Mooring Equipment Flashcards
What markings (in tonnes) should be on all mooring fittings?
SWL (Safe working load) for mooring
TOW (Minimum towing load) for fittings designed for towing
What should the SWL of mooring fittings be?
Whichever is the highest of
- The intended maximum towing load (static bollard pull)
- Minimum breaking load of the mooring line
What is TOW?
Safe Towing load
What is the safe towing load?
80% of the design load of the fitting
Where can i find information about the vessel mooring and towing capability?
The ships towing and mooring arrangements plan
What must be included on the towing and mooring arrangements plan?
- Location on the ship
- Type of fitting
- SWL/TOW
- Purpose (Mooring/normal towing/other towing)
- Method of applying load/load angle at fitting
- Arrangement of mooring lines
- MBL of mooring lines
- Length of mooring lines
- Type and diameter of mooring lines
- Maximum environmental conditions for design loads
What are the three mooring line types used on a mooring arrangement?
- Breast line - perpendicular to the ship
- Spring line - parallel to the ship
- Head/Stern line - 45 degree angle to secure fore/aft and athwartships movement
What is the maximum beam wind speed for design load of moorings?
25 m/s between 2000m2 and 4000m2 windage area for passenger ships and car carriers and all other ships
21 m/s over 4000m2 windage area on passenger ships and car carriers
Where are the best places to find mooring guidance?
OCIMF Effective Mooring publication
Standard club and other P and I club best practise
COSWOP
What angle to the quay should mooring lines be kept at?
Spring lines - Max 10 degrees
Breast lines - Max 25 degrees
30 degrees = 87% efficiency
How should mooring loads be balanced ?
- Mooring lines at as close to horizontal as possible
- Mooring ropes of equal type and diameter used together
- Mooring lines as close to fore and aft line and perpendicular to ship as possible
4 Mooring lines as long as possible
(a 30m line will stretch twice as much as a 15m line so can absorb more force)
What should the mooring winch brake holding power be set at?
Between 60 and 80% of the MBL of the mooring line so that the winch renders before the line breaks.