN, Gunner/Crewman x3)
  • 44’L X 14.5’W
  • 600 gal max fuel
  • 41 knots max speed
  • 10,000lb or 32 personnel capacity
  • Weapons: M2, M19, and M240B
18
Q

What is the role of the MPFUB?

A
  • Personnel transportation (up to 32 including crew)
  • Medical Evacuation
  • Limited force protection
  • Support salvage
  • Damage Control
  • Maintenance/repair operations
19
Q

LCM-8

A

Landing Craft, Mechanized

- No longer operated by ACU-1

20
Q

LARC-V

A

Lighter, Amphibious Resupply, Cargo, 5-ton

21
Q

What are the characteristics of the LARC-V?

A
  • Crew: 3 (Commander, EN, Crewman)
  • 35’L X 10’W
  • 144 gal max fuel
  • Cargo: 10,000lbs on land and 4,000lbs at sea
  • 2 per MPF
22
Q

What is the role of the LARC-V?

A

Only craft operated by BMU.

  • Surf zone salvage
  • Recovery
  • De-watering
  • Medical evacuation
  • C2 roles
  • Ramp Check
23
Q

LCU 1610 and 2000

A

Landing Craft, Utility

- Cargo: 180LT or 32 PAX

24
Q

What is the ACB-1 mission?

A

To provide logistics-over-the-shore support to COMPACFLT amphibious forces and MPF operations including ship-to-shore transportation of combat cargo, bulk fuel/water, and tactical camp operations.