1.1 IMMEDIATE ACTIONS

Oper 1.1.1 - DIVERT 632 Coker Naphtha to 815 Tank.

A

Oper 1.1.2 - CLOSE in the inlet vlaves to the Feed Filters to stop feed coming into 585TK.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

1.1.3 - IF both 632C0001A/B, Feed Hydrogen and Recycle Compressors are available PERFORM the following:

A

CCR A. PLACE 62PC0302, Unit Pressure Controller in “AUTO” and set at 200 psig.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Oper B. WHEN the unit pressure drops to the Makeup Hydrogen Line pressure, OPEN the 2-inch Makeup Hydrogen to Recycle Compressor discharge line.

A

Oper C. ALIGN 62PC0302B, Purge to Fuels Header.

Oper D. ISOLATE 62PC0302A, Purge to Plant Hydrogen Header.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

CCR/Oper 1.1.4 - REMOVE 632F0001, Rx Heater from service.

A

CCR/Oper 1.1.5 - 632F0002, Light Ends Fractionator Reboiler Heater from service.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Oper 1.1.6 - REMOVE 632P0001A/B, Fresh Feed Pumps from service.

A

CCR/Oper 1.1.7 - CLOSE 62FC0100, Fresh Feed Flow Controller and outside isolation valves.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

CCR/Oper 1.1.8 - WHEN 632D0001, Hot Flash Drum level falls to 10% as indicated by 62LC0201, Hot Flash Drum Level Controller, ISOLATE 62LV0201 Hot Flash Drum level control valve.

A

CCR/Oper 1.1.9 - WHEN 632D0002 Cold Flash Drum level falls to 10% as indicated by 62LC0206, Cold Flash Drum Hydrocarbon Level Controller, ISOLATE 62LV0206 Cold Flash Drum Hydrocarbon level control valve.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Oper 1.1.10 - REMOVE 632P0002A/B, Water Injection Pumps from service.

A

CCR/Oper 1.1.11 - WHEN Cold Flash Drum level falls to 10% as indicated by 62LC0205, Cold Flash Drum Sour Water Level Controller, ISOLATE 62LV0205 Cold Flash Drum level control valve.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

CCR/Oper 1.1.12 - WHEN 632T0001, Light Ends Fractionator level falls to 10% as indicated by 62LC0220, Light Ends Fractionator Level Controller, SHUTDOWN 632P0004A/B, Light Ends Fractionator Reboiler Pumps.

A

Oper 1.1.13 - REMOVE Light Ends Fractionator Level Control valve (62FV0114) from service by closing outside isolation valves.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

CCR/Oper 1.1.14 - WHEN level in 632D0003, LEF Overhead Accumulator falls to 10% as indicated by 62LC0221, LEF Overhead Accumulator Level Controller, SHUTDOWN 632P0003A/B, Light Ends Fractionator Overhead Pumps.

A

Oper 1.1.15 - REMOVE 62LC0221, LEF Overhead Accumulator Level Control valve from service by closing outside isolation valves.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

1.2 SUPPLEMENTAL ACTIONS

1.2.1 - NOTIFY the following of an emergency shutdown:

*Shift Supervisor
*Coker Console Operator
*Intermediate Pumper
*Utilities Department
*BRU Console Operator

A

THIS IS THE END OF THE PROCEDURE