AUC 351 Solar Panels Flashcards

0
Q

Can PV Systems produce electricity on cloudy days

A

Yes but not as much as on sunny

Not at night though

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
1
Q

What is the greatest hazard with solar photovoltaic systems

A

Direct Current (DC) shock

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Stand mounted roof installation

A

Known as universal mounting

Affixed directly to roof joists

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Flush mounted roof installations.

A

Serval inches off roof

Usually on peaked roofs

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Integrated design

A

Serve as structural elements
Reduces concentrations of added weight and avoids penetrations required for mountings and wiring
It reduces vulnerability of equipment to wind

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Firefighters if necessary may cut wiring after power confirmed off

A

No never

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Shutting power

A

Shutting power at main Electrical panel does not ensure power to the building has Been removed
Holds true for PV disconnect
Use of roof top disconnects should not be relied upon
Shut off at inverter to ensure power does not entry the building from PV array , battery
backup or back up generator
Inverters have capacitors that store energy ( will discharge shortly after power to inverter is cut)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

What is the prime focus for ladder company operations with solar array

A

Opening/ removal of sky lights and scuttles as well as horizontal ventilation

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

Firefighters discovering PV arrays on roof of building should Notify whom

A

Company officer and IC for subsequent relay to all operating units

If array involved in fire or will negatively effect ops notify IC

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

IC should delay overhauling until when

A

Confirmation of power off

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Who can decide to use water on PV system

A

Only IC

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

If using water on energized PV components it is recommended to use

A

Fog stream at 30 degrees from distance

Straight stream or foam should not be used

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

Flush mounted arrays may be subject to what loads

A

Uplift and down-force wind loads

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

Incipient fires may be extinguished with

A

Class C DRY CHEMICAL

How well did you know this?
1
Not at all
2
3
4
5
Perfectly