AUC 149 Buckeye Pipeline Flashcards

0
Q

What is the max pressure I’m main line ?

A

1200 psig

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
1
Q

The basic components of the buckeye pipeline are …

A

2, 12 inch steel pipes

One carries gasoline and one carries kerosene based aviation fuel

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What is max service pressure on the delivery lines to shippers and on terminal piping ?

A

200 psig

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Automatic valves normally require action by FD Personnel?

A

Normally no action is f

Required

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

What automatically limits pressure buildup to 1200 psig in main line ?

A

Control valves

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

If the control valves fail what will shut down the pumps ?

A

Pressure switches

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

If both control valves and pressure switches fail what will happen?

A

Relief valves will relieve excess pressure

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

When pressure in delivery lines is in excess due to rise in product temp the pressure is relieved by

A

Thermal relief valves

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

There are how many Manual wrenches issued to units?mi

A

3 wrenches

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Which manual wrench opens the hinged cover of the valve only

A

The short tee wrench

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

What color is the 3 and one half food long wrench ?

A

Yellow

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

The 3 1/2 foot long wrench is used for ?

A

Insertion into the valve box to mate with square male fitting on valve ?

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

The 3 1/2 foot wrench has what type of fitting on the end ?

A

Female

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

How many turns does it take to shut a manual valve off on pipeline?

A

42 full turns and 84 half turns clockwise

Exception : valves on shippers lines extending from LI city.. 24 full and 48 half clockwise turns

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

The cover to the manual shut off valves us opened with what tool(s) and how ?

A

The short tee wrench or handle of combo wrench is inserted into latching device and making a quarter turn left or right

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

Manual shut off valves are generally located ?

A

Below ground in valve housing under a hinged cover

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

The buckeye pipeline is divided into how many sections

A

13 sectiions

Section is further subdivided in 5 subsections

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
17
Q

What dummy boxes are the sections of the buckeye pipeline

A

9000 boxes

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
18
Q

If a pipeline profile card is missing from thd valve box you must report this too?

A

Bucleye pipeline coordinator at DIVISION 8.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
19
Q

Pipeline profile cards showing the elevation of valves above sea level and the amount of product cargoes in barrels btwn each valve are issued too

A

Assigned and alternate units

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
20
Q

Pipeline profile cards will placed where for the information of responding units ?

A

In each valve box

Note: each laminated card should be returned to valve box

21
Q

What are the 3 places elevated graph profile cards will be located ?

A
  1. I’m each valve box..
    2 . Paper graphs for use in quarters given to assigned and alternate units
    3.buckeye pipeline ops manual

Note: pipeline and shippers iTunes profile cards can be found in BUCKEYE pipeline ops manual issued to assigned and alternate units

22
Q

How many lines does each Unit Alarm Assignment Card have

23
Q

Units on the first line of the UAA Card are designated?

A

Assigned units except for those under the caption Special Units

24
The second line on UAA card is for
Special unit assignment that cannot fit on first line
25
Units on the 3rd 4th and 5 th lines. Of the UAA card are designated ?
Alternate units
26
Each assigned and alternate unit is issued how many sets of unit alarm assignment and instruction cards ?
Two sets
27
Where are the unit alarm and instruction cards kept ?
One set is carried on apparatus and the other set shall be placed in prominent clearly marked and protected place at house watch desk for use by relocated units
28
When not specially assigned on a 9000 box as an alternate for a particular company the officer shall ?
Ascertain from dispatcher for which company for his company is alternate This is necessary to determine the units duties as specfied on the UAAC and related instruction cards
29
Units designated as alternate units can only be designated as a alternate for one unit .. Yes or no
No they can be an alternate for more than one unit
30
Extra set of wrenches for the pipeljne shall be placed where ?
They shall be hung on a wall near thd house watch desk or other prominent location easily visible and clearly marked For relocated companies or units not so equipped which are directed to respond to 9000 series box
31
What is on the reverse side of the UAAC
Diagram of the pertinent section of the pipeline
32
Isolation valves of the buckeye pipeline shall always be closed as per instruction cards except
When unit is required to protect life in a serious life threatening situation and thereby preventing from carrying out isolation duties Officer must immediately notify dispatcher of above
33
When unit is assigned to manually shut valve and patrol to adjacent valve(s) they should shut valve first then patrol
False simultaneously
34
Units performing isolation duties should announce 10-84 when arrive at
Valve locations Also inform dispatcher of valve closures as well as completion of patrol duties When complete above duties report to command post or as directed by IC
35
Department vehicles should not be brought closer then _____ feet to a leak
600'
36
When operating adjacent to railroad tracks on the buckeye pipeline flag persons must be positioned at least ______ feet on each side of unit
1000' In Brooklyn there will be no contact with train dispatcher In queens use both flag persons and train dispatcher
37
Upon confirmation of a leak at buckeye pipeline | What should be transmitted to dispatcher
Second alarm
38
Foot patrols of buckeye pipeline are conducted by
Two ht equipped members
39
If an officer determines that duties of shutting down valves and or patrol duties cannot be accomplished then officer must
Request response of another unit directly through the dispatcher or notify IC
40
Units other than those designated to isolation duties will respond too
Command post
41
If ignition of product occurs before arrival of first FD units the duties of the UAC and instructional cards shall be stopped and passed on to incoming units
No isolation of valves is still of primary importance Additional alarms transmitted immediately Except life
42
You can only manually reopen valves in what circumstances
Only by buckeye personnel When fire or emergency over When directed by IC Or to locate leak upon direction of IC
43
Potential for explosion is greatest on what type of days with respect to weather
Hot humid and calm days
44
If attempting to wash burning gasoline or aviation fuel aside
Use a solid stream hose held horizontally a few inches above the ground and moved rapidly from side to side
45
Company commanders having pipeline control valves have them inspected when
Semi annual hydrant inspection Also familiarization drills Valve pits subject to flooding must be inspected during subfreezing weather May use hydrant record cards for use of above inspections
46
If during inspection all duties of control valves you come across needed repairs you should
Prepare a letterhead report to buckeye pipeline coordinator at division 8 Reports of critical nature by telephone Flooded pits immediate phone notification to above
47
When drilling for buckeye pipeline which will be the only drills that valves will be actually shut down
Borough drills
48
When leak location is ID what info should be relayed to dispatcher
Location of leak Estimate of amount of product in street Topography Exposures
49
What is the primary consideration of the first alarm units responding to a second alarm for pipeline leak ?
Evacuation of area involved Aves of escape must remain open for civilians and FD personnel