FWLC Flashcards
When is the 3rd RFP Started? Secured?
FW Flow between 9.0 and 9.8Mlbm/hr AND RISIng (>9.0Mlbm/hr in single element
Reverse for Securing
When is 2nd FRV placed in service?
Total feed flow >5.0 Mlbm/hr
When is 2nd RFP required to be started?
When FW Flow reaches 4.5Mlbm/hr and rising
When is 3rd C/CB pp started?
Prior to 550MWe and rising
When is 4th C/CB pump started?
When RFP suction pressure approaches 250psig
When is 4th C/CB Pp Secured?
After 3rd RFP Secured and RFP Suction Pressure >230psig
When is 3rd C/B Pp Secured?
At 450MWe and lowering
When is 2nd RFP secured?
When Feedwater Flow is 4.5Mlbm/hr AND LOWERING
When is 2nd C/CB Pp Started?
Prior to RPV pressure exceeding 200psig
When is 1st C/CB Pp started?
After fill and vent of Condensate system?
When is 2nd C/CB pp secured?
When RPV pressure between 150 and 200psig
When is 1st RFP started?
Prior to RPV pressure exceeding 300psig
What is the RFP/ C/CB start sequence?
Start 1st C/CB following fill and vent
Start 2nd C/CB between 150 and 200psig RPV pressure
<300# Rx Pressure use C/CB to maitnain level
Between 250 and 300psig, start 1st RFP
Start 2nd RFP at 4.5Mlbm/hr
Start 3rd C/CB befor 550MWe or RFP suction 250psig
Start 4th C/CB when RFP approaches 250psig
Start 3rd RFP between 9-9.8Mlbm/hr (9.0 in single element)
If a single FWRV is operated in MANUAL and other is in AUTO, what will happen to the OTHER FWRV?
When moving the FRV in manual, other FRV will move automatically to balance
What will cause a FRV to auto transfer M/A station to manual?
Individual M/A Station:
Valve lockup; position signal bad, 10% error between position and demand for 15 seconds, valve in manual bypass
Master: Both individuals in manual or ALL 3 LEvel signals bad quality
Setpoint setdown does NOT funtion when MASTER CONTROLLER IN MANUAL
STPT STDN will be exited if Master controller taken to manual