KSQR-Design part 3 Flashcards
How do we identify that a piece of equipment has been tested?
Answer: The colored band on each piece of equipment must show inspection dates, serial number, test pressure and type of service
According to WS Std. 23, what are the 2 SLB approved manufacturers of treating iron?
Answer: FMC and SPM
How often must treating iron be tested?
Answer: Annually
According to WS Std. 23, what are the 3 SLB approved manufacturers for flexible high pressure hoses?
Answer: Coflex, Parker, Dayco
What is the maximum treating rate (BPM) through 2, 3 and 4” iron?
2 = 8.5 BPM
3 = 20 BPM
4 = 40 BPM
How is the maximum working pressure for a frac job determined?
Answer: The maximum pressure we can work with is the lowest rated piece of equipment, for example if we have all 10k pieces of equipment and a wellhead that is 5k, we can only go to 5k.
What must be placed on the ground in front of each truck during the job?
Answer: A fire extinguisher.
When determining equipment requirements for a job, how would you calculate hydraulic horsepower required? What criteria do you need to know?
Answer: Press (psi) x Rate (bpm) / 40.8
HHP Frac pump 2250, 80% 1800,
If a job is to be pumped on a well that has potential well control issues, which WS Safety Standard will allow you to assess the risk of the job and determine how to proceed?
Answer: Std. 28 – Pressure management operations