Auc 200 Winter Ops Flashcards
Company Commanders shall begin requisitioning supplies and equipment for winter ops on what date ?
July 1
Company commanders shall keep a minimum of how many shovels in quarters for snow clearance in front of quarters ?
6 shovels
During periods of cold weather tower ladders deck pipes multiversals manifolds and pumps should be drained at what time ?
After use and following roll calls
What is considered sub-freezing weather conditions ?
- Degrees or less for a 24 hour period
Units encountering a frozen hydrant not in there Adminstrative district will do the following ?
Place a yellow disc on hydrant and promptly notify the officer of the Adminstrative company
Operational phase of snow emergency is divided into phase. A and phase B, when should phase A be instituted?
Phase A shall be instituted when weather forecasters predict a severe storm approaching NYC and will initiate the institution of certain Pre-planned preliminary activities in preparation for the emergency conditions
Phase B of snow emergency procedures shall be instituted?
When actual emergency conditions are reached or imminent and necessary Pre-planned special activities are determined necessary
The following equipment shall be assembled and placed on company apparatus when snow or ice emergency is imminent of Phase A or B established?
At least 6 extra lengths of 2 1/2 hose rolled or folded on each engine and ladder apparatus , 2 shovels , containers of salt and or sand, vehicle recovery strap with shackle , tire chains spare links and link tool, specialized hydrant connection set up as determined by individual commanding officers
What shall be used for control and recording of snow emergency activity when clearing hydrants?
Hydrant inspection cards
When building is higher than 3 stories that is 4 and up who is given preference in entering block first?
Ladder company apparatus
When does the engine company have preference in entering the block first during winter ops?
3 stories of less and ladder company will carry portables into the block
In interest in getting fast water on fire during winter ops you may
Directly hook up to hydrant with line but two way gate shall be used
Drills and training schedules concerning winter operations shall be initiated during the month of
October each year
Items on requisition not received by _______shall be called to the attention of division coordinators
October 1st
Division and battalion coordinators shall intimate the activities of AUC 200 on
October 1 st except where specifically noted to continue for the duration of the winter season