AUC 349 Smoke Control Using PPF Flashcards
When using the PPF s at a high rise fire what should be given first consideration for pressurization
The attack stairwell is the first consideration as ordered by IC
What tools Ventiation support group report to ICP WITH?
Two 27 inch PPF with exhaust hoses Eye and ear protection Dave Clark headset HT CO monitor Elevator keys Halligen and Heavy axe Door chocks Hand lights SCBA and full PPE
Proper placement of PPFS IS based on what factors
- Number of PPFS
- Personnel available
3 location of fire
4 number floors in building
5 stage of FF ops
What should be done if negative results are encountered when using PPFS
- Discontinue pressurization by throttling down fans to idle
- Close doors to the stairwell that fan is pressuring
- Notify IC when fans are deactivated and doors secured
What is the priority use for PPFS
- Pressurization of attack stair to support fire attack by controlling smoke condition at attack stair doorway and throughout the attack stairway
- pressurizing the evacuation stairwell for smoke and CO control
- Ventilating the public hallways for smoke and CO CONTROL
What is the optimum placement of the PPF
- 4-6 from attack stairway door on the ground floor directly facing the door to the stairwell angle tilt of 80 degrees
True or false you should place the fan in the stairwell thAt you are trying to pressurize?
False. Fan should placed to blow fresh air into the stairwell
The pressurization of attack stair will allow up to how many doors to be open and still be effective.?
Up to 3 doors and will still remain effective
Members cannot move from one area to another in stairwell…true or false
False: members may move from one area to another as long as remember to close the stairway doors behind them
Who is responsible for maintaining a proper stairwell seal
All members on the fire ground
Who verifies that stairway doors are closed above The fire floor?
The vent support superviser will request that the IC instruct 3&4 due ladder companies verify
Who surveys the floors below fire floor of attack stairway to verify doors are in closed
Position
Vent support supervisor instructs vent group members to survey floors below fire floor
Depending on conditions one fan can pressurize up how many stories ?
10 stories
Two fans will pressurize
40 story building when properlypostioned
If a additional fan is needed a second fan should be placed where ?
3 floors below the fire floor