Adminstrative responsibilities for cell phone cites

A
  1. Notify battalion, division and all first alarm units by telephone them follow up by written memo
  2. Adminstrative company does on site inspection and evaluate the cell site
    3 administrative company do CIDS and forward to battalion FP coordinator
    Comply with FP INSPECTION BULLETIN IF NECESSARY
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
1
Q

Antennas on cell phone towers may not extend higher than

A

6 feet above the height of the roof or parapet on the roof

6 feet above any penthouse or bulkhead if placed on penthouse or bulkhead

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

When making cids card for cell phone cites administrative co should include what info on cids

A
  1. Location of cell site room
  2. Backup power supply locations
  3. Shut offs
  4. Emergency telephone number of cell phone company
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Four major components of cell phone cites

A
  1. Base station . Computer that process the radio signals
  2. Primary electrical power for cell sites btwn 50 and 200 amps AC
    Will be separate from building service . Secondary will consist of batteries, diesel generator or natural gas generator or combo battery generator
  3. Coaxial cable is radio frequency cable carries 3-4 watts of current
  4. Multiple transmitting receiving antennas on upper portion of roof
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Two. Type of installations , roof mounted and interior

A

Roof mounted - base station found in an am equipment closet or separate room
Usually in addition to existing structure
Usually installed on I beams

Interior .. Usually in cellar or basement and may be found on any floor

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

If the cell site installation is involved in fire transmit

A

Extra engine and truck

Insure TL response on initial alarm

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

If a building does not permit for an installation of a cell phone site than you should

A

High priority A8

Request battalion response

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Color coding of conduit and piping installations on roof

A

RED - High Voltage Wire
ORANGE -Low voltage wiring
YELLOW - natural gas piping

Other gas piping - yellow labeled at regular intervals with type of gas
Yellow with black stripes- Fuel oil piping

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

How shall transmitter antennas be ID on roof

A

Affixing to antenna the antenna mounting or conspicuous location near antenna continuos durable and weatherproof reflective or luminescent markings and 3 inch lettering that reads “TRANSMITTER”

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

A 24 hour/7 day a week telephone number by which owner of installation can be ID SHALL be posted

A

Conspicuously on or near any equipment closet or base station or similar telecommunications antenna installation

Name of owner
Number of owner
ID STATION BY NUMBER or other unique design

How well did you know this?