NAVEDTRA 15004B, LOGISTICS SPECIALIST TRAINING MANUAL CHAPTER 9 Flashcards

1
Q

What is the basic document and authority that governs the management of all aviation maintenance?

A

NAMP

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What provides O-level, I-level and Aviation Support Division (ASD) activities with a modern, real time and responsive computer based management information system?

A

NALCOMIS OIMA

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Assigned to each person what will determine his or her ability to access a specific NALCOMIS OIMA menu?

A

SMQ

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

The common goal of supply and maintenance organizations is to provide what?

A

Maximum weapons systems operational readiness

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Meetings are held at least how often or as required between supply and maintenance representatives?

A

Weekly

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Which programs control critical and costly repairable material used in support of aircraft maintenance?

A

Special material management

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

What has the Department of Defense (DoD) Comptroller approved financing of AVDLRs under?

A

Navy Capital Working Fund (NCWF)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

Which procedure uses supply action documents in support of maintenance?

A

Material reporting

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

What communication network allows output of the Aviation Maintenance and Material Management Systems to an external interface?

A

NALCOMIS OIMA

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Who is responsible to the Supply Officer for the performance of the center and acts as a direct liaison between the Aircraft Intermediate Maintenance Department (AIMD) Officer and the Supply Officer?

A

ASD/SSC Officer

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

An AWP status is provided how often to the AIMD on a mechanized listing and contains, as a minimum, the same information as the previous NMCS/PMCS status listing, except the BUNO is replaced with the work center? (

A

Weekly

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

What contains the existing repair capability data on items previously processed by the IMA?

A

Individual Component Repair List (ICRL)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

What is the single contact point where material control centers of O- and I-level maintenance activities place requirements for material and equipment required for support of weapons systems maintenance?

A

ASD/SSC

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

What is the single point of contact for processing customer requirements and providing follow-ups and status as required?

A

Supply Response Section (SRS)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

What SRS unit contains high-usage, maintenance-related consumable materials that have been expended from the Supply Department stock records and financial accounts?

A

Pre-Expended Bin (PEB)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

The quantity of each item pre-expended may not exceed an estimated how many-day supply, subject to the requirement that stock be replenished in-full package quantities?

17
Q

Stock records require a review how often to ensure that all items have sufficient usage for retention in the PEB?

18
Q

As a minimum, purge and return to the Supply Department any item that had no demand within the last how many months?

19
Q

What is responsible for managing repairables in the Local Repair Cycle Asset (LRCA) storage area and the repair cycle, including retrograde?

A

Component Control Section (CCS)

20
Q

The DCU ensures that customers turn-in defective components, listed in CRIPL, within how long after receipt of the replacement?

21
Q

Upon receipt of the processed MAF copy from DSF, DCU files and retains it for how long?

22
Q

in NALCOMIS OIMA activities, what maintains the induction log?

23
Q

What form should you use for submitting allowance change request?

A

NAVSUP Form 1375

24
Q

Repairable item fixed allowances are determined by monthly usage and what else?

A

Turnaround Time (TAT)

25
According to NAVSUP Publication 545, FLR must not be shipped via what method?
ATAC hub
26
What performs the packing and preservation of engines?
IMA
27
The Supply Department is responsible for processing material exhibits for investigation. These are items needed for an Engineering Investigation (EI) or Quality Deficiency Report (QDR). According to the NAMP, supply should hold material for how many days pending disposition instructions from the Cognizant Field Activity (CFA)?
30
28
The accuracy of AWP inventory requisition records and outstanding requisitions must be maintained through weekly reviews. A standard of no less than what percent accuracy is necessary for effective AWP management?
98
29
supply and maintenance personnel must review the AWP any time the number of AWP components on hand exceeds what percent of the average monthly IMA inductions?
15
30
What are responsible for the various data inputs, computing the on-board repair part and equipage requirements and publishing the applicable allowance lists designed to identify the material requirements of a ship, aircraft squadron, or shore activity? ?
Inventory Control Points (ICPs)
31
What specifies the range of shipboard material required for support of all installed and portable equipment and provides a list of equipage required for a ship to perform its operational mission?
Coordinated Shipboard Allowance List (COSAL)
32
What is a retail stock level comprised of a fixed allowance for DLRs and Field Level Repairables (FLRs) as well as consumables?
Operational Support Inventory (OSI)
33
What is submitted when the current allowance quantity does not appear to be sufficient to support the activity’s present and continuing mission?
ACR-F
34
The ICP should process ACR-Fs within how many working days from receipt or provide an interim message pending disposition?
15