COMNAVAIRINST 4790.2 CHAPTER 10 Flashcards

1
Q

What is the instruction for the Navy Uniform Source, Maintenance and Recoverability (SMR) Codes.

A

NAVSUPINST 4423.29

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What is the instruction for Assignment and Application of Uniform Source, Maintenance and Recoverability Codes.

A

NAVAIRINST 4423.12,

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

what is the primary reference for components processed through Aeronautical Material Screening Unit (AMSU) or Joint Aviation Screening Unit (JASU).

A

The ICRL

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

An IMA Component Repair Review and ICRL Validation shall be completed how often?

A

twice per year, during May and November,

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

The RFI comparison percentage default setting for the Improvement Opportunities Report is at what percentage for which may be changed by the user?

A

15%

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Submit SM&R Code Change Requests for items repaired with what SM&R Code?

A

PAOOO (Repair and Dispose of at the O-level),

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

SM&R Code Change Requests will be sent to who ?

A

TYCOM Aircraft or Equipment Class Desk

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

SM&R Codes shall not be changed in the ICRL until official notification is received from who?

A

NAVSUP WSS, NAVAIR, or the change is reflected in One Touch Support

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

BCM data shall be entered in a trend chart each month, covering a minimum of how many months?

A

24

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

The AIRSpeed Continuous Process Improvement (CPI) Team shall evaluate the accuracy of TRR and Buffers for components that entered EXREP status at any time during how many months?

A

6

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

Review at least how much percentage of the X1 CC (Repair Not Authorized) items listed on the ICRL during the May review and the remaining items during the November review?

A

50%

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

The X1 CC review may be broken into more frequent segments (monthly or quarterly) as long as how much percentage of X1 items are reviewed each year?

A

100%

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

what provides information on SM&R Code composition and specific information for Supply and Maintenance personnel?

A

NAVSUPINST 4423.29

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

What provides direction on submission SM&R Codes Change Request?

A

NAVAIRINST 4423.12

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

how many day prior should each T/M/S aircraft Cost Performance Index (CPI) review, conduct a review of the NAT and send each supporting IMA a list of potential productivity degraders

A

60

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

RFI rates of what or more lower than the highest performing IMA with a particular emphasis placed on the T/M/S Aircraft Top Degraders List?

17
Q

who is designated as the Component Repair Review and ICRL Validation Program Manager?

18
Q

who review the results of the Component Repair Review and ICRL Validation results and direct any changes deemed necessary to most effectively provide I-level support

19
Q

who Review SM&R Code Change Requests before submission to the TYCOM.

20
Q

ICRL CAPABILITY CODES C1?

A

Capable of Repair.

21
Q

ICRL CAPABILITY CODES C3?

A

Limited Repair.

22
Q

ICRL CAPABILITY CODES A1?

A

Check and Test Only.

23
Q

ICRL CAPABILITY CODES M1?

A

Assemble/Manufacture.

24
Q

ICRL CAPABILITY CODES R1?

A

Repair and Return to Originating Activity.

25
Q

ICRL CAPABILITY CODES X1?

A

Repair Not Authorized.

26
Q

ICRL CAPABILITY CODES X2?

A

Lack of Authorized Equipment/Tools/Facilities.

27
Q

ICRL CAPABILITY CODES X3?

A

Lack of Required Technical Skills.

28
Q

ICRL CAPABILITY CODES X6?

A

Lack of Technical Data.

29
Q

ICRL CAPABILITY CODES Z1?

A

Consumable Material.

30
Q

ICRL CAPABILITY CODES D1?

A

Full D-Level Capability.

31
Q

ICRL CAPABILITY CODES D3?

A

Partial D-Level Capability.