1.1 IMMEDIATE ACTIONS
CCR 1.1.1 - NOTIFY Fire Department at extension 4444 that Light HDS Unit has a Tube Rupture and Fire, and provide name, unit, and location of fire, and ENSURE information is understood before hanging up.
CCR 1.1.2 - NOTIFY the following of Tube Rupture at 637 HDS Unit:
*Supervisor
*FCCU Console Operator
*BBC Console Operator
*Lube Utilities Console Operator
*SRC Console Operator
CCR 1.1.3 - NOTIFY FCCU to line up C6 Splitter tower to off test tank.
1.1.4 - DISCONTINUE feed to 637 Unit as follows:
CCR A. NOTIFY FCCU to divert #1 and #2 Debutanizer bottoms away from 637 HDS.
Oper B. DIVERT 534 Depentanizer Light Coker Naphtha feed stream away from 637 HDS.
CCR C. NOTIFY BBC Console to divert 734 Depent Bottoms stream away from 637 HDS.
CCR D. NOTIFY BBC Console to divert #2 Deprop Bottoms feed stream away from 637 HDS.
Oper E. WHEN feed streams are diverted from unit, CLOSE 12” inlet block valve to 637D0001, Feed Surge Drum.
CCR F. PLACE 67FC1152, Heavy Py Feed in “MANUAL” and close.
CCR 1.1.5 - PUSH one of the following pushbuttons to initiate HDS Section Emergency Depressurizing System:
*HDS Section Emergency Depressurizing DCS Soft Switch (HS5023B) on console
*HDS Section Emergency Depressurizing Local Mounted Switch (HS5023A) at grade 30 Ft South of Compressor Lube Oil Vat of 3rd deck of Product Seperator structure
CCR/Oper 1.1.5 - ENSURE shutdown isolation valves and alarms on Emergency Depressurizing Sysem are in the following positions:
*Depressurizing Vavle (XV5023), is OPEN
*Depressurizing Alarm (XA5023), is ACTIVE
*Rx Charge Pumps (637P0001A/B), are DOWN
*Splitter Bottoms Pumps (P0019A/B) is down
*HDS Feed Pumps (P0018A/B) Feed Pumps is down
*Fuel Gas Isolation Valves (XV5003 and XV5004), are CLOSED
*Fuel Gas Trip Alarm (XA5014A/B), is ACTIVE
*Makeup Hydrogen Isolation Valve (XV5024) is CLOSED
*Recycle Gas Compressor (637C0001), is DOWN
*Recycle Gas Compressor trip alarm (XA5062A/B), is ACTIVE
*Wash Water Circulation Pumps (637P0003A/B) are DOWN
*Recycle Hydrogen to SHU Guard Rx (R4) and Diolefin Saturator (R1), Chopper valve (XV5271) closed
*HP Stream to SHU Preheater Chopper valve (XV5259) is closed
*Splitter Bottoms Release to HDS Section Chopper valve (XV5237) is closed
*Steam to Splitter Reboiler Chopper valve (XV5225) is closed
*HDS Feed to Rx Section Chopper valve (XV5255) is closed
CCR 1.1.7 - NITROGEN PURGE 67F0001, Mercaptan Rx Feed Preheater, by performing the following:
CCR A. PLACE 67HS5002B, Nitrogen Purge OPEN/CLOSE Switch, in the “OPEN” position.
CCR/Oper B. VERIFY 67XV5002, Nitrogen Purge Valve, opens.
CCR/Oper C. PURGE heater until all hydrocarbons have been removed.
1.2 SUPPLEMENTAL ACTIONS
CCR/Oper *Manage Stabilizer Tower temperature.
THIS IS THE END OF THE PROCEDURE