Iso Condenser Flashcards

1
Q

Why must IC be isolated if tube leak?

A

prevent untreated radiation release

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Why is only one IC Makeup pump run at a time?

A

Prevents cavitation due to common suction line

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

What happens to RPV level on IC initiation?

A

Level will rise 4-5inches

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Why is Contaminated Demin Water not desirable as IC make-up?

A

Causes possibility of uncontrolled release of radioactive materials to environment.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Why must ADS vlvs be closed if RPV level cannot be mantained above -50”?

A

to prevent ADS inititation

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

What indications are present on an IC tube leak?

A

Rise in vent rad levels
Rise in shell side temp
Rise in shell side level coincient w/ rising temp
Drop in Rx Level

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Why must 4399-74 vlv be opened before IC Makeup pump started?

A

minimizes water hammer

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

What are signs of IC Condensate Return Line Low?

A

extended time to condense steam to fill return piping.
excessive heating of shell side water (to point of steaming)
Temp lower in tube bundle as covered by condensate
May require makeup

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

How long must 2-1301-3 valve be held in “CLOSE” position after close indication? Why?

A

5 seconds to ensure full closure due to location of limit switches

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

What is the preferred order of RPV Pressure control?

A

IC with makeup from clean demin from IC makeup
IC with makeup from clean demin using clean demin pumps
HPCI in pressure control mode
IC with Fire water makeup via 2(3)-4102 (if Fire Water suppression NOT REQUIRED)
ADS System relief valves (w/ RPV level above -50)
IC w/ contaminated makeup

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

Why is IA used for IC operation?

A

1301-17 and 20 valves

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

Why must RBX floor drain Sump A be available to put IC in stanby?

A

Shell side drains there

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

Why must CST level be >90,000 prior to putting IC in standby?

A

To ensure that HPCI has adequate suction. Condensate transfer takes suction below standpipe

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

Why would shell side level rise with tube leak?

A

steam from leak enters shell side and heats it up. Density of water decreases and expands, causing level to go up. Also, steam leaving primary side will condense adding inventory

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

Why would tube side temp rise indiacte 1301-3 valve leakby?

A

tube side is normally a stagnant water column.

Leakby creates a pathway for flow travel allowing hot water/steam to travel through the system

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

Where does IC makeup take suction from?

A

Clean Demin Water Tank

17
Q

What is approx flowrate on shell side of IC?

A

~800gpm