Containment De-inerting Flashcards
What is normal Containment Vent pathway and what sample results are required?
RB Vent system:
Iodine 131 <7.2 E-9 uCi/cc
Beta/Gamma <7.9E-9 uCi/cc
What is pathway for Containment de-inert if higher than normal? what are limtis?
SBGT IF less than
I 131 < 3.5E-7 uCi/cc
Beta/Gamma <3.9E-6 uCi/cc
What are required actions if drywell/torus conditions change while venting containment?
Terminate venting and resample to verify conditions prior to restarting
Why should drywell pressure remain greater than or equal to torus pressure while venting?
To prevent cycling of torus to drywell vacuum breakers
Considered ESF actuation and potential 50.72 notification
What are potential hazards in 2/3 EDG room when inerting containment?
Potential oxygen deficient enviorment due to nitrogen flowpath. Atmosphere sampled every 15 min to prevent
During Post Accident conditions, where is containment vented to and what are limits?
Vented only to SBGT if less than:
I 131 < 6.3 E-5 uCi/cc
Beta/Gamma <2.1E-5 uCi/cc
Post accident containment samples valide for 7 hours for venting purposes
When can CAM H2/O2 system be relied upon?
If heat trace/hot were on, then data valide after 15 minutes; otherwise wait 7 hours
What is effect of starting/stopping DW coolers on PC temp and pressure
Can lead to violating containment Tech Spec limits for containment pressure and damage to MSIV pilot valves
When de-inerting, do not open vent valve unless DW/Torus pressure <0# to prevent uncontrolled release